Title Block
Project identification, drawing number, revision, scale, and responsible firm clearly shown for legal and contractual reference.
Clear, complete primary drawings reduce costly change orders, speed permitting reviews, and limit disputes by documenting design intent and required approvals.
Multiple stakeholders should access the same signed and versioned drawing set to avoid conflicting instructions during project execution.
| Field | Configuration |
|---|---|
| Versioning Policy | Require sequential revision IDs and immutable issued-for-construction flags. |
| Approval Order | Set role-based signer order: designer → reviewer → client → contractor. |
| Authentication | Use email + access code or stronger methods for high-risk approvals. |
| Audit Trail | Capture timestamps, IP, and signer identity for every approval. |
Ensure your tool retains an unalterable record of who approved each revision and when.
Allow time for multi-cycle plan review; local timelines vary.
Issue final drawings before bid due date to avoid addenda.
Coordinate drawings with vendor lead times to prevent schedule slip.
Ensure issued-for-construction set is approved before mobilization.
Submit as-built set at contract closeout per contract terms.
Final design documents prepared for internal QA and coordination.
Submit to authority having jurisdiction for plan check and approval.
Authorized drawing set released with approval stamp and version ID.
Capture field changes and produce final record drawings.
Project identification, drawing number, revision, scale, and responsible firm clearly shown for legal and contractual reference.
Concise history of changes with dates and approver initials to ensure traceability across procurement and field work.
Project-wide specifications and references to standards, codes, and material requirements that apply across multiple sheets.
Clear scales and labelled dimensions that contractors can use directly for fabrication and site layout.
Material types, finishes, and tolerance requirements to avoid substitution and quality disputes.
Signed, dated approval area showing responsible designer, reviewer, and client sign-offs for permit and construction use.
| Criteria | Primary Drawings | Shop Drawings | As-Built Drawings |
|---|---|---|---|
| Legal Effect | contract document | fabrication instruction | record of work |
| Typical Use | design intent | manufacturer detail | field verification |
| Required Attachments | specs and schedules | fabrication details | field change log |
| Common Signers | designer/engineer | manufacturer rep | project manager |
| signNow | DocuSign | Adobe Sign | PandaDoc | HelloSign | |
|---|---|---|---|---|---|
| Starting Price | $8/user/mo | $15/user/mo | $14/user/mo | $19/user/mo | $15/user/mo |
| Free Trial | 7-day free trial | Varies