Parties
Full legal names and contact details for owner, contractor, subcontractors and material suppliers; include business type and single point of contact for notices.
A detailed agreement reduces disputes, confirms expectations and documents payment and warranty terms. Proper execution and retention support enforceability under the ESIGN Act (15 U.S.C. ch. 96) and UETA when electronic signing is used.
This agreement is used by parties who need a formal record of installation obligations, cost and acceptance criteria.
Clear role definitions help with permitting, insurance claims, lien rights and warranty enforcement.
A licensed contractor or corporate officer signs to confirm scope, pricing, timeline, proof of insurance and warranty obligations. The signer must have authority to bind the company and to accept change-order procedures and indemnity provisions on behalf of the contractor.
The property owner or authorized agent signs to accept work, authorize payment and confirm access. If the owner is an entity, use the full legal entity name and a signatory with documented authority to avoid enforceability issues.
Full legal names and contact details for owner, contractor, subcontractors and material suppliers; include business type and single point of contact for notices.
Detailed description of surface preparation, moisture mitigation, substrate repair, finish type (epoxy, polyaspartic, tile), square footage and exclusions.
List brands, product codes, colors, thicknesses, surface tolerances and acceptable substitutes; include manufacturer datasheets as exhibits when relevant.
Total contract price, deposit amount, schedule of progress payments, retainage, late fees, and procedures for change orders and additional work authorizations.
Start and completion dates, milestone deadlines, weather and site delay allocation, notice requirements for schedule changes and remedies for missed deadlines.
Specify workmanship warranty, product warranty, limitations, indemnities, insurance minimums and procedures for warranty claims and repairs.
| Field | Configuration |
|---|---|
| Signature Type | Electronic signature | Choose audit-trail or PKI where required |
| Authentication | Email link or SMS code | Use stronger auth for high-value contracts |
| Template | Save reusable template | Pre-place fields and conditional sections |
| Notifications | Set reminders and completion notices | Route signed copies automatically |
Select a platform that supports audit trails, secure storage and integrations with your systems.
Maintain tamper-evident copies, enable secure role-based access, and confirm platform compliance with ESIGN/UETA and any industry-specific requirements before relying on electronic execution.
Specify how long the proposal price remains valid, commonly 30–60 days.
Set the earliest expected mobilization date and any conditions for delay.
State the substantial completion deadline and final acceptance criteria.
Define when warranty periods begin, often at final acceptance or payment.
Specify net terms for final payment (e.g., Net 30) and late payment remedies.
Owner signs and deposit is collected to confirm project authorization.
Supplier lead times begin; confirm delivery windows to avoid delays.
Site is prepared and installation work commences under defined safety protocols.
Owner inspects work; punch list and final payment commute to closeout.
| signNow | DocuSign | Adobe Sign | PandaDoc | HelloSign | |
|---|---|---|---|---|---|
| Starting Price | $8/user/mo | $15/user/mo | $14/user/mo | $19/user/mo | $15/user/mo |
| Free Trial | 7-day free trial | Varies by vendor | Varies by vendor | Varies by vendor | Varies by vendor |
| Bulk Send | Yes | Yes | Yes | Yes | No |
| Audit Trail | Yes | Yes | Yes | Yes | Yes |
| HIPAA Compliant | Yes | Yes | Yes | No | No |