Scope of Work
Detailed description of demolition, framing, plumbing, electrical, tile, cabinetry, and finishes with measurable acceptance criteria to avoid ambiguity and disputes.
A written agreement sets expectations on cost, timing, materials, and quality while creating an enforceable record for payment, permit inspections, and warranty claims. It clarifies who is responsible for permits, subcontractors, cleanup, and change orders, which reduces disputes and supports insurance or contractor licensing reviews.
The document is typically prepared by contractors or remodelers and reviewed by homeowners, property managers, or design professionals prior to work starting.
Different versions exist for owner-contracted work, contractor-provided full-service remodels, and design-build arrangements; choose the variant that matches the procurement method.
The contractor signs to accept the scope, perform work, carry liabilities and insurance, and manage subcontractors; the signature binds the company and authorizes procurement and inspections.
The homeowner or authorized owner representative signs to accept quoted costs, payment schedule, access terms, and to provide consent for permits and site access during construction.
Detailed description of demolition, framing, plumbing, electrical, tile, cabinetry, and finishes with measurable acceptance criteria to avoid ambiguity and disputes.
List brand names, model numbers, finishes, and tolerances for fixtures and finishes; specify substitutions and approval process for any change.
Start date, milestone dates (rough-in, trim, final inspection), and completion deadline with defined remedy or liquidated damages for missed dates if applicable.
Itemized costs, deposit amount, progress payments linked to milestones, retainage, and payment methods including consequences for late payment.
Specify who secures permits, inspection responsibilities, and how permit costs are allocated or reimbursed between parties.
Define contractor warranties on labor and materials, warranty period, warranty claim process, and insurance/indemnity limits.
| Field | Configuration |
|---|---|
| Signer Order | Sequential or parallel signer routing depending on approvals. |
| Authentication | Email link, SMS code, or stronger ID verification for high-value projects. |
| Attachments | Include permit PDFs, product specs, and insurance certificates. |
| Audit Trail | Enable timestamps, IP, and action logs for every signer. |
Ensure the chosen platform supports required file types, audit trails, and integration points before distributing the agreement.
| signNow | DocuSign | Adobe Sign | PandaDoc | HelloSign | |
|---|---|---|---|---|---|
| Starting Price | $8/user/mo | $15/user/mo | $14/user/mo | $19/user/mo | $15/user/mo |
| Free Trial | 7-day free trial | Yes | Yes | Yes | Yes |
| Bulk Send | Yes | Yes | Yes | Yes | No |
| Audit Trail | Yes | Yes | Yes | Yes | Yes |
| HIPAA Compliant | Yes | Yes | Yes | No | No |
Submit before work begins to avoid stop-work orders
Pay deposit per contract to secure scheduling
Contractor response time typically 3–7 business days
Schedule promptly after completion for certificate of occupancy
Warranty usually begins on final acceptance date
Agreement signed and deposit paid to commence procurement
Permits obtained and posted prior to demolition
Plumbing and electrical rough-ins inspected and approved
Punchlist completed and final payment authorized
A homeowner issued a fixed-price agreement with detailed tile and fixture specs to avoid finish disputes.
A design-build firm used the form with exhibit attachments for drawings and FF&E lists to align expectations.