Fire Stopping Assessment Form

This template is fully customizable. Edit the text, fill out the fields, and send it for signature. Give it a try!

Fire Stopping Assessment Form

This Fire Stopping Assessment Agreement and Report (the Agreement) is made between Client Name: and Assessor Name: . Project Address: Report ID:

WHEREAS

WHEREAS, Client Name: desires an independent assessment of fire stopping installations and penetrations at the Project Address described above; and

WHEREAS, Assessor Name: represents that it is qualified to perform such assessments in accordance with accepted industry practice and agrees to perform the services under the terms of this Agreement.

NOW, THEREFORE, in consideration of the mutual covenants set forth herein, the parties agree as follows:

Assessment Details

Scope of Work

The Assessor will inspect identified penetrations, joints, and fire-resistive barriers to evaluate the presence and condition of fire stopping systems, document deficiencies, and provide remediation recommendations. The scope includes visual inspection only; no destructive testing is included unless expressly agreed in writing.

Itemized Findings (up to three entries)

Item 1

Status:

Item 2

Status:

Item 3

Status:

Priority:

Photographs attached: Number of photos: Attachments included:

Payment Terms

Fee: Client shall pay Assessor the fees described below for the assessment services. All amounts are due in accordance with the schedule set forth and are exclusive of applicable taxes unless otherwise stated.

Late payments shall incur a fee of % per month on the outstanding balance, or the maximum allowed by law, whichever is less. Invoices not paid within 30 days of the invoice date will be considered delinquent.

Term and Termination

This Agreement commences on Start Date: and continues until End Date: unless earlier terminated in accordance with this section.

Either party may terminate this Agreement for convenience upon providing written notice at least days prior to the termination date. Material breach by either party that is not cured within 10 days of written notice shall permit the non-breaching party to terminate immediately.

Confidentiality

Each party shall treat all non-public information, reports, findings, drawings, photographs, and other materials exchanged in connection with this Agreement as Confidential Information. Confidential Information shall not be disclosed to third parties except as required by law or with the prior written consent of the disclosing party. Upon termination or request, the receiving party shall return or certify destruction of Confidential Information, except for one archived copy for legal compliance.

Assessor Certification

The Assessor certifies that the inspection was performed by qualified personnel and that the findings set forth in this report accurately reflect the conditions observed at the time of inspection. The Assessor does not warrant performance of installed systems beyond visual observation unless specified testing was performed and documented.

Governing Law

This Agreement shall be governed by and construed in accordance with the laws of the State of without regard to conflicts of law principles.

Entire Agreement

This Agreement, together with all attachments and referenced documents, constitutes the entire agreement between the parties with respect to the subject matter hereof and supersedes all prior and contemporaneous agreements, proposals, and communications, whether written or oral.

Acceptance and Acknowledgment

By signing below, the parties acknowledge that they have read, understand, and agree to be bound by the terms of this Agreement and that the assessment results and recommendations will be relied upon for repair planning and compliance actions.

Client Name:

By:

Date:

Assessor Name:

By:

Date:

Enter text✕

What the Fire Stopping Assessment Form Is

The Fire Stopping Assessment Form documents penetration points, firestopping materials, and installation status for walls, floors, ceilings, and service penetrations. It records location identifiers, construction type, tested system ratings, and the responsible contractor or inspector. The form supports evidence of compliance with model building codes and fire-resistance ratings, captures photographs and inspection dates, and notes corrective actions or rework required. It is used to track fire containment integrity throughout construction, renovation, and maintenance and to provide an auditable record for authorities having jurisdiction and facility managers.

Why consistent firestopping documentation matters

Use the Fire Stopping Assessment Form to create a consistent, auditable record of firestopping installations, demonstrate code compliance to authorities, and reduce risk from unsealed penetrations. Standardized documentation improves corrective action tracking and supports contractor accountability during construction and maintenance.

