Scope & Specifications
Clear technical scope with drawings, cross-sections, excavation limits, and material disposal instructions so contractors and inspectors share a single, enforceable definition of the work.
A complete Excavating Work Document reduces disputes, supports permit approvals, and documents safety and environmental controls. Clear obligations and acceptance criteria help insurers, bonding companies, and owners evaluate compliance and streamline inspection and payment processes.
Typical users who prepare or sign Excavating Work Documents include project owners, general contractors, and excavation subcontractors coordinating permits and safety.
Proper distribution among these parties prevents gaps in permits, insurance coverage, and on-site safety oversight.
Clear technical scope with drawings, cross-sections, excavation limits, and material disposal instructions so contractors and inspectors share a single, enforceable definition of the work.
Shoring, trench protection, confined-space procedures, PPE requirements, and emergency contact details to comply with OSHA and local safety codes.
Record 811 notification, marked utilities, and any private utility confirmations to reduce strike risks and document due diligence.
Define permit, mobilization, excavation start and completion dates, milestone inspections, and hold points tied to payment releases.
Include unit pricing or lump-sum amounts, retainage terms, lien waiver requirements, and performance/payment bond details where required.
List acceptance criteria, testing obligations, reporting format, and final sign-off authority to close out work and trigger release of retainage.
| Field | Configuration |
|---|---|
| Signer Order | Owner → GC → Subcontractor |
| Required Attachments | Site plan, soil report, insurance |
| Authentication | Email or SMS code |
| Notifications | Automated reminders and audit trail |
Use PDF or DOCX files for upload; include layered drawings and a single cover sheet listing permit numbers and attachments.
2–8 weeks depending on agency workload.
Call 811 at least 48 hours before digging in most jurisdictions.
Allow additional weeks if wetlands or contamination are present.
Schedule inspections several business days in advance.
Submit final documentation upon acceptance to close permits.
Permits issued and bonds posted before mobilization.
Marked utilities and 811 confirmation complete before digging.
Field verification, shoring installed, and safety briefings held.
Testing, acceptance, and release of retainage occur at this stage.
Martin Properties used signNow to manage construction documents including on-site contracts and permits.
BIS prioritized certified security and legal compliance for contract execution.
| signNow | DocuSign | Adobe Sign | PandaDoc | HelloSign | |
|---|---|---|---|---|---|
| Starting Price | $8/user/mo | $15/user/mo | $14/user/mo | $19/user/mo | $15/user/mo |
| Free Trial | 7-day free trial | Varies by vendor | Varies by vendor | Varies by vendor | Varies by vendor |
| Bulk Send | Yes | Yes | Yes | Yes | Yes |
| Audit Trail | Yes | Yes | Yes | Yes | Yes |
| HIPAA Compliant | Yes | Yes | Yes | No | No |
| Envelope Cap | No cap | 100 envelopes/user/year | Varies | Varies | Varies |