Exterior
Document roof, siding, gutters, foundation, porches, and exterior paint. Note drainage issues and observable structural concerns with locations and photos.
A uniform checklist standardizes observations, reduces disputes about condition, and creates an auditable record for compliance, repairs, and claim support.
Common users include professionals and stakeholders who need verified condition records.
The checklist provides shared factual data for repairs, tenant disputes, insurance claims, and regulatory reviews.
Document roof, siding, gutters, foundation, porches, and exterior paint. Note drainage issues and observable structural concerns with locations and photos.
Record wall, ceiling, floor, window, and door conditions for each room. Highlight water stains, mold evidence, pest signs, and any accessibility issues.
Verify smoke and CO detectors, fire extinguishers, and emergency exits. Record battery status, manufacture dates, and any missing or nonfunctional units.
Inspect faucets, toilets, drains, hot water systems, and HVAC operation. Note leaks, low water pressure, and service tags with recommended repairs.
Confirm electrical outlets, breakers, lighting, and included appliances. Flag exposed wiring, nonworking units, and potential hazards requiring licensed trades.
Provide overall condition rating, prioritized repair list, estimated completion dates, inspector notes, signatures, and attached photographic evidence.
| Field | Configuration |
|---|---|
| Template | Prepopulate sections and standard deficiency codes for consistency |
| Routing Order | Inspector → Property Manager → Owner → Contractor |
| Authentication | Email or SMS code for basic identity verification |
| Save Format | PDF/A with embedded photos and audit trail |
Choose a platform that supports PDF, DOCX import/export, image attachments, and a verifiable audit trail.
Verify the e-signing provider supports ESIGN and UETA compliance, preserves an unalterable audit trail, and stores the completed record in an accessible format for the required retention period.
Conduct before occupancy or lease start date
Provide signed report to tenant/owner within 3–7 days
Minor repairs within 14–30 days unless urgent
Schedule reinspection 7–30 days after repairs
Allow 10–30 days for owner/tenant responses or appeals
A small property manager adopted digital checklists for remote move-ins and sign-offs
Operational team standardized inspection templates across portfolios
| signNow | DocuSign | Adobe Sign | PandaDoc | HelloSign | |
|---|---|---|---|---|---|
| Starting Price | $8/user/mo | $15/user/mo | $14/user/mo | $19/user/mo | $15/user/mo |
| Free Trial | 7-day free trial | Varies | Varies | Varies | Varies |
| Bulk Send | Yes | Yes | Yes | Yes | No |
| Audit Trail | Yes | Yes | Yes | Yes | Yes |
| HIPAA Compliant | Yes | Yes | Yes | No | No |