Owner Certification
A signed declaration from the property owner or authorized agent confirming the accuracy of submitted information and consenting to the proposed division and recording conditions.
A correct application speeds municipal review, reduces the risk of rejection, and establishes a clear record for future title work and permitting. Electronically signed submissions that meet ESIGN (15 U.S.C. §7001) and UETA standards are generally enforceable, though local notary or witness rules may still apply.
Local governments, surveyors, property owners, and development firms routinely file Land Divisions Application Forms for lot splits, consolidations, and minor subdivisions.
The application often triggers ancillary steps—public notice, easements review, utility coordination, and final recording—so coordinate early with local planning staff.
The individual or entity that holds title must sign or provide written authorization. For corporations or LLCs, an officer or manager with signing authority should sign and include a resolution or agency letter when required.
A licensed surveyor, attorney, or agent may sign with a notarized owner authorization or power of attorney; include documentation to show this authority to avoid processing delays.
| Field | Configuration |
|---|---|
| Owner Signature | Required | Signer must authenticate |
| Survey Upload | PDF required | 300 DPI recommended |
| Notary Block | Optional | Attach notarization image |
| Routing | Staff reviewer then planner approval |
Ensure the platform you use accepts the file formats and signer authentication types required by the jurisdiction.
A signed declaration from the property owner or authorized agent confirming the accuracy of submitted information and consenting to the proposed division and recording conditions.
A precise metes-and-bounds description or recorded lot/block citation that matches county records and the survey; inaccuracies lead to rejection or recording errors.
A scaled, dimensioned map prepared by a licensed surveyor showing bearings, distances, lot lines, easements, adjoining roads, and utility connections required for technical review.
A table listing each proposed parcel with area, frontage, setbacks, and zoning designation to allow quick verification against minimum lot standards and zoning requirements.
A clear list and map callouts for existing easements, rights-of-way, and recorded restrictions that affect developable area and access for each resulting parcel.
Completed local checklists, application fee receipt, and proof of required notices or consent from utilities and relevant departments to avoid administrative holds.
Tim Martin streamlined lot splits for an infill project using online filing and digital signatures to avoid multiple in-person visits.
Optica Ventures coordinated a three-lot subdivision across county lines and centralized exhibits to a single submission package.
Initial completeness check typically within 10–30 days
Technical review often 30–90 days depending on complexity
If required, hearing scheduled per local calendar and notice periods
Approval or conditional approval issued following review or hearing
Record approved plat or deed at county recorder after conditions satisfied
Initial consultation with planning staff to identify requirements and needed exhibits
Complete application, attachments, and payment filed with the planning office
Engineering, zoning, and utility checks identify corrective items or conditions
Final approval granted and plat/deed recorded with the county recorder
| Criteria | Subdivision Plat | Lot Split |
|---|---|---|
| Notarization | often required | often required |
| Public Hearing | usually required | sometimes required |
| Survey Required | full plat survey | boundary survey |
| Recording Required |
| signNow | DocuSign | Adobe Sign | PandaDoc | HelloSign | |
|---|---|---|---|---|---|
| Starting Price | $8/user/mo | $15/user/mo | $14/user/mo | $19/user/mo | $15/user/mo |
| Free Trial | 7-day free trial | No | No | Yes, limited | Yes, limited |
| Bulk Send | Yes | Yes | Yes | Yes | No |
| Audit Trail | Yes | Yes | Yes | Yes | Yes |
| Envelope Cap | No cap | 100 envelopes/user/year | Varies | Varies | Varies |