Site Identification
Project name, address, permit number, and contractor information so the grounding record ties precisely to the permit and site files for inspections and future reference.
A fully populated form provides a durable record for inspectors, owners, and contractors; it reduces rework, supports code compliance at final inspection, and creates an auditable trail for liability and maintenance needs.
The Grounding Details Form is completed by technical staff and shared with reviewers for safety and permitting.
Proper assignment of responsibilities keeps the approval flow efficient and the record defensible.
An on-site licensed electrician enters installation details and test readings, certifies accuracy, and signs off on the workmanship. Their signature indicates responsibility for code-compliant grounding practices and supports inspection acceptance.
The project manager confirms that the submitted grounding documentation aligns with contract specifications, schedules, and client requirements, and retains the completed form in the project record for handover.
Project name, address, permit number, and contractor information so the grounding record ties precisely to the permit and site files for inspections and future reference.
Description of grounding electrodes (rod, plate, Ufer, water pipe), materials, electrode quantities, and the method of bonding used on site.
Grounding conductor sizes, types, routing, connection points, and termination methods to confirm compliance with conductor ampacity and code rules.
Measured resistance and continuity values, test method (fall-of-potential, clamp-on), test date/time, tester name, and instrument make/model for traceability.
Space for inspector name, agency, signature or e-sign evidence, date, and brief inspection findings to support permit closure and acceptance.
Photos of electrodes and connections, site diagrams, and calibration certificates for test equipment; these attachments corroborate the recorded data.
| Field | Configuration |
|---|---|
| Required Fields | Project Name | Installer | Test Date | Measured Resistance |
| Attachments | Photos required for electrode and termination evidence |
| Routing | Route to inspector → project manager → owner |
| Notifications | Email and SMS reminders for pending signers |
Ensure the platform you choose supports the file formats, attachments, and authentication your jurisdiction and inspector require.
Submit completed form and attachments prior to the scheduled final electrical inspection.
Provide the form when the permit requires documentation for final approval.
Include the form in project handover packages for warranty and maintenance records.
Resubmit updated readings after any repairs or rework is completed.
Keep a signed copy per retention guidance in the retention timeline section.
| Document | Required for Permit | Notarization Typical |
|---|---|---|
| Grounding Details Form | sometimes required | not typically required |
| Electrical Permit Application | may require notarization | |
| Equipment Grounding Affidavit | sometimes required | may require notarization |
| As-Built Electrical Report | often required for closeout | not typically required |
| signNow | DocuSign | Adobe Sign | PandaDoc | HelloSign | |
|---|---|---|---|---|---|
| Starting Price | $8/user/mo | $15/user/mo | $14/user/mo | $19/user/mo | $15/user/mo |
| Free Trial | 7-day free trial | Varies by vendor | Varies by vendor | Varies by vendor | Varies by vendor |
| Bulk Send | Yes | Yes | Yes | Yes | Varies |
| Audit Trail | Yes | Yes | Yes | Yes | Yes |
| HIPAA Compliant | Yes | Yes | Yes | No | No |