Scope of Work
Detail the exact services: removal of old countertops, sink cutouts, edge profiles, seam count, caulking, and cleanup; attach drawings or plans as exhibits.
A clear written agreement reduces disputes, establishes timelines and payment milestones, protects both parties on site changes and warranty coverage, and documents acceptance standards for finish and fit. It serves as the primary record for claims, permits, and insurance.
This agreement is used whenever a kitchen countertop is measured, fabricated, or installed by a third party.
Use this agreement when you need clear responsibilities, a payment schedule, and documented acceptance criteria before fabrication and installation begin.
The owner or authorized occupant who approves materials, measurements, payment terms, and final acceptance; responsible for site access, verifying dimensions, and timely payments under the contract.
The licensed or registered trade contractor who provides materials, measures and templates, performs fabrication and installation, issues warranties, and documents change orders and completion for invoicing and potential lien rights.
Detail the exact services: removal of old countertops, sink cutouts, edge profiles, seam count, caulking, and cleanup; attach drawings or plans as exhibits.
Specify stone type, color, finish, thickness, seam placement, sink and faucet cutouts, and any supplier guarantees or third-party manufacturer warranties.
State who performs on-site measuring and templating, acceptable tolerances, and responsibility for measurement errors or additional charges.
Define deposit amount, progress payments, final payment upon acceptance, late fees, and whether payment releases or lien waivers are required.
Include lead times for fabrication, estimated installation window, contingency for delays, and notice procedures for rescheduling.
Describe workmanship and material warranties, inspection and acceptance criteria, remedy windows, and post-installation care instructions.
| Field | Configuration |
|---|---|
| Template Upload | Use PDF or DOCX with fixed form fields |
| Signer Authentication | Email plus SMS code or ID verification if high risk |
| Conditional Fields | Show change order fields only when needed |
| Document Retention | Enable audit trail and version history |
Choose platform settings that provide a compliant audit trail, appropriate signer authentication, and secure storage for contract and templates.
Confirm the eSignature provider supports the required compliance frameworks (ESIGN/UETA) and retention features necessary for enforcement and audits.
Schedule within 3–14 days after contract signing, depending on availability.
Allow 7–30 business days for fabrication depending on material and shop backlog.
Book a multi-day window and confirm 48–72 hours before install.
Perform acceptance walkthrough within 24–48 hours after installation.
Warranty typically begins on installation acceptance date.
Deposit collected and measurement scheduled.
Measurements and sink/faucet locations confirmed.
Counters finished and quality-checked at the shop.
Installed, inspected, and final payment processed.
| signNow | DocuSign | Adobe Sign | PandaDoc | HelloSign | |
|---|---|---|---|---|---|
| Starting Price | $8/user/mo | $15/user/mo | $14/user/mo | $19/user/mo | $15/user/mo |
| Free Trial | 7-day free trial | Trial available | Trial available | Trial available | Trial available |
| Bulk Send | Yes | Yes | Yes | Yes | No |
| Audit Trail | Yes | Yes | Yes | Yes | Yes |
| HIPAA Compliant | Yes | Yes | Yes | No | No |
| Envelope Cap | No cap | 100 envelopes/user/year | Varies by plan | Varies by plan | Varies by plan |
A small property manager standardized renovation contracts and transitioned to online signing to reduce turnaround time.
A contracting firm adopted digital signing to eliminate paper backlogs and inconsistent clauses.