Project Identification
Unique project name, contract number, and client reference so records and POs align across systems and invoices.
A well-designed Installation Project Questionnaire reduces ambiguity at kickoff by gathering consistent, actionable information up front. That clarity lowers scope creep, reduces return visits, improves safety planning, and enables accurate estimates and permit readiness.
Project stakeholders often include both internal teams and external contacts who hold specific information needed to scope and schedule the job.
Assign roles for completion and designate a reviewer to validate technical answers before approvals or purchase orders are issued.
| Field | Configuration |
|---|---|
| Required Fields | Mark POC, Site Address, Start Date as required to prevent incomplete submissions |
| Conditional Logic | Show permitting fields only if the project exceeds thresholds for electrical or structural changes |
| Routing | Auto-route to estimator, then PM, then client for signatures |
| Audit Trail | Capture time, user, and IP for each step to maintain a compliance record |
Electronic distribution should match your security and integration requirements to ensure smooth execution.
Allow 2–8 weeks depending on local authority; confirm with municipal office
Order equipment as soon as questionnaire is approved; lead times vary by vendor
Confirm 7–14 days before mobilization to finalize crews and logistics
Schedule inspections at least 48–72 hours ahead in jurisdictions requiring municipal sign-off
Establish a cutoff (commonly 5 business days before start) for scope changes to avoid rescheduling fees
Client or internal requester provides the completed form for review.
Estimator confirms measurements, electrical loads, and structural needs.
Permitting filed and long-lead items ordered based on validated scope.
Crews deployed, installation completed, and final inspection scheduled.
Unique project name, contract number, and client reference so records and POs align across systems and invoices.
Full address, entry points, clearance dimensions, parking/loading, security procedures, and contact windows for arrivals.
Equipment specifications, power ratings, required structural supports, tolerances, and manufacturer installation constraints.
OSHA considerations, required permits, inspection requirements, and any site-specific safety rules to be observed.
Preferred start date, blackout periods, staging areas, crane access, and material delivery windows to coordinate.
Designated approvers, billing contact, and signature blocks for acceptance of scope, fees, and scheduling commitments.
A building owner completed the questionnaire with exact rooftop clearances and lift access info
A retail chain provided power panel locations and scheduled blackout windows in the questionnaire
The Project Manager is typically authorized to approve technical scope, confirm scheduling, and sign off on installation readiness. Their approval signals procurement to order materials and mobilize field teams.
A named client representative or facility manager must confirm site access, accept scheduled dates, and sign acceptance of scope changes; their signature authorizes work and invoicing under the contract.
| signNow | DocuSign | Adobe Sign | PandaDoc | HelloSign | |
|---|---|---|---|---|---|
| Starting Price | $8/user/mo | $15/user/mo | $14/user/mo | $19/user/mo | $15/user/mo |
| Free Trial | Yes, 7-day trial | Varies | Varies | Varies | Varies |
| Bulk Send | Yes | Yes | Yes | Yes | No |
| Audit Trail | Yes | Yes | Yes | Yes | Yes |
| Envelope Cap | No cap | 100 envelopes/user/year | Varies | Varies | Varies |