Scope of Work
Clear description of equipment, locations, and any electrical or structural modifications so installers and inspectors share expectations.
A signed authorization clarifies who may permit access and perform work, documents agreed scope and timing, and helps satisfy permitting, warranty, and insurance requirements.
The form is used by property owners, installers, and property managers to record consent and responsibilities before installation.
Accurate completion reduces scheduling delays, supports inspections, and protects both owners and contractors from post-installation disputes.
The property owner signs to grant permission for installation, to verify property address and legal authority, and to acknowledge budget, schedule, and access windows. Their signature authorizes permit filing and final acceptance of work when complete.
The installer signs to accept scope, confirm license and insurance, state expected start and completion dates, and agree to coordinate inspections and warranty registration where applicable.
| Field | Configuration |
|---|---|
| Signature Authentication | Email link or SMS code |
| Required Attachments | Installer license and insurance certificate |
| Conditional Fields | Show permit fields if installer will file |
| Notifications | Email to owner, installer, and permit coordinator |
Choose a platform that supports secure e-signing, PDF and DOCX uploads, and audit trails for regulatory review.
Clear description of equipment, locations, and any electrical or structural modifications so installers and inspectors share expectations.
Statement identifying whether owner or installer will obtain permits, including timelines and permit fee handling.
Installer provides license number and certificate of insurance to confirm coverage for property damage and bodily injury.
Defined access windows, gate codes, and contact persons to minimize missed visits and associated charges.
Indemnity and limitation clauses that assign responsibility for damage, code compliance, and third-party claims.
Signed by all responsible parties, dated, and accompanied by signature verification method for future audits.
Form must be signed before any site work or permit submission
Allow 2–6 weeks for municipal permit approval depending on locality
Confirm earliest and latest start dates to reserve crew and equipment
Plan inspection within 10 business days after installation completion
Retain signed form as long as warranty and tax records require
Owner or manager requests installer proposal and authorization template
All parties sign form and return before permits or purchase orders issued
Installer files permits and performs installation within specified window
Authority inspects, owner accepts, and documents are archived
| signNow | DocuSign | Adobe Sign | PandaDoc | HelloSign | |
|---|---|---|---|---|---|
| Starting Price | $8/user/mo | $15/user/mo | $14/user/mo | $19/user/mo | $15/user/mo |
| Free Trial | Yes, 7-day trial | No | No | Yes, limited | Yes, limited |
| Bulk Send | Yes (Premium) | Yes | Yes | Yes | No |
| Audit Trail | Yes | Yes | Yes | Yes | Yes |
| HIPAA Compliant | Yes | Yes | Yes | No | No |
A homeowner signs to replace an old heat pump with an HVAC contractor
A property manager authorizes unit-by-unit retrofits across a complex