Scope of Work
Describe removal, supply, and installation tasks, materials, mounting types, illumination, and final finish. Include drawings or exhibit references for exact dimensions and locations.
A clear written agreement reduces project disputes, ensures permit and code compliance, protects property owners and contractors through insurance and indemnity terms, and documents payment and warranty obligations to support enforcement or insurance claims if issues arise.
This agreement is used by multiple parties involved in signage projects, from owners to municipal reviewers.
Each party should confirm authority to sign, verify insurance and licensing, and ensure municipal permit responsibility is clearly assigned.
A retail landlord typically requires contractor proof of insurance, evidence of permits, and a warranty for workmanship. The landlord assigns project access windows, approves final location and illumination settings, and withholds final payment until acceptance criteria are met to protect lessee and tenant interests.
A licensed sign contractor expects a clear scope of work, site access schedules, agreed payment milestones, and indemnity limits. Contractors should obtain written confirmation of permit responsibility, clarify concealed-condition handling, and require prompt approvals for change orders to avoid schedule and cost disputes.
Describe removal, supply, and installation tasks, materials, mounting types, illumination, and final finish. Include drawings or exhibit references for exact dimensions and locations.
Specify which party secures municipal permits, zoning approvals, and electrical inspections; include timelines and responsibility for fees and rework required by authorities.
State total price, deposit, milestone payments, retainage, invoicing procedures, and remedies for late payment including interest or lien rights where applicable.
Require contractor insurance coverage limits, name the owner as an additional insured when required, and specify indemnity scope for property damage and third-party claims.
Define warranty duration, cure procedures, acceptance testing, and steps for remedying defects discovered during warranty period.
Detail responsibilities for restoring mounting surfaces, electrical concealment, landscape repair, and disposal of removed materials to leave the site in agreed condition.
| Field | Configuration |
|---|---|
| Authentication Method | Email link with optional SMS code |
| Signature Order | Sequential by role or parallel as needed |
| Document Attachments | Attach permit scans and insurance certs |
| Retention Location | Designate secure cloud folder or system |
Ensure the chosen e-sign platform supports required file formats, authentication, and audit trail capture.
Verify platform encryption and compliance for sensitive documents; retain signed records with linked permits and certificates for the full retention period.
| Criteria | Paper | Electronic |
|---|---|---|
| Legal Validity | yes – wet signature accepted | yes – esign/ueta enforceable |
| Notarization | possible local requirement | possible ron or in-person |
| Audit Trail | limited | detailed timestamps and ip |
| Distribution | manual copies | instant copies to parties |
| signNow | DocuSign | Adobe Sign | PandaDoc | HelloSign | |
|---|---|---|---|---|---|
| Starting Price | $8/user/mo | $15/user/mo | $14/user/mo | $19/user/mo | $15/user/mo |
| Free Trial | 7-day free trial | Varies by vendor | Varies by vendor | Varies by vendor | Varies by vendor |
| Bulk Send | Yes | Yes | Yes | Yes | No |
| Audit Trail | Yes | Yes | Yes | Yes | Yes |
| HIPAA Compliant | Yes | Yes | Yes | No | No |
Submit permit applications and approvals before mobilization.
Begin site work after deposit and insurance verification.
Perform removal and replacement within agreed schedule.
Complete punchlist and obtain signed acceptance.
Varies by municipality; typically days to several weeks
Usually within 7–21 days after contract execution
Depends on complexity; single-sign jobs often complete in 1–3 days
Follow contract schedule; common term is net 30 days
Commonly 12 months from final acceptance
Save final executed agreements as PDF/A and keep editable DOCX copies for internal records and future amendments.
Attach permit approvals, electrical inspection reports, and contractor insurance certificates to the signed file for compliance and claims purposes.
Use a naming convention with date and version number to avoid confusion between draft and executed copies.
Store documents in encrypted cloud storage with restricted access and an audit trail for downloads and edits.
A mall owner required modern illuminated signage
A building in a landmark district faced design review