Project Scope
Describe work to be done, start and completion dates, access requirements, and any site-specific constraints. Clear scope prevents change orders and clarifies contractor responsibilities for labor and materials.
A formal approval form reduces miscommunication, documents authorizations for permitting and insurance, clarifies financial responsibility, and creates an auditable record of decisions. Standardization accelerates procurement and reduces disputes by setting expectations on equipment, timelines, and warranty coverage.
Typical users include building owners, property managers, and contractors who need documented authorization before replacing HVAC equipment.
Signed forms are retained for permitting, insurance proofs, and future maintenance records; e-signatures are commonly acceptable when legal criteria are met.
Describe work to be done, start and completion dates, access requirements, and any site-specific constraints. Clear scope prevents change orders and clarifies contractor responsibilities for labor and materials.
List make, model, efficiency ratings (SEER, AFUE), capacity, and any factory options. Include serial numbers when available to match warranties and ensure compatibility with existing ducting or electrical systems.
Provide itemized estimate, payment schedule, deposit requirements, and approval limits. Specify allowed change order procedures and who authorizes additional expenditures beyond stated thresholds to prevent billing disputes.
Identify required local permits, code compliance responsibilities, contractor permit-holder, and timeline for inspections. Note who pays permit fees and who arranges inspection scheduling to avoid delays.
Record warranty periods, manufacturer and labor coverage, conditions that void warranty, and criteria for final acceptance testing, including temperature, airflow, and performance verification procedures.
Provide signature blocks for owner, manager, and contractor with printed names and dates. Note whether electronic signatures are accepted and the method of verification used.
| Workflow Field and Configuration Options | Configuration |
|---|---|
| Signing Order and Approver Routing | Set sequential or parallel approvers with conditional branches |
| Authentication Method and Verification Level | Email, SMS code, or KBA as needed |
| Required Fields and Conditional Logic | Make critical fields required and show conditionally |
| Storage Location and Integration Settings | Choose cloud folder and enable API sync |
Select an eSignature platform that supports secure signatures, audit trails, and the authentication level required for your organization.
| signNow | DocuSign | Adobe Sign | PandaDoc | HelloSign | |
|---|---|---|---|---|---|
| Starting Price | $8/user/mo | $15/user/mo | $14/user/mo | $19/user/mo | $15/user/mo |
| Free Trial | 7-day free trial | Varies by plan | Varies by plan | Varies by plan | Varies by plan |
| Bulk Send | Available (Business Premium) | Available | Available | Available | Varies by plan |
| Audit Trail | Yes | Yes | Yes | Yes | Yes |
| HIPAA Compliant | Yes (BAA available) | Yes (BAA available) | Yes (BAA available) | No | No |
Local review commonly 1–6 weeks depending on jurisdiction.
Allow 1–4 weeks after approval for scheduling.
Inspector may schedule within 1–2 weeks; corrections add time.
Warranty often starts on final acceptance date.
Maintain records accessible for inspectors and insurers.