Plan Views
Scaled floor plans showing device locations, coverage areas, and mounting heights with reference sheet numbers and north arrows for orientation.
Clear, code-compliant drawings reduce inspection delays, limit rework, and document system performance. Proper drawings establish responsibilities for installation and maintenance, and they serve as the official record used by the authority having jurisdiction, insurers, and building owners. Electronic signatures and retained records can meet federal e-signature frameworks such as the ESIGN Act (15 U.S.C. ch. 96) and intrastate UETA requirements where adopted.
Each party uses the drawings for different lifecycle phases: design submission, field installation, code inspection, and long-term maintenance.
Scaled floor plans showing device locations, coverage areas, and mounting heights with reference sheet numbers and north arrows for orientation.
Single-line riser illustrating panel locations, NAC circuits, NAC supervision, power supplies, and interconnections between panels and remote annunciators.
Tagged list of devices with model numbers, voltage, circuit IDs, coverages, and manufacturer installation notes for procurement and testing.
Details on primary power, standby battery sizing, circuit loading, conduit types, and short-circuit current ratings for electrical compliance.
Symbol key, abbreviations, code references (for example NFPA 72), testing notes, and any special installation instructions.
Licensed professional's signature, stamp or seal, and revision block showing dates and approvals for permit review and recordkeeping.
| Field | Configuration |
|---|---|
| Authentication Method | Email plus optional SMS code |
| Required Fields | Signature, printed name, date, license number |
| File Formats | PDF for review; retain original CAD offline |
| Audit Trail | Capture IP, timestamp, and signer audit log |
For CAD-origin files, export verified PDFs for e-signing and keep original DWG/CAD files in project repositories for engineering reference.
Allow 2–6 weeks for AHJ plan review depending on jurisdiction.
Plan 1–3 weeks for preparing and resubmitting revisions.
Expect 1–4 weeks to book a field inspection after installation.
Multiple cycles can extend approval by several weeks.
Receive permit closeout only after successful inspection and documentation.
| signNow | DocuSign | Adobe Sign | PandaDoc | HelloSign | |
|---|---|---|---|---|---|
| Starting Price | $8/user/mo | $15/user/mo | $14/user/mo | $19/user/mo | $15/user/mo |
| Free Trial | 7-day free trial | Varies | Varies | Varies | Varies |
| Bulk Send | Yes | Yes | Yes | Yes | No |
| Audit Trail | Yes | Yes | Yes | Yes | Yes |
| HIPAA Compliant | Yes | Yes | Yes | No | No |
Large facility retrofit required phased drawings for each department
Contractor prepared combined electrical and alarm sets for permit submission