Lifting Instruction Template

This template is fully customizable. Edit the text, fill out the fields, and send it for signature. Give it a try!

LIFTING INSTRUCTION TEMPLATE

This Lifting Instruction Template is entered into by and between Client Name: and Contractor Name: . The parties agree that the following instructions, precautions, and contractual provisions govern the planning and execution of the described lift operations.

WHEREAS

WHEREAS, Client requires lifting services and related coordination at the Location specified herein in order to safely move, install, or relocate equipment or materials; and

WHEREAS, Contractor is duly qualified and possesses the personnel, equipment, and technical competence to plan, supervise, and execute lifting operations in accordance with industry standards and applicable law; and

WHEREAS, the parties desire to set forth the scope, safety controls, responsibilities, payment terms, and legal provisions governing the lift in this written instruction and agreement.

LIFT IDENTIFICATION

SCOPE OF WORK

Contractor shall perform the following work in accordance with the lifting plan and these instructions. Contractor shall be solely responsible for the safe execution of the lift, coordination of personnel, and ensuring compliance with the terms set forth below.

LOAD & RIGGING DETAILS

EQUIPMENT & CHECKLIST

Equipment to be used and pre-lift checks. Contractor certifies that all equipment is rated, inspected, and suitable for the intended lift.

Pre-lift inspection checklist (select items verified by Contractor):

Crane inspection current and recorded

Slings and fittings integrity verified

Shackles and connectors have rated capacity markings

Spreader beam(s) certified if used

Taglines provided where required

Ground and outrigger support verified

COMMUNICATIONS, SIGNS & EXCLUSION ZONES

Contractor shall establish clear communication protocols, horn/hand signals and a dedicated signaler. Exclusion zones shall be erected and controlled. Any person not essential to the lift shall remain outside the exclusion zone.

WEATHER & ENVIRONMENTAL LIMITS

Lifts shall be suspended if environmental conditions exceed safe operating limits. Contractor is responsible for monitoring conditions and halting operations when hazards arise.

EMERGENCY PROCEDURES

PAYMENT TERMS

Client will pay Contractor as follows. Payment is conditioned upon satisfactory completion of the work described in this document and submission of Contractor's invoice.

TERM AND TERMINATION

This instruction is effective as of the Start Date below and continues until completion of the described lift or the End Date, unless earlier terminated as provided herein.

CONFIDENTIALITY

Each party shall keep confidential all non-public information disclosed in connection with the lifting operation, including technical data, load specifications, and pricing. Confidential information shall not be disclosed except to employees or subcontractors with a need to know and only under obligations of confidentiality no less protective than set forth herein. Confidentiality obligations survive termination for a period of three years.

INSURANCE, INDEMNITY & LIABILITY

Contractor shall, at its expense, maintain insurance customary for lifting operations including commercial general liability, automobile liability, employer's liability, and, where applicable, crane and equipment hull insurance. Contractor shall indemnify and hold harmless Client from and against claims, damages, losses and expenses arising out of Contractor's negligent performance or breach of this instruction, except to the extent caused by Client's gross negligence or willful misconduct. Neither party limits liability for death or personal injury resulting from its negligence.

COMPLIANCE WITH LAWS AND STANDARDS

Contractor shall perform all work in compliance with applicable laws, regulations, and industry standards, including but not limited to applicable rigging, crane operation, and safety standards. Contractor shall obtain and maintain any permits or authorizations required for the work.

GOVERNING LAW

This instruction and any dispute arising hereunder shall be governed by and construed in accordance with the laws of the State of , without regard to conflict of laws principles.

ENTIRE AGREEMENT

This document constitutes the entire agreement and instruction between the parties with respect to the lifting operation described herein, and supersedes all prior negotiations, representations, and agreements concerning the subject matter. Any amendment must be in writing and signed by authorized representatives of both parties.

ACKNOWLEDGMENTS

By signing below, each party acknowledges receipt of this Lifting Instruction Template, certifies that the information provided is accurate to the best of its knowledge, and agrees to comply with the terms, safety requirements, and payment obligations contained herein.

Client Name:

By:

Date:

Contractor Name:

By:

Date:

Enter text✕

What a Lifting Instruction Template Is and when it’s used

A Lifting Instruction Template is a standardized safety document that captures the planning, engineering, and work-control details required for a planned lift. It records load characteristics, rigging and crane specifications, roles and responsibilities, pre-lift checks, and any limiting conditions so supervisors, riggers, and operators have a single source of truth before the lift begins.

Why a clear lifting instruction matters for safety and compliance

Consistent lifting instructions reduce human error, document engineering controls, and create an auditable record for safety officers and regulators. They help meet employer obligations under occupational safety rules, support incident investigations, and protect owners, contractors, and workers by demonstrating that hazard recognition and risk controls were applied.

Why a clear lifting instruction matters for safety and compliance

Who typically creates and relies on lifting instructions

Lifting instructions are prepared by parties who design or supervise lifts and are reviewed by those who execute them.

  • Site supervisors and lifting supervisors who coordinate the onsite plan and approve conditions for a safe lift.
  • Qualified rigging engineers or crane specialists who calculate loads, center of gravity, and equipment capacity.
  • Riggers, crane operators, and safety officers who verify field conditions, inspections, and permit requirements before lifting.

