GLASS PANEL ATC AGREEMENT

This Glass Panel Acceptance and Transfer Certificate Agreement (the Agreement) is entered into as of between Client Name: having an address at and Supplier Name: having an address at .

WHEREAS

WHEREAS, Supplier manufactures, supplies and installs architectural glass panels described herein and Client desires to procure such panels and accept completed panels following inspection and testing; and

WHEREAS, the parties intend that transfer of title and final payment shall be conditioned upon satisfactory completion of acceptance testing and issuance of the Acceptance Test Certificate (ATC) in accordance with the acceptance criteria set forth in this Agreement;

WHEREAS, the parties agree to record the terms of manufacture, delivery, inspection, and transfer of ownership and related warranties and obligations in this Agreement.

PROJECT & PANEL DETAILS

SCOPE OF WORK

ACCEPTANCE TESTING & ATC PROCEDURE

Supplier shall perform factory and/or site acceptance tests in accordance with agreed specifications. Inspection date: . Tests shall include structural inspection, edgework, laminate integrity, and visual quality assessment. Acceptance criteria shall include absence of structural defects, conformance to specified tolerances, and visual acceptability as set forth in the Scope of Work.

If panels pass inspection, Supplier will issue an Acceptance Test Certificate (ATC) stating the inspected panels, serial or marking identifiers, and the date of acceptance. Title to accepted panels and risk of loss shall transfer to Client upon issuance of the ATC and receipt of any final payment required by the Payment Terms below.

If panels fail to meet acceptance criteria, Supplier shall, at its expense, repair or replace nonconforming panels within the timeframe set forth in the Scope of Work. Re-inspection shall be performed following remedial work.

PAYMENT TERMS

Unless otherwise agreed in writing, amounts not paid when due accrue interest at the rate set forth above and Client shall be responsible for all collection costs, including reasonable attorneys' fees, incurred by Supplier in enforcing payment.

TERM AND TERMINATION

This Agreement commences on and continues until unless earlier terminated in accordance with this section.

Either party may terminate this Agreement for material breach by the other party if the breach is not cured within the notice period set forth above after written notice specifying the breach. Termination shall not relieve Client of its obligation to pay for work performed and accepted prior to the effective date of termination, nor relieve Supplier of obligations to correct defects covered by warranty.

CONFIDENTIALITY

Each party shall keep confidential and shall not disclose to any third party any non-public technical, commercial, or financial information of the other party disclosed in connection with this Agreement. Confidential information does not include information that is or becomes publicly known through no breach of this Agreement or that is lawfully obtained from a third party without restriction.

WARRANTY & REMEDIES

Supplier warrants that accepted panels shall be free from material defects in materials and workmanship for a period of from issuance of the ATC. Supplier's sole obligation under this warranty shall be, at Supplier's option, repair or replacement of defective panels. This warranty does not cover damage resulting from misuse, improper installation by others, vandalism, acts of God, or normal wear and tear.

CHANGE ORDERS

Any changes to the Scope of Work, quantities, materials, or schedule shall be documented in a written change order signed by authorized representatives of both parties. Change orders shall specify adjustments to price, schedule, and any other impacted terms and shall form part of this Agreement when executed.

INDEMNITY & LIABILITY

Each party agrees to indemnify, defend and hold harmless the other party from third party claims arising from its negligent acts or omissions in the performance of this Agreement. Except for liability arising from willful misconduct or gross negligence, neither party shall be liable for consequential or punitive damages.

GOVERNING LAW

This Agreement shall be governed by and construed in accordance with the laws of without regard to conflict of laws principles.

ENTIRE AGREEMENT

This Agreement, together with any executed change orders and the Scope of Work, constitutes the entire agreement between the parties with respect to the subject matter hereof and supersedes all prior written or oral understandings. No amendment or waiver shall be effective unless in writing and signed by authorized representatives of both parties.

