Scope Description
Precise scope including pipeline segments, mains, service lines, pressure classes, materials, excavation limits, and excluded items; use attachment references for drawings and specs.
A precise Statement of Work reduces scope drift, clarifies compliance obligations, limits disputes, and provides measurable acceptance criteria for commissioning and handover. It aligns safety, permitting, and commercial terms so stakeholders can coordinate inspections, testing, and payments against documented milestones.
Precise scope including pipeline segments, mains, service lines, pressure classes, materials, excavation limits, and excluded items; use attachment references for drawings and specs.
List deliverables such as as-built drawings, pressure test results, cathodic protection reports, material certificates, and commissioning certificates with acceptable formats and sign-off requirements.
Baseline schedule with key milestones: NTP, permit acquisition, mobilization, testing windows, and final commissioning acceptance criteria tied to dates or durations.
Safety requirements, HSE responsibilities, required certifications, hot-work permits, regulatory inspections, and references to applicable federal and state pipeline safety rules.
Payment schedule linked to accepted milestones, invoicing instructions, retainage, and a defined change order procedure including documentation and approval chain.
Concrete tests and tolerances (pressure test durations, leakage thresholds, inspection checklists) and the form of accepted documentation for handover.
| Field | Configuration |
|---|---|
| Signer Order | Sequential approvals: Owner → PM → Contractor |
| Authentication | Email + SMS code for external signers |
| Attachments | Attach drawings and certificates to workflow |
| Reminders | Auto reminders at 3, 7, and 14 days |
Use an eSignature platform that supports secure authentication, audit trails, and retention for later inspection.
Date when contractor may mobilize; often within 7–14 days after contract signature
Permitting windows vary; begin applications at least 30–90 days before mobilization
Schedule tests per specification; provide results within 7 days of completion
Occurs after all punch-list items and documentation are approved
Tie invoices to accepted milestones with defined payment terms
Signers finalize contractual terms and authorizations.
Contractor mobilizes staff and equipment to site.
Execute pressure and leak tests to acceptance criteria.
Owner accepts work after documentation and corrections.
A regional contractor eliminated paper by routing SOWs digitally to field leads for signature.
A project owner centralized SOW versions in a document management system for all contractors.
| signNow | DocuSign | Adobe Sign | PandaDoc | HelloSign | |
|---|---|---|---|---|---|
| Starting Price | $8/user/mo | $15/user/mo | $14/user/mo | $19/user/mo | $15/user/mo |
| Free Trial | 7-day free trial | Yes | Yes | Yes | Yes |
| Bulk Send | Yes | Yes | Yes | Yes | No |
| Audit Trail | Yes | Yes | Yes | Yes | Yes |
| HIPAA Compliant | Yes | Yes | Yes | No | No |
Multiple stakeholders prepare, review, and sign SOWs for gas distribution projects; responsibilities vary by role and organization.
Ensure each signer is authorized to bind their organization; include signature authority and title in the signature block.
The owner’s authorized project manager signs to confirm scope, budget alignment, and acceptance criteria. They coordinate permits, inspections, and final acceptance and serve as the project representative for change orders.
Contractor signatory (company officer or delegated representative) accepts commercial terms, warranty obligations, and safety responsibilities, and certifies that crews meet qualification requirements.