Keeping these roles aligned in the template reduces miscommunication and ensures each signer understands specific duties and tolerances.

Core sections to include in a professional lifting instruction

A complete template groups technical data, authorization, and verification steps so reviewers can find critical controls quickly and audit compliance after the lift.

Project & Location

Project name, site address, lift zone and access constraints — aids logistics and emergency response.

Lift Description

Precise load description, gross weight, center of gravity, and dimensions to ensure capacity calculations are accurate.

Equipment & Rigging

Crane ID, rated capacity, slings, shackles, angle factors, and certification status for each item used.

Calculations & Limits

Load chart references, lift radius, stability checks, and environmental limits such as wind or ground bearing.

Responsibilities

Named competent persons: lifting supervisor, signaler, operator, and riggers with signature blocks and timestamps.

Pre-lift Checks

Inspection checklist, permit numbers, checklist completion, emergency plan, and post-lift confirmation entries.

Essential data fields every lifting instruction must capture

Load Weight: Gross and net weight
Center of Gravity: Offset and orientation
Crane ID/Capacity: Manufacturer rated capacity
Rigging Details: Sling type, angle, and WLL
Signatures: Supervisor and operator names
Inspection Dates: Pre-lift and shift checks

Step-by-step sequence to complete and approve a lifting instruction

Follow a repeatable sequence to confirm engineering, site conditions, and authorization before requesting the lift.

  • 01
    Prepare: Gather drawings, weight data, and equipment specs.
  • 02
    Engineer Review: Verify calculations and stability margins.
  • 03
    Field Inspection: Confirm ground, access, and tag inspections.
  • 04
    Authorize: Supervisor signs when all conditions are satisfied.

Where to file and who should receive the completed form

Document routing ensures stakeholders and auditors have the final record and that site personnel can access the plan during the lift.

  • On-site Control: Retain a hard copy at the lift location with the supervisor.
  • Safety Office: Store a scanned copy in the project safety folder.
  • Client / Owner: Provide owner or client representative with the signed plan.
  • Corporate Records: Archive the master copy in the company document system for audits.

How to configure and customize the template for digital use

Set fields, permissions, and conditional logic so the template enforces required entries and routes approvals automatically.

Field Configuration
Required Fields Make load weight and signatures mandatory
Conditional Logic Show extra rigging fields if weight exceeds threshold
Signer Order Require engineer then supervisor approval
Access Control Limit edit rights to safety personnel

Digital signing and distribution requirements

Choose a platform that supports secure e-signatures, audit trails, and common file formats so the template remains verifiable and portable.

  • File Formats: PDF, Word DOCX supported
  • Integrations: Salesforce, NetSuite, Procore integrations available
  • Security: TLS in transit and AES-256 at rest

Verify that the chosen solution supports required authentication methods and long-term storage formats to preserve evidentiary integrity.

Timing and deadlines to observe for lift planning

Set and communicate time-based triggers so reviews, inspections, and permits occur before execution and records are retained afterward.

Pre-lift Submission:

Submit plan at least 24 hours prior to the scheduled lift

Inspection Window:

Complete rigging and equipment inspection before first lift of shift

Approval Cutoff:

Engineering and supervisor approvals complete before crane arrives

Revalidation After Change:

Reassess and re-sign when load or radius changes

Retention Start:

Record retention begins on the signature date

Key milestones from planning to post-lift closeout

Track these sequential milestones so the team can confirm readiness, execute safely, and document outcomes.

01

Plan Development

Engineer prepares calculations and risk controls.

02

Approval

Supervisor and competent persons sign the instruction.

03

Execution

Lift performed under approved conditions with spot checks.

04

Closeout

Post-lift inspection and archive the signed record.

Common mistakes when preparing lifting instructions

  • Using estimated weights without documented source material, causing unsafe capacity calculations and unexpected overload conditions.
  • Omitting rigging angle or sling reduction factors so the working load limit is overstated during execution.
  • Failing to revalidate after late changes to load geometry, which can invalidate the entire plan and increase risk.
  • Allowing unsigned or partially signed instructions to proceed, creating gaps in responsibility and auditability.

Consequences and risks of incomplete or incorrect instructions

Structural Failure: Collapse or dropped load risk
Injury or Death: Severe worker harm potential
Regulatory Action: OSHA citations and fines
Contractual Liability: Client claims and damages
Project Delays: Work stoppage and rework
Insurance Impact: Higher premiums or denied claims

Basic eSignature vendor comparison for signing lifting instructions

A concise comparison of typical vendor starter prices and key features relevant to signing and archiving safety-critical documents; confirm current terms with each vendor.

signNow DocuSign Adobe Sign PandaDoc HelloSign
Starting Price $8/user/mo $15/user/mo $14/user/mo $19/user/mo $15/user/mo
Free Trial 7-day free trial, no credit card required Vendor-specific — verify Vendor-specific — verify Vendor-specific — verify Vendor-specific — verify
Bulk Send Yes Yes Yes Yes No
Audit Trail Yes Yes Yes Yes Yes
HIPAA Compliant Yes Yes Yes No No

Frequently asked questions about using a Lifting Instruction Template

Answers to common questions about e-signing, approvals, and recordkeeping when using a lifting instruction for field operations.


Need help? Contact support

be ready to get more
Join over 28 million airSlate SignNow users