Why consistent firestopping documentation matters

Who completes and relies on these forms

Typical users who complete or review the Fire Stopping Assessment Form include contractors, inspectors, and facility managers responsible for fire containment.

  • Firestopping contractors performing installations and documenting system and material details on site.
  • Third-party fire protection inspectors verifying compliance with tested assemblies and sealing methods.
  • Facility managers or owners who retain records for maintenance, audits, and AHJ reviews.

Each role uses the form differently: installers capture installation details; inspectors record conformity; owners maintain the file for ongoing maintenance and compliance.

Core sections every professional form should include

A comprehensive Fire Stopping Assessment Form includes fields for location, materials, measurements, photos, conformity notes, and approval signatures to support compliance and future maintenance.

Location

Describe building, floor, room, and penetration identifier; include grid coordinates if available. Precise location data allows quick re-inspection, links photos to records, and is required for AHJ referencing during plan reviews.

Materials

Record manufacturer, product name, model or part number, installation batch, and expiry where applicable. This detail verifies the installed products match tested assemblies and supports warranty, recall tracking, and future maintenance decisions.

Measurements

Capture opening width, depth, penetration diameter, and annular space measurements in consistent units. Include tolerances and any deviations from the tested configuration. Accurate measurements are critical to validate fire-resistance performance.

Photographs

Attach high-resolution images showing the penetration before and after sealing, with a scale or tape reference. Store originals with filenames matching the location ID for unambiguous cross-referencing during audits.

Conformity Notes

Document whether the installation follows the tested system instructions; list deviations, cause, and recommended remediation. Note AHJ comments and final acceptance status to create a complete compliance record.

Signatures

Capture printed name, title, company, signature, and date for the inspector and installing contractor. When permitted, also capture an electronic audit trail showing IP, timestamp, and authentication method for evidentiary support.

Step-by-step: completing the form in the field

Follow these steps to complete the Fire Stopping Assessment Form accurately during field inspection and post-install verification.

  • 01
    Locate Penetration: Identify location, assembly type, and unique location ID.
  • 02
    Record Materials: List sealants, collars, wraps, and firestop systems used.
  • 03
    Photograph & Measure: Take clear photos and record penetration dimensions.
  • 04
    Inspect & Sign: Verify installation against tested assembly and sign off.

Configuring an online workflow

Configure an online form workflow for the Fire Stopping Assessment Form to automate routing, reminders, and record export.

Field Name and Configuration Purpose Value or behavior in online workflow
Required Field Behavior and Validation Mark mandatory fields and enable validation rules
Authentication Method and Strength for signer Email link, SMS code, or KBA per project needs
Routing and Notifications Settings per role Sequential or parallel routing; reminders and escalation rules
Export and Storage Options and retention PDF/A export, audit trail included; store in project folder

Where completed forms typically go

Typical routing and submission destinations for completed Fire Stopping Assessment Forms during construction and maintenance.

  • To Contractor: Stored in contractor project folder and sent to foreman.
  • To AHJ: Provide copy to authority having jurisdiction per request.
  • To Owner: Owner receives final report for maintenance and warranty records.
  • To Cloud Storage: Export to Box, Procore, or project ECM with audit trail.

Digital signing and integration requirements

Digital submission and signing options depend on integrations, authentication, and file formats supported by your platform.

  • Supported Formats: PDF, DOCX, and image attachments allowed.
  • Authentication: Email, SMS code, or two-factor options.
  • Integrations: Connect to Procore, NetSuite, MS 365, Box.

Essential data points to capture

Required Fields: Location, materials, date, inspector.
Photo Evidence: High-resolution images of each penetration.
Tested Assembly: Reference UL/ASTM system number.
Installation Notes: Depth, backing, gaps, deviations.
Signatures: Inspector and contractor sign.
Revision History: Date-stamped corrections and reviewer.