MISCELLANEOUS

If any provision of this Agreement is held invalid or unenforceable, the remaining provisions will remain in full force and effect. Neither party may assign its rights or obligations under this Agreement without the prior written consent of the other party, except to an affiliate or successor by merger or sale of substantially all assets.

Party A (Client) - Printed Name:

By:

Date:

Party B (Supplier) - Printed Name:

By:

Date:

Enter text✕

What the Glass Panel ATC Template Is

The Glass Panel ATC Template is an Acceptance Test Certificate used to record inspection, testing, and sign-off for architectural or structural glass panel installations. It documents test results (air/water infiltration, structural load, visual defects), references applicable project specifications and codes, and captures responsible parties, dates, and corrective actions. The template is intended for use by contractors, glazing subcontractors, third-party inspectors, and owners to create a clear, auditable record that demonstrates panels met contract requirements before final payment or occupancy acceptance.

Why a Formal ATC Matters for Glass Panel Projects

A structured ATC creates a single, auditable record of testing and acceptance that reduces disputes, clarifies responsibility for defects, and supports warranty enforcement. It standardizes what tests were run, tolerances used, and corrective actions required.

Why a Formal ATC Matters for Glass Panel Projects

Who Typically Completes or Signs This Template

The Glass Panel ATC is completed by parties directly involved in glazing installation, testing, and project acceptance; signers vary by project delivery model.

  • General Contractor or Project Manager — certifies overall acceptance and linkage to contract milestones; confirms payment conditions and punch-list items.
  • Glazing Subcontractor or Manufacturer Representative — provides test data, procedural details, and corrective action descriptions related to panel fabrication or installation.
  • Third-Party Inspector or Testing Lab — documents independent test results, instrumentation used, ambient conditions, and pass/fail determinations for compliance.

Stakeholder clarity on who signs each section reduces processing delays and improves accountability throughout commissioning and closeout.

Core Sections to Include in a Professional ATC

A complete Glass Panel ATC groups project identifiers, test results, nonconformance records, corrective actions, signatures, and attachments so reviewers can verify compliance quickly and consistently.

Project ID

Include project name, address, contract number, drawing/revision references, and client name so the certificate links to the exact scope and contract documents.

Panel Identification

Record panel type, mark/tag numbers, glazing configuration, dimensions, frame type, and location so each tested unit can be uniquely traced on-site and in shop records.

Test Matrix

List the specific tests performed (air infiltration, water penetration, structural load, glass thickness, visual inspection), test standards, equipment, and acceptance criteria used.

Results Summary

Provide pass/fail per test, measured values versus tolerances, ambient conditions, and any deviations requiring corrective action or retest before final acceptance.

Corrective Actions

Document required remediation steps, responsible party, completion dates, and verification steps to close nonconformances prior to final sign-off.

Approvals

Signature blocks for installer, inspector, and owner representative, with printed name, title, organization, date, and optional notarization or witness fields if required.

Required Fields and Key Data Elements

Project Reference: Contractor name and job number
Panel Tag: Unique identifier or shop drawing mark
Test Type: Air/water/structural/visual
Standard Cited: ASTM / AAMA reference
Result Status: Pass, Fail, or Conditional
Signatures: Names, titles, and dates

Step-by-Step: Completing the Glass Panel ATC

Follow a consistent sequence: identify unit, record conditions, perform tests, note results, document corrective actions, and obtain required approvals to create a defensible acceptance record.

  • 01
    Identify Unit: Enter project and panel tag before testing begins.
  • 02
    Record Conditions: Note weather, temperature, and equipment calibration details.
  • 03
    Execute Tests: Perform tests per cited standards and record measured values.
  • 04
    Sign and Archive: Have required parties sign and store the completed ATC.

How to Configure an Online ATC Workflow

Set up roles, fields, and routing in sequence so documents reach inspectors and approvers automatically and retain a complete audit trail.

