Title and Project
Project name, contract number, and a concise document title identifying the acta and its purpose.
A precise acta preserves measurement history, reduces rework, and creates a defensible record for disputes or inspections; it also informs project sequencing and permissions.
The document is created and used by on-site professionals and stakeholders involved in layout and construction.
Proper distribution ensures designers, contractors, inspectors, and owners have a consistent record to support execution, payments, and regulatory compliance.
A licensed surveyor signs to certify the accuracy of measurements, reference points, and coordinate datum. Their signature affirms professional responsibility and is frequently required for permits or recordation.
The owner or authorized representative signs to acknowledge receipt and acceptance of the replante record; this confirms intent to rely on the documented layout and can trigger downstream actions like payments or inspections.
| Field | Configuration |
|---|---|
| Authentication method | Email with optional SMS code for signer verification |
| Field placement | Signature, date, measured coordinates, photo attachments |
| Conditional fields | Show revision block only when measurements differ |
| Notifications | Auto-notify surveyor, contractor, and owner on completion |
Choose a platform that supports common file formats, signer authentication, and audit trails to preserve evidentiary value.
Project name, contract number, and a concise document title identifying the acta and its purpose.
List plan sheets, revision numbers, and the drawing scale so measurements can be traced to design documents.
Declare projection, coordinate system, and control points used for all measured locations.
Tabulate stake IDs, bearings, distances, coordinates, and physical descriptions for each point established.
Record cross-checks, tolerances, anomalies, and corrective actions taken in the field.
Signature blocks for the surveyor, contractor, and owner with printed name, license, and signing date.
Prepare acta within project mobilization week
Conduct stakeout before major civil work begins
Obtain surveyor and owner signatures within 7 days
Submit acta with permit packages as required
Retain copy immediately after final sign-off
Define control points, datum, and required tolerances.
Place stakes and record measurements on-site.
Cross-check positions and make necessary adjustments.
Surveyor and authorized parties sign the completed acta.
A contractor receives an acta documenting offset points and foundation corners to begin excavation.
An owner orders a replante to confirm a lot corner prior to building a fence.
| Document Type | Acta de Replante | As-Built Plan |
|---|---|---|
| Primary Purpose | site staking record | final installed layout |
| When Issued | before/during construction | after construction |
| Typical Signers | surveyor & owner | engineer & contractor |
| Legal Use | execution and dispute evidence | record of completion |
| signNow | DocuSign | Adobe Sign | PandaDoc | HelloSign | |
|---|---|---|---|---|---|
| Starting Price | $8/user/mo | $15/user/mo | $14/user/mo | $19/user/mo | $15/user/mo |
| Free Trial | 7-day free trial | Varies by plan | Varies by plan | Varies by plan | Varies by plan |
| Bulk Send | Yes | Yes | Yes | Yes | No |
| Audit Trail | Yes | Yes | Yes | Yes | Yes |
| HIPAA Compliant | Yes | Yes | Yes | No | No |
| Envelope Cap | No cap | 100 envelopes/user/year | Varies | Varies | Varies |