Scope of Work
Define precise deliverables, excluded items, site preparation responsibilities, permitting duties, and who provides supporting infrastructure such as HVAC, cable routing, and structural reinforcement.
A consistent template reduces ambiguity, allocates technical risk, and records acceptance criteria and responsibilities. It supports traceable approvals and can be executed electronically in compliance with the ESIGN Act (15 U.S.C. ch. 96) and UETA where adopted.
Project teams, AV integrators, general contractors, owners, and procurement professionals use this template to record dvLED project scope and acceptance.
Use consistently across sites to reduce disputes, speed approvals, and provide a single source of truth for installation, commissioning, and warranty follow-up.
Define precise deliverables, excluded items, site preparation responsibilities, permitting duties, and who provides supporting infrastructure such as HVAC, cable routing, and structural reinforcement.
Include module and cabinet dimensions, pixel pitch, LED type, brightness levels, color calibration requirements, power consumption, control protocol, and redundancy or failover expectations.
Detail mounting system, anchorage requirements, tolerances, access panels, ventilation, and structural sign-off by a licensed engineer when required.
Specify voltage, distribution boards, grounding, surge protection, conduit runs, cable types, and on-site electrician scope for final connections.
Define pre-delivery bench tests, on-site commissioning procedures, pixel mapping verification, burn-in duration, and final acceptance criteria with sign-off forms.
Describe warranty duration, remedies, spare parts policy, response times for onsite service, and escalation steps for extended outages or manufacturer defects.
| Field | Configuration |
|---|---|
| Signer Order | Sequential routing with owner final sign-off |
| Authentication | Email verification or SMS code for signer identity |
| Allowed Attachments | Drawings (PDF, DWG), photos, and wiring diagrams |
| Export Format | Signed PDF with embedded audit trail |
Ensure chosen e-signature and file storage systems meet security and integration needs for project teams and records.
Within 5–15 business days after PO or NTP
Typically 4–12 weeks, depending on manufacturer lead times
Schedule 3–10 business days on site per wall size
Allow 1–3 days for pixel mapping and calibration
Conduct within 10 business days after commissioning completion
Owner issues PO and supplier confirms lead times.
Manufacturer produces modules and ships per schedule.
Integrator mounts cabinets and connects power and control.
Owner signs acceptance after tests pass.
| Criteria | dvLED Contract | Real Estate Deed |
|---|---|---|
| Notarization | no (generally) | yes (required) |
| Witnesses | usually none | often 1–2 witnesses |
| Technical Exhibits | detailed drawings required | deeds include legal description |
| Permits | local building permits likely | not applicable |
| signNow | DocuSign | Adobe Sign | PandaDoc | HelloSign | |
|---|---|---|---|---|---|
| Starting Price | $8/user/mo | $15/user/mo | $14/user/mo | $19/user/mo | $15/user/mo |
| Free Trial | 7-day free trial | Varies by plan | Varies by plan | Varies by plan | Varies by plan |
| Bulk Send | Yes | Yes | Yes | Yes | No |
| Audit Trail | Yes | Yes | Yes | Yes | Yes |
| Envelope Cap | No cap | 100 envelopes/user/year | Varies by plan | Varies by plan | Varies by plan |
A venue retrofit required precise module tolerances and structural sign-off
A multi-store rollout demanded consistent specifications across 50 locations
An owner-appointed project manager who is authorized to accept deliverables, approve change orders, and sign final acceptance documents on behalf of the owner; must be named in the template or have delegated authority documented.
A corporate officer or designate from the supplier or integrator who has authority to bind the company contractually, confirm warranty commitments, and accept payment terms; verify signing authority before execution.