Field Configuration
Panel Tag Required text field, validation pattern
Test Date Date picker, MM/DD/YYYY
Result Dropdown Options: Pass | Fail | Conditional
Signer Role Inspector → Contractor → Owner

Where to Send or File the Completed ATC

Define destinations for final ATCs: the project record, owner file, contractor closeout package, and any regulatory or warranty repositories.

  • Owner Representative: Deliver final signed copy to the owner for acceptance records.
  • Contractor Records: Retain original in project closeout folder and digital archive.
  • Third-Party Inspector: Provide a copy to testing lab or inspector for their file.
  • Warranty Provider: Send evidence to manufacturer or insurer when required.

Digital Signing and Sharing: Platform Needs

Choose a platform that supports fillable PDFs, clear audit trails, role-based routing, and secure storage to preserve evidentiary value.

  • File Formats: PDF, DOCX supported
  • Integrations: Connectors for MS 365 and Procore
  • Authentication: Email, SMS, or stronger options

Ensure the selected solution meets record retention and authentication requirements for your jurisdiction and industry before relying on electronic signatures.

Typical Timelines and Processing Expectations

Project teams should set clear timing for tests, remediation, sign-off, and archival to avoid hold-ups in inspections, occupancy, or final payment.

Testing Window:

Complete tests within the scheduled commissioning period prior to final inspection.

Remediation Timeframe:

Allow a defined cure period for failed tests—often 7–30 days depending on scope.

Final Acceptance:

Obtain signatures before release of final retainage or closeout payment.

Record Archival:

Store signed ATCs in the project record within 7 days of completion.

Retest Scheduling:

Schedule retests promptly after corrective actions; delay may affect warranty coverage.

Common Preparation and Submission Errors

  • Missing or inconsistent panel tags that prevent matching results to installed units and delay acceptance.
  • Omitting test standard references or instrument calibration details, which weakens the evidentiary value of results.
  • Incomplete corrective action records that leave nonconformances unresolved at final sign-off.
  • Signatures lacking dates, titles, or organizational affiliation that complicate responsibility and warranty claims.

Risks if the ATC Is Incorrect or Incomplete

Warranty Denial: Loss of warranty coverage
Payment Delay: Retainage or final payment withheld
Liability Exposure: Increased contractor liability
Regulatory Noncompliance: Failed inspections or correction orders
Insurance Claim Issues: Coverage disputes on defects
Schedule Impact: Project closeout delays

eSignature Vendor Pricing Snapshot for ATC Workflows

Compare common vendor attributes important for ATC templates: starting price, trial availability, bulk-send capability, audit trails, HIPAA support, and envelope limits.

signNow DocuSign Adobe Sign PandaDoc HelloSign
Starting Price $8/user/mo $15/user/mo $14/user/mo $19/user/mo $15/user/mo
Free Trial 7-day free trial Varies by plan Varies by plan Varies by plan Varies by plan
Bulk Send Yes Yes Yes Yes No
Audit Trail Yes Yes Yes Yes Yes
HIPAA Compliant Yes Yes Yes No No
Envelope Cap No envelope cap 100 envelopes/user/year Varies by plan Varies by plan Varies by plan

Practical Examples of ATC Use in Projects

Two common scenarios illustrate how the Glass Panel ATC reduces disputes and accelerates closeout when properly completed and stored.

High-Rise Façade Project

A contractor documents air and water infiltration tests for 120 panel units

  • Two failed tests identified during commissioning
  • Corrective glazing replacement documented, retested, and final ATC signed, enabling release of retainage and avoiding occupancy delay.

Commercial Retrofit

A property manager requires factory test reports and on-site structural checks

  • Conditional acceptance issued with remediation plan
  • Completed repairs verified by third-party lab and final ATCs added to warranty folder for tenant handover.

FAQs About Using the Glass Panel ATC Template

Answers to typical questions about electronic signatures, notarization, signatory authority, and record retention for ATCs used on U.S. projects.


Need help? Contact support

be ready to get more
Join over 28 million airSlate SignNow users