Site Information
Includes project name, address, parcel ID, survey references, and contact details to tie the checklist to specific permits and inspections.
A consistent Landscape Preparation Checklist reduces mistakes, supports compliance with local permits and utility requirements, and documents readiness for planting or construction.
Several parties may prepare or review the checklist depending on project scope and contract terms.
Use role assignments on the checklist to avoid responsibility gaps and to streamline approvals and inspections.
| Field | Configuration |
|---|---|
| Signer Roles | Define crew, manager, inspector order. |
| Authentication | Email link or SMS code for signer verification. |
| Conditional Fields | Show permit fields only when required. |
| Retention | Set automatic archival after project closure. |
Choose a platform that supports PDF, DOCX imports, mobile completion, and audit trails for records.
Includes project name, address, parcel ID, survey references, and contact details to tie the checklist to specific permits and inspections.
Lists required municipal permits, permit numbers, issuing agency, and expiration dates so work proceeds within authorized scope.
Confirms underground utilities located and marked, with date and locator company reference to avoid excavation damage and safety incidents.
Documents silt fencing, inlet protection, and other BMPs installed to meet stormwater requirements and to prevent regulatory violations.
Records materials delivered, storage locations, soil amendments, and machinery on site to support quality checks and invoice reconciliation.
Provides signature blocks for crew lead, project manager, and inspector with dates to create an auditable completion trail.
Submit checklist and supporting docs before scheduled work start.
Obtain locates at least 48–72 hours prior to excavation.
Install before any grading or significant disturbance.
Schedule after all prep tasks and signoffs are complete.
Tie payments to checklist signoff and inspector acceptance.