Project ID
Unique project identifier, address, and project contact details to link the calculation to plans and permit submittals.
A complete Load Calculation Form reduces oversizing or undersizing of equipment, supports permit reviews and code compliance, clarifies assumptions for bidders, and documents decisions that affect energy use, occupant comfort, and safety.
The Load Calculation Form is completed by technical staff and reviewed by project stakeholders before equipment procurement or permit submission.
Different roles use the form to verify compliance, estimate costs, or confirm installation scope during design and construction.
Unique project identifier, address, and project contact details to link the calculation to plans and permit submittals.
Gross and conditioned square footage, occupancy type, construction year, insulation R-values, and window properties used to determine thermal loads.
Indoor setpoints and outdoor design temperatures or climatic data referenced by code or ASHRAE for the project location.
Detailed peak cooling and heating loads, internal gains, ventilation loads, solar gains, and diversity factors shown per zone or circuit.
Recommended equipment capacities, electrical service demand, breaker sizes, and equipment efficiency or manufacturer model references.
Documented assumptions, calculation method, standards used, and any deviations to ensure reproducibility and permit review transparency.
Use common file formats and services to ensure reviewers can open and verify calculations.
| signNow | DocuSign | Adobe Sign | PandaDoc | HelloSign | |
|---|---|---|---|---|---|
| Starting Price | $8/user/mo | $15/user/mo | $14/user/mo | $19/user/mo | $15/user/mo |
| Free Trial | 7-day free trial | Varies by vendor | Varies by vendor | Varies by vendor | Varies by vendor |
| Bulk Send | Yes (tiered) | Varies by plan | Varies by plan | Varies by plan | Varies by plan |
| Audit Trail | Yes | Yes | Yes | Yes | Yes |
| HIPAA Compliant | Yes (BAA available) | Varies | Varies | Varies | Varies |
| Envelope Cap | No cap | 100 envelopes/user/year | Varies by plan | Varies by plan | Varies by plan |
Submit with initial permit application; required before equipment installation.
Typical review 2–6 weeks, variable by jurisdiction and workload.
Respond to reviewer comments within requested timeframe to avoid delays.
Inspections are scheduled after installation and may require signed calculations on site.
Keep signed copies and calculation files for post-occupancy reference.