Scope
Describe systems under test, components included/excluded, user profiles, peak load expectations, and business transactions to be exercised; tie each scenario to performance objectives and acceptance criteria.
A clear Load Test Document reduces operational risk by establishing measurable acceptance criteria, enabling repeatable testing, and preserving an auditable record of performance results. It clarifies responsibilities and approvals, which supports procurement, compliance reviews, and informed capacity or remediation decisions.
Typical users include QA engineers, SREs, performance engineers, architects, and product or operations managers responsible for system performance.
Use this document to align stakeholders, document evidence for audits, and guide post-test remediation and capacity-planning decisions.
Describe systems under test, components included/excluded, user profiles, peak load expectations, and business transactions to be exercised; tie each scenario to performance objectives and acceptance criteria.
List hardware, network, cloud regions, middleware, database versions, and any test harness or monitoring tools; include provisioning scripts, configuration snapshots, and network topology for reproducibility.
Define user journeys, concurrent user counts, ramp-up and ramp-down profiles, steady-state durations, error injection plans, and data variation strategies; map each scenario to expected SLA thresholds with pass/fail rules.
Specify primary metrics (latency, throughput, error rate), collection intervals, monitoring dashboards, alert thresholds, and log retention; include sampled traces and resource baselines for cross-service correlation.
Provide step-by-step run instructions, checkpoints for validation, rollback procedures for failed runs, responsible owners, and data cleanup steps; include scheduling windows and estimated duration per scenario.
Record stakeholder approvals, date-stamped sign-offs, acceptance criteria met, exceptions, and links to raw result files; include audit trail entries and retained copies per retention policy.
| Field | Configuration |
|---|---|
| Platform | Tool name (JMeter, Gatling, Locust) and version |
| Auth | Email invite, SSO, or API key |
| Conditional Fields | Show sections based on role or scenario |
| Results Storage | Cloud bucket or internal artifact repository |
| Notifications | Email or webhook on completion |
The Load Test Document is compatible with common eSignature and collaboration platforms; requirements focus on format, APIs, and authentication strength.
Notify stakeholders at least 72 hours before planned runs.
Complete environment smoke tests 24 hours prior.
Final report within 3 business days after test completion.
Assign remediation owners within 5 business days.
Retain raw logs per retention policy and legal requirements.