Common preparation and documentation pitfalls

  • Incomplete location identifiers prevent correlating photos and reports, forcing repeat inspections and delaying sign-off and corrective scheduling.
  • Using non-tested materials or undocumented substitutions undermines the fire-resistance rating and may require full system re-evaluation.
  • Poor photo quality or missing scale references make verification difficult and increase the likelihood of AHJ rejection.
  • Failure to document corrective actions with dates, responsible parties, and signatures impedes warranty claims and future audits.

Consequences of incorrect or missing documentation

Code Noncompliance: AHJ may issue stop-work or remediation orders.
Project Delays: Remediation can delay occupancy certification.
Increased Liability: Higher risk of property damage and claims.
Warranty Issues: Manufacturer warranties may be voided.
Insurance Impact: Claims may be denied or premiums raised.
Inspection Rejection: Failed inspections require costly rework.

Practical examples from field use

Real-world examples show how contractors and owners use the Fire Stopping Assessment Form for compliance, turnover, and maintenance records.

Midrise Contractor

A midrise general contractor used the Fire Stopping Assessment Form to consolidate multiple subcontractor entries across 120 units during a phased build.

  • Saved reinspection time and clarified responsibilities.
  • Standardized entries and photo linkage reduced duplicate site visits, allowed immediate AHJ review of completed penetrations, and created a single project record accepted at turnover. The general contractor integrated the form into their project ECM for ongoing maintenance access.

Hospital Renovation

During a hospital renovation, the firestopping subcontractor used the form to document sealing around medical gas and HVAC penetrations in critical care zones.

  • Ensured HIPAA-safe recordkeeping and AHJ acceptance.
  • The documentation was filtered to remove PHI and stored under a BAA-compliant workflow; inspectors signed electronically and the facility retained records six years per HIPAA guidance, simplifying future audits and warranty claims.

Quality control practices to reduce rework

Practical tips to improve accuracy and reduce inspection cycle time when using the Fire Stopping Assessment Form.

Standardize location identifiers across trades
Use a project-wide naming convention for location IDs, require photo filenames to include that ID, and mandate measurement units. Consistency eliminates ambiguity, reduces rework, and speeds AHJ review by enabling automated matching of photos, records, and corrective actions.
Require pre-installation material submittals and approvals
Collect manufacturer cut sheets and tested assembly certificates before installation. Approve materials in writing and attach approval references to the form. Pre-approval reduces on-site substitutions and provides clear traceability when validating installed systems against tested configurations.
Use clear photographic standards and scale references
Require at least two photos per penetration: one wide view showing location context and one close-up with a measuring scale. Include before-and-after shots when remediation occurs and ensure filenames match location IDs for automatic cross-referencing.
Preserve audit trails and backups
Store signed forms with embedded audit trails and exportable PDFs. Backup records in a secure project ECM and retain originals for the period required by contract and regulation. Ensure access controls and periodic integrity checks are in place.

eSignature vendor comparison for Fire Stopping Assessment Forms

Compare eSignature vendors for signing and storing Fire Stopping Assessment Forms; signNow is listed first per pricing and capability differences.

signNow DocuSign Adobe Sign PandaDoc HelloSign
Starting Price $8/user/mo $15/user/mo $14/user/mo $19/user/mo $15/user/mo
Free Trial Yes, 7-day trial Varies by plan Varies by plan Varies by plan Varies by plan
Bulk Send Yes Yes Yes Yes No
Audit Trail Yes Yes Yes Yes Yes
HIPAA Compliant Yes Yes Yes No No

Who has authority to sign

Project Inspector

A licensed fire protection inspector or third-party testing agency is often responsible for final verification. They confirm installations match tested assemblies, complete the form with signatures and photographs, and provide corrective action items. Their certification may be required for AHJ acceptance.

Responsible Contractor

The installing contractor or firestop sub-contractor documents installation details and corrects deficiencies. Their foreperson usually signs to accept work, coordinates rework, and maintains a copy in the contractor project file for warranty and dispute resolution.

FAQs and troubleshooting for the form