Scope of Work
Describe the precise work to be performed, methods and tools allowed, and any exclusions. Include diagrams or coordinates where possible to avoid ambiguity about what will be cut or moved.
A clear Line Cutting Agreement reduces safety and liability exposure, documents required permits and insurance, and establishes responsibility for restoration and testing. It creates an auditable record that helps resolve disputes and demonstrates compliance with local ordinances and permit conditions.
The agreement is completed by parties who will plan, authorize, or perform the cut.
Each signatory should have authority to bind their organization and access to required insurance and permit records.
The Site Superintendent signs on behalf of the contractor and confirms that crews follow the approved isolation and safety plan, have required insurance, and will restore the site per the agreement.
The Utility Representative signs to authorize the cut, provide required lockout/tagout or isolation steps, and confirm inspection and testing acceptance criteria before service restoration.
Describe the precise work to be performed, methods and tools allowed, and any exclusions. Include diagrams or coordinates where possible to avoid ambiguity about what will be cut or moved.
Identify the exact site, meter identifiers, GPS coordinates or drawing references. Attach site diagrams and mark adjacent utilities to reduce risk of accidental damage.
Set authorized dates and start/finish windows, including contingency windows for weather or permitting delay, and specify working hours and required notifications.
List required municipal or utility permits, who is responsible for obtaining them, permit numbers, and any inspection milestones tied to the permit.
Specify minimum insurance types and limits, name additional insureds, and include indemnity language allocating risk for property damage, bodily injury, and third-party claims.
Detail restoration standards, materials, testing requirements, test reports, acceptance criteria, and who pays for rework if initial work fails inspection.
| Field | Configuration |
|---|---|
| Signer Order | Sequential signing to ensure utility authorization precedes work |
| Authentication Method | Email link plus SMS code for signer verification |
| Attachments | Require site diagram and certificate of insurance upload |
| Archive Location | Store executed PDF in project folder for 7+ years |
Confirm platform supports required authentication and retention rules for your jurisdiction before relying on electronic execution.
Submit permits weeks before the planned cut per local authority requirements
Schedule notarization or RON session ahead of signatures if needed
Set an agreed date with contingency windows for weather or permit delay
Specify days post-cut to finish restoration and inspection
Retention period begins on effective date or completion, as specified
Prepare full agreement with drawings and insurance attachments
Obtain utility authorization and municipal permits
Execute cut, perform tests, and obtain inspector signoff
Finalize restoration, collect acceptance, and store executed records
Tim Martin streamlined remote approvals for site work with digital signing and attached COIs.
Dan Rotelli emphasized audit trails and SOC 2 conformity for contracts involving critical infrastructure.
| signNow | DocuSign | Adobe Sign | PandaDoc | HelloSign | |
|---|---|---|---|---|---|
| Starting Price | $8/user/mo | $15/user/mo | $14/user/mo | $19/user/mo | $15/user/mo |
| Free Trial | 7-day free trial | Varies | Varies | Varies | Varies |
| Bulk Send | Yes | Yes | Yes | Yes | No |
| Audit Trail | Yes | Yes | Yes | Yes | Yes |
| HIPAA Compliant | Yes | Yes | Yes | No | No |