Contact and property
Primary homeowner and contractor contact details plus property address, delivery access notes, and preferred contact times for scheduling and delivery coordination.
A properly completed options form reduces ambiguity, aligns expectations about finishes and upgrades, and documents allowances and lead times. It streamlines ordering, minimizes rework from incorrect product selections, and provides a clear basis for change orders and final billing.
All parties retain a copy of the signed options form as part of the project record for inspection, change orders, and final invoicing.
Primary homeowner and contractor contact details plus property address, delivery access notes, and preferred contact times for scheduling and delivery coordination.
Concise description of the work to be performed, which openings are affected, site prep requirements, and whether structural modifications or permits are expected.
Door and window model numbers, sizes, glazing options, hardware finishes, and energy-performance ratings to ensure exact ordering from suppliers.
Color, stain, trim options, interior/exterior finishes, and optional upgrades with clear allowance amounts and unit pricing where applicable.
Line-item cost for selected products, installer labor allowances, deposits, and how overages or upgrades will be billed as change orders.
Estimated lead times, installation windows, cancellation/reschedule terms, and warranty coverage or manufacturer warranty transfer details.
| Field | Configuration |
|---|---|
| Signature Authentication | Email verification | optional SMS code |
| Conditional Fields | Show upgrades only when selected |
| Price Calculation | Allowance + unit price formulas |
| Notifications | Owner + contractor CC on completion |
Confirm the e-signature provider supports audit trails, conditional fields, and your core integrations to maintain accurate project data flows.
Sign selections at least the supplier lead time before desired install date.
Project deposits typically required at order placement to secure production slots.
Specify how late upgrades or changes are accepted before production begins.
Document allowable reschedule notice and any associated fees.
Warranty usually begins on installation completion or final payment date.
Contractor and homeowner sign options form; this locks product choices and allowances.
Supplier receives exact SKUs and deposit; production slot is reserved.
Materials arrive on site or to staging area per agreed delivery instructions.
Final inspection, punchlist resolution, and warranty documentation provided to homeowner.
| signNow | DocuSign | Adobe Sign | PandaDoc | HelloSign | |
|---|---|---|---|---|---|
| Starting Price | $8/user/mo | $15/user/mo | $14/user/mo | $19/user/mo | $15/user/mo |
| Free Trial | Yes, 7-day trial | No | No | Yes, limited | Yes, limited |
| Bulk Send | Yes | Yes | Yes | Yes | No |
| Audit Trail | Yes | Yes | Yes | Yes | Yes |
| HIPAA Compliant | Yes | Yes | Yes | No | No |
| Envelope Cap | No envelope cap | 100 envelopes/user/year | Varies by plan | Varies by plan | Varies by plan |
Property managers standardize options for multi-unit work to eliminate ordering errors.
Operations teams use template fields to ensure vendor consistency across projects.
The homeowner named on the property deed or lease is the primary authorized signer for selections that affect the unit. If the property is jointly owned or managed, include all authorized signers and retain proof of delegation if a property manager signs on the owner's behalf.
An officer or authorized representative of the contracting company may sign to confirm scope, allowances, and scheduling. The signer should be listed with title and contact details and authorized under the company's delegations of authority.