Plant Materials
List botanical and common names, minimum sizes, grades, rootball types, and acceptable substitutions with source provenance when required.
A formal Landscape Specification Document sets uniform expectations for quality, materials, and acceptance criteria among bidders and contractors.
This document is completed and used by multiple roles involved in project delivery and long-term care.
Maintain one authoritative specification per project and circulate it with drawings, bid forms, and contract exhibits.
List botanical and common names, minimum sizes, grades, rootball types, and acceptable substitutions with source provenance when required.
Specify soil mix ratios, compaction tolerances, pH ranges, and testing requirements including sampling frequency and laboratory standards.
Define system type, controller programming, water budgets, scheduling, and testing procedures, plus requirements for backflow prevention.
Describe materials, installation tolerances, base preparations, jointing, and load-bearing or ADA compliance criteria where applicable.
Set installation sequencing, staking procedures, staking removal timelines, grade tolerances, and protection measures for existing vegetation.
Include maintenance periods, acceptance inspections, performance guarantees, replacement thresholds, and final closeout documentation requirements.
| Field | Configuration |
|---|---|
| Template Library | Store standard spec sections for reuse across projects to maintain consistency. |
| Version Control | Enable automatic version numbering and changelog for auditability. |
| Approval Routing | Define reviewer roles and sequential approval order for electronic sign-off. |
| Attachment Rules | Require drawings, test reports, and manufacturer cut sheets with each issued revision. |
Choose a platform that supports secure attachments, versioned templates, and an auditable signature trail.
Ensure the chosen system can export signed documents with a certificate of completion, supports integration with project systems, and meets any regulatory requirements for record retention.
Date and time for sealed or electronic bid receipt; late bids may be rejected.
Depends on authority — plan review windows vary by jurisdiction and complexity.
Seasonal planting windows often control schedule and survival expectations.
Typically 1–2 years; warranty obligations begin on the accepted completion date.
Final inspection date tied to contract closeout and release of retainage.
Document published and attached to bid documents for procurement.
Bids are reviewed and a contractor is selected based on compliance and price.
Contractor finishes work and requests acceptance inspection.
Acceptance triggers the maintenance/warranty timeline and performance monitoring.
| signNow | DocuSign | Adobe Sign | PandaDoc | HelloSign | |
|---|---|---|---|---|---|
| Starting Price | $8/user/mo | $15/user/mo | $14/user/mo | $19/user/mo | $15/user/mo |
| Free Trial | 7-day free trial | Varies by vendor | Varies by vendor | Varies by vendor | Varies by vendor |
| Bulk Send | Yes | Yes | Yes | Yes | Yes |
| Audit Trail | Yes | Yes | Yes | Yes | Yes |
| HIPAA Compliant | Yes | Yes | Yes | No | No |
| Envelope Cap | No envelope cap | 100 envelopes/user/year | Varies by plan | Varies by plan | Varies by plan |