METER RELOCATION REQUEST

This Meter Relocation Request ("Request") is entered into between the Customer and the Utility as set forth below. The parties agree as follows:

WHEREAS

WHEREAS, Customer desires to relocate the existing utility meter located at the Service Address for operational or aesthetic reasons and requests that Utility perform the relocation in accordance with Utility's standards and applicable law; and

WHEREAS, Utility is willing to perform the relocation subject to the terms, payment of fees, access to the Property, and compliance with Utility requirements described in this Request.

APPLICANT / CUSTOMER INFORMATION

PROPERTY / METER LOCATION

Current Meter Location: .

Requested New Meter Location: .

Electric Gas Water

SCOPE OF WORK

Describe the work requested, including removal and reinstallation tasks, trenching, conduit, pedestal pads, or other site modifications. Include any required coordination with other trades.

Site Plan Attached:

PAYMENT TERMS

Estimated Relocation Cost (Customer pays):

Late Payment: Any amounts not paid when due shall accrue interest at a rate of or the maximum permitted by applicable law, whichever is less.

SCHEDULE, TERM AND TERMINATION

Requested Start Date: . Estimated Completion Date: .

Either party may terminate this Request upon written notice to the other party if the terminating party provides days' prior written notice. Utility may delay or cancel work for safety, permitting, or operational conflicts, with timely notice to Customer.

ACCESS, PERMITS, AND SITE CONDITIONS

Customer represents that Customer is the property owner or has obtained the property owner's written authorization for Utility to access the Property to perform the work. Customer shall secure any necessary permits unless otherwise agreed. Customer authorizes Utility and its contractors to enter the Property to perform the relocation and related work and to restore disturbed areas in a manner consistent with Utility practice.

Property Owner Authorization Provided:

INDEMNITY AND LIABILITY

Customer shall indemnify, defend and hold Utility and its agents harmless from and against claims, losses, liabilities, or damages arising out of Customer's negligence, inaccurate information, or failure to obtain required permissions or permits. Utility's liability for damages arising from Utility's work on the meter relocation shall be limited to direct damages and shall not include consequential or punitive damages, except as required by law.

CONFIDENTIALITY

Unless otherwise required by law, the parties agree that proprietary information exchanged in connection with this Request, including cost estimates and site plans, shall be treated as confidential by the receiving party and shall not be disclosed to third parties except to agents, contractors, or as required to perform the work.

GOVERNING LAW; ENTIRE AGREEMENT

This Request will be governed by and construed in accordance with the laws of the state in which the Service Address is located. This Request, together with any Utility written estimates or standard terms incorporated by reference herein, constitutes the entire agreement between the parties regarding the meter relocation and supersedes all prior negotiations and representations.

CERTIFICATION AND AUTHORIZATION

By signing below, Customer certifies that the information provided is true and accurate, that Customer has authority to request the relocation and to authorize access to the Property, and that Customer agrees to pay fees and comply with the terms set forth in this Request.

Customer Name:

Printed Name:

By:

Date:

Utility Representative:

Printed Name:

By:

Date:

Enter text✕

What a Meter Relocation Request Is

A Meter Relocation Request is a formal utility application submitted to move a utility meter (electric, gas, or water) from one point on a property to another. The request records current and proposed meter positions, site access details, technical plans, and authorization from the property owner or agent. Utilities use the request to assess safety, code and permit requirements, scheduling, and any billing adjustments needed. A complete request begins a documented review and inspection process before licensed personnel perform the relocation.

Why a Clear Request Matters

A complete Meter Relocation Request reduces review time, clarifies responsibilities, and documents safety checks. It helps utilities and contractors confirm code compliance, estimate costs, and schedule inspections with fewer site visits or rework.

Why a Clear Request Matters

Who Typically Submits or Signs This Request

Common parties involved include property owners, licensed contractors, and utility staff who coordinate approvals and field work.

  • Property owners or authorized agents: request relocation for construction, renovation, or access issues.
  • Licensed electricians or contractors: submit technical plans and coordinate inspections with the utility.
  • Utility company staff or installers: review permits, schedule work, and perform the meter change.

Make sure the form identifies the responsible signer, their authority, and reliable contact details for scheduling and inspections.

Who Signs and Why

Property Owner

The owner or authorized agent signs to authorize relocation, grant site access, and accept charge estimates. Their signature confirms authorization for contractors and the utility to enter the property and proceed with code-required work and billing adjustments.

Utility Representative

A utility representative or authorized technician signs when approving relocation plans, confirming inspection requirements, and scheduling the meter transfer. Their approval documents compliance with utility standards, safety protocols, and billing system updates.

Required Core Information

Applicant Name: Full legal name of requester
Service Address: Street address with ZIP code
Meter ID: Utility-assigned meter number
Proposed Location: Brief description or panel position
Reason for Relocation: Renovation, safety, access, or code
Attachments: Site plan, electrical diagram, permits

Consequences of an Incorrect or Incomplete Request

Application Denial: Request returned without approval
Reinspection Fees: Additional charges for repeat inspections
Unsafe Work Liability: Contractor or owner responsibility
Billing Errors: Incorrect meter reading or account charges
Permit Fines: Municipal penalties for unpermitted relocations
Schedule Delays: Longer lead time and costs

Common Preparation Mistakes to Avoid

  • Submitting an incomplete site plan or missing meter ID causes review delays and likely additional information requests from the utility.
  • Failing to confirm contractor licensing or electrician credentials can result in rejected plans or work stoppage at inspection.
  • Not disclosing easements, buried utilities, or access restrictions leads to safety holds and potential additional permits.
  • Using an incorrect billing account or owner contact information prevents scheduling and can shift liability or charges.

