Site Plan
Scaled drawing showing property lines, existing features, proposed planting locations, irrigation lines, hardscape elements, and elevations where required to assess grading impacts.
Completing a clear Landscape Design Application reduces review delays, limits scope misunderstandings, and documents regulatory and contractual obligations for all parties. Accurate applications improve approval odds and make later revisions easier to track.
Landscape architects, licensed contractors, property owners, and municipal planning staff commonly prepare or review the application.
Each reviewer has different priorities—design accuracy, regulatory compliance, budget control—and the application should address those needs clearly.
Scaled drawing showing property lines, existing features, proposed planting locations, irrigation lines, hardscape elements, and elevations where required to assess grading impacts.
Detailed species list with botanical names, quantities, sizes at planting, mature sizes, and irrigation needs for review of water and maintenance impacts.
Describe paving, mulch, edging, lighting, and other materials with manufacturer or specification references and finish or color samples where applicable.
Show proposed grading changes and drainage provisions including swales, retention, or stormwater controls to demonstrate code compliance.
Provide anticipated start and completion dates, milestones, and any seasonal constraints that affect planting or inspections.
Itemized budget or estimate with units and quantities to support funding, bonding, or client approvals and to reduce later disputes.
| Field | Configuration |
|---|---|
| Signer Order | Owner first | Contractor second | Municipal reviewer last |
| Authentication | Email link with optional SMS code for added signer verification |
| Conditional Fields | Show irrigation details only if irrigation selected in scope |
| Reminders | Auto-reminders at configurable intervals for unsigned parties |
Confirm the platform supports PDF, DOCX, and large-image attachments before uploading application materials.
Use an eSignature platform with audit trails and configurable authentication to meet municipal and contractual evidence needs.
1–5 business days for administrative check
2–6 weeks depending on complexity and staff workload
2–4 weeks per revision round on average
Dependent on inspector availability; typically 1–3 weeks
Can follow inspection same day or within 7 days
Municipality confirms receipt and assigns tracking number for the application.
Technical staff review site plans, grading, and planting specifications for code compliance.
Reviewer lists required changes; applicant must revise and resubmit plans.
Approved permit or conditional approval is granted allowing work to begin.
The interface is simple for internal teams and customers.
All documents processed online with full compliance.