Site Identification
Full legal site name, facility ID, and physical address including suite numbers; helps match checklist to project file and billing records.
A standardized checklist reduces installation errors, avoids unexpected site visits, and documents preconditions that affect timing, cost, and safety. It provides a clear record showing who validated site readiness and when, which supports dispute resolution and contractual compliance.
Final sign-off may require a qualified installer or an authorized company representative; roles and signature authority should be defined in the document.
| Field | Configuration |
|---|---|
| Required Fields | Make site name, address, permits, power specs, and installer signature mandatory |
| Attachments | Require permit PDFs and site photos before routing |
| Signer Order | Site reviewer then installer then owner for final approval |
| Authentication | Use email + SMS code or higher for owner signature |
Full legal site name, facility ID, and physical address including suite numbers; helps match checklist to project file and billing records.
Specify authorized access windows, gate codes, safety inductions, and on-site escort requirements so crews arrive prepared and reduce idle time.
Document available power circuits, voltages, network ports, and any temporary service needs; mismatches often cause significant schedule slips.
List required permits, inspection windows, and permit-holder contact; attach permit copies to avoid work stoppages for noncompliance.
Itemize equipment models, serial numbers, and deliveries expected on install day so installers confirm readiness and staging areas.
Include PPE requirements, confined space notes, fall protection needs, and emergency contacts to meet OSHA and site-specific safety obligations.
Scanned municipal or agency permits verifying lawful authorization for the planned work and inspection contacts.
Recent photos showing mounting locations, cable runs, and any obstructions that affect installation planning.
Manufacturer datasheets or cut sheets with dimensions, weight, and power requirements for staging and safety planning.
Written confirmation from property owner or facility manager granting access and specifying any key or badge procedures.
Proper configuration reduces signer friction, enforces required information, and creates an audit trail that demonstrates who approved site readiness.
| Criteria | Pre-Install Checklist | Work Order |
|---|---|---|
| Primary Purpose | site readiness | task execution |
| Typical Signers | owner, installer | supervisor, technician |
| Attachments | permits, photos | job ticket, time logs |
| Use Timing | before install | during or after install |
| signNow | DocuSign | Adobe Sign | PandaDoc | HelloSign | |
|---|---|---|---|---|---|
| Starting Price | $8/user/mo | $15/user/mo | $14/user/mo | $19/user/mo | $15/user/mo |
| Free Trial | Yes, 7-day free trial | Varies by plan | Varies by plan | Varies by plan | Varies by plan |
| Bulk Send | Yes (Business Premium) | Varies by plan | Varies by plan | Yes | Varies by plan |
| Audit Trail | Yes | Yes | Yes | Yes | Yes |
| HIPAA Compliant | Yes | Yes | Yes | No | No |
A small-property manager standardized pre-install checks to avoid site rework.
A regional installer used digital checklists for off-site approvals.
The project manager verifies all checklist items, confirms permits, coordinates vendors, and signs to accept site readiness on behalf of the contractor.
The facility or property owner confirms access, acknowledges any site limitations, and signs to authorize the installer to proceed.