Step-by-Step: How to Complete the Form

Follow these steps to prepare, complete, and submit a Meter Relocation Request electronically or on paper.

  • 01
    Prepare Site Plan: Provide a scaled drawing and proposed meter position.
  • 02
    Complete Applicant Info: Enter owner, contact, and account details accurately.
  • 03
    Attach Supporting Docs: Upload permits, electrical diagrams, and contractor license.
  • 04
    Submit & Track: Send via utility portal and record the confirmation number.

Where to Submit and How It Is Processed

A Meter Relocation Request may be submitted through multiple channels; utilities follow a review, inspection, and scheduling workflow once they receive it.

  • Utility Portal: Primary electronic submission and status tracking.
  • Customer Service Email: Alternate submission with documentation attached.
  • In-Person Office: Paper submissions accepted where local policy permits.
  • Mail: Certified mail for record of receipt if required.

What to Include in a Professional Request

A complete Meter Relocation Request contains applicant data, technical plans, authorization, and proof of compliance. Clear, labeled exhibits reduce back-and-forth with the utility and shorten review time.

Applicant Details

Full name, mailing address, utility account number, phone and email for scheduling and billing notifications; identify the authorized signer and provide proof of authority when the requester is an agent.

Site Plan

A scaled drawing or photo showing existing meter, proposed new location, distances to structures and property lines, and notes on access pathways to assist safety review and inspector planning.

Technical Information

Electrical or plumbing schematics, meter socket details, load data, and any panel changes that could affect code compliance or require additional upgrades.

Contractor Information

Licensed electrician or contractor name, license number, contact, and proof of insurance; utilities often require licensed installers for meter work.

Permits & Approvals

Copies of municipal permits, zoning approvals, and any third-party authorizations needed prior to relocation; missing permits commonly delay approval.

Signature & Authorization

Owner or authorized agent signature with date; include authorization letters for agents and, where required, notarization or other verification of authority.

How to Configure an Online Request Form

Standard online workflows capture required fields, attachments, and automated notifications to streamline utility review and contractor coordination.

Field Configuration
Applicant Name Required text field; validate against account records
Site Plan PDF or image upload; require minimum resolution and labels
Signature Allow digital signature; collect signer IP and timestamp
Notifications Email confirmations to applicant and utility contacts

Delivery Options and Technical Integrations

Meter relocation requests work with email, web portals, and document systems; integrations reduce manual entry and centralize records.

  • Salesforce: CRM integration for case tracking and service history
  • NetSuite: ERP integration for billing and work orders
  • Google Workspace: Cloud storage and document collaboration

Typical Timelines and Processing Expectations

Processing times vary by utility and locality; provide realistic expectations so applicants can plan inspections, contractor schedules, and service interruptions.

Initial Review Window:

Typically 5–15 business days for completeness check and fee estimate

Permit Approval Time:

Varies by municipality; often 1–4 weeks depending on scope

Inspection Scheduling:

Usually scheduled within 3–10 business days after approval

Field Work Lead Time:

Depends on technician availability and required equipment

Final Meter Activation:

Performed after inspection and completion of any required upgrades

Key Milestones in the Relocation Process

A typical request follows these sequential milestones from submission to final activation.

01

Submission

Applicant provides form, site plan, and attachments for initial review.

02

Utility Review

Utility assesses safety, permit needs, and estimates work scope.

03

Inspection & Permit

Municipal inspection and permit issuance, if required, occur prior to field work.

04

Work & Activation

Technicians relocate the meter, inspect, and activate service after approval.

Downloadable Formats and Export Options

Provide the completed Meter Relocation Request and supporting files in formats that utilities accept to ensure paperwork and records remain accessible.

PDF

Standard archival format for permits and signed records; preserves layout and signatures

DOCX

Editable format for draft revisions or internal review before finalizing

HTML

Web-friendly format suitable for utility portals and embedded forms

Excel

Use for tabular site measurements, equipment lists, and cost estimates

eSignature Pricing Snapshot for Submitting Meter Relocation Requests

Common eSignature vendors and starting price points for organizations that digitize utility requests; signNow is listed first for reference.

signNow DocuSign Adobe Sign PandaDoc HelloSign
Starting Price $8/user/mo $15/user/mo $14/user/mo $19/user/mo $15/user/mo
Free Trial 7-day free trial Varies by vendor Varies by vendor Varies by vendor Varies by vendor
Bulk Send Yes (Business Premium) Yes Yes Yes Varies by plan
Audit Trail Yes Yes Yes Yes Yes
HIPAA Compliant Yes Yes Yes No No

Frequently Asked Questions about Meter Relocation Requests

Answers to common questions about submission, authorization, timelines, and electronic signing to help avoid delays and ensure compliance.


Need help? Contact support

be ready to get more
Join over 28 million airSlate SignNow users