Core Details
List production title, shoot dates, call times, department leads, and contact phone or email. Accurate core details reduce scheduling conflicts and support permit and insurance verification processes.
Using a Film Production CJSAT Paper centralizes essential production data, reduces onboarding errors, and documents consent and rights clearly for each shoot. It enhances traceability for insurance and compliance reviews and helps teams meet union rules and contractual obligations more consistently.
Production managers, location managers, legal counsel, health and safety officers, and unit production accountants commonly complete this form before principal photography.
The completed paper creates an auditable record stakeholders can reference during inspections, insurance claims, and post-production rights reviews.
List production title, shoot dates, call times, department leads, and contact phone or email. Accurate core details reduce scheduling conflicts and support permit and insurance verification processes.
Record full legal names, performer stage names, union status, role descriptions, emergency contacts, and restrictions such as minors, stunts, or meal penalties to ensure cast and crew are managed per contract.
Document addresses, parcel identifiers, landowner names, permit numbers, parking plans, load-in routes, hours of operation, noise limits, and any required local notifications or indemnity clauses for location use.
Detail high-value equipment, custody chain, serial numbers, insurance values, and secure storage procedures; note items requiring special handling, hazardous materials, or export controls when applicable.
Include COVID-19 protocols if applicable, site-specific hazards, PPE requirements, emergency response contacts, nearest medical facilities, and any safety meetings or daily briefings scheduled.
Specify required signers, order of execution, witness or notary needs, date fields, and space for electronic signature metadata including signer email, IP, and timestamp for audit trails.
| Field name and intended configuration | Field | Configuration |
|---|---|
| Signing order for production roles | Sequential signing by role to ensure proper approvals. |
| Field validation rules and formats | Require MM/DD/YYYY for dates; force phone and ZIP formats. |
| Authentication method for external signers | Email link with optional SMS code or KBA as needed. |
| Audit trail capture and retention settings | Record IP, timestamp, and version history for every signature. |
Technical prerequisites and integrations to support digital completion, signing, storage, and retrieval of the CJSAT Paper across production tools.
Apply per local authority timelines; many require 30–90 days lead time.
Provide certificate naming location owner as additional insured before load-in.
Submit finalized list at least 48 hours before call time.
Obtain safety sign-off from production safety officer prior to start.
Keep signed CJSAT Paper for minimum three years; industry may require longer.
Identify locations, insurance needs, and permitting requirements; begin permit applications.
Record daily custody, safety checks, and equipment movements during each shoot day.
Confirm asset returns, payroll sign-offs, expense reconciliations, and release clearances.
Store signed records, maintain audit logs, and make them accessible for claims.
| signNow | DocuSign | Adobe Sign | PandaDoc | HelloSign | |
|---|---|---|---|---|---|
| Starting Price | $8/user/mo | $15/user/mo | $14/user/mo | $19/user/mo | $15/user/mo |
| Free Trial | 7-day free trial | Check vendor site | Check vendor site | Check vendor site | Check vendor site |
| Bulk Send | Yes (Business Premium) | Varies by plan | Varies by plan | Varies by plan | Varies by plan |
| Audit Trail | Yes | Yes | Yes | Yes | Yes |
| HIPAA Compliant | Yes (BAA available) | Yes | Yes | No | No |