Scope of Work
Define the exact parts, assembly steps, quantities, and delivery locations. Include reference drawings, bill of materials, measurable acceptance criteria, and any subcontracting permissions to avoid scope disputes during production.
A Metal Fabrication Agreement protects parties by defining deliverables, timelines, costs, and liability. It reduces ambiguity, supports payment enforcement, preserves warranty and IP rights, and provides a record suitable for electronic execution under ESIGN and state UETA statutes when parties consent to e-signatures.
Common users include fabricators, OEMs, procurement teams, and project managers coordinating metal part production across supply chains.
Use this agreement when the work includes custom fabrication, precision tolerances, complex assemblies, or where tooling and IP allocation are material.
Define the exact parts, assembly steps, quantities, and delivery locations. Include reference drawings, bill of materials, measurable acceptance criteria, and any subcontracting permissions to avoid scope disputes during production.
List material grades, surface finishes, dimensional tolerances, heat-treatment or coating requirements, testing methods, and inspection plans tied to specific drawing callouts and industry standards like ASTM or ASME.
Specify accepted suppliers, material certification requirements, rejection remedies for defective parts, limited warranty duration, and procedures for repair, replacement, or credit for nonconforming goods immediately.
State total contract price, deposit and milestone payment schedule, invoicing requirements, retainage, late payment interest, and conditions for withholding payment due to nonconformity or delayed delivery.
Describe the process for requesting, pricing, and approving changes to scope or specifications, including time extensions, cost adjustments, and the effect on lead times and delivery milestones.
Allocate ownership or license of drawings, CAD files, jigs, fixtures, and tooling. Clarify who pays for tooling, storage, maintenance, and conditions for reuse or disposal after completion.
| Field | Configuration |
|---|---|
| Signer Order | Sequential | Fabricator then Purchaser |
| Authentication | Email link | SMS code optional |
| Fields | Signature, initials, date, attachment |
| Auto Reminders | 3 reminders | 3-day intervals |
Date when performance and payment obligations begin.
Specify dates for delivery and allowable tolerance windows.
Timeframe for inspection and formal acceptance after delivery.
Invoice due dates, milestone triggers, and retainage percentage.
Deadline to report defects and request remedy under warranty.
A subcontractor produced 100 precision brackets under a short lead prototype order tied to stringent aerospace tolerances and serial traceability.
A manufacturer contracted a fabricator for multi-year supply of stamped parts with annual volumes, tooling amortization, and scheduled upgrades.