Scope of Work
Define underpinning methods, work limits, staging, soil treatment, required drawings, and deliverables including as-built documentation and monitoring plans.
A clear Foundation Underpinning Agreement reduces project risk by defining technical scope, inspection and permit responsibilities, insurance requirements, timelines, and dispute resolution. Precise terms protect owners, contractors, and lenders from unexpected costs, schedule slips, and structural liability.
The Foundation Underpinning Agreement is used by parties involved in structural stabilization or subsurface support work.
Use the agreement to document scope, approvals, and financial terms before work begins to reduce downstream disputes.
An authorized officer, manager, or individual with title to the property should sign. If the owner is an entity, the signer must have corporate authority; mismatched signatories can render the agreement unenforceable and complicate insurance and lien issues.
A licensed contractor or an authorized company representative should sign. When professional design or inspection obligations exist, a licensed engineer or their authorized agent should countersign to confirm technical responsibilities and acceptance criteria.
Define underpinning methods, work limits, staging, soil treatment, required drawings, and deliverables including as-built documentation and monitoring plans.
Reference applicable codes and standards, engineer designs, inspection checkpoints, acceptable tolerance levels, and monitoring instrumentation requirements.
Assign responsibility for permit applications, plan approvals, utility locate obligations, and any required municipal or county inspections.
Include mobilization date, critical milestones, completion deadline, weather contingencies, and liquidated damages or incentive terms if applicable.
State contract price, progress payment schedule, retainage, change order procedures, and required lien waivers for each payment.
Specify required coverages, limits, additional insured endorsements, hold harmless clauses, and notice procedures for claims.
| Field | Configuration |
|---|---|
| Authentication | Use email plus SMS code for signer verification where required |
| Reminders | Schedule automatic reminders at 3 and 7 days after initial request |
| Notarization | Enable RON or request in-person notarization based on state rules |
| Attachments | Attach engineer drawings and insurance certificates as required documents |
The agreement should be prepared and stored in formats that preserve signatures, attachments, and audit trails.
Ensure your eSignature provider supports audit trails, optional RON notarization, and the integrations you need for project workflows.
Submit before mobilization; municipal review times vary by jurisdiction
Start date for on-site work as defined in the schedule
Regular inspection and instrumentation checkpoints during underpinning
Substantial completion date when work meets acceptance criteria
Engineer inspection and municipal acceptance complete the record
Plan acceptance and permit issuance before mobilization
Utility marking, shoring, and safety setup prior to excavation
Phased underpin work with inspection points and monitoring
Final inspection, as-built delivery, and lien release procedures
| signNow | DocuSign | Adobe Sign | PandaDoc | HelloSign | |
|---|---|---|---|---|---|
| Starting Price | $8/user/mo | $15/user/mo | $14/user/mo | $19/user/mo | $15/user/mo |
| Free Trial | 7-day free trial | Varies | Varies | Varies | Varies |
| Bulk Send | Yes | Yes | Yes | Yes | No |
| Audit Trail | Yes | Yes | Yes | Yes | Yes |
| HIPAA Compliant | Yes | Yes | Yes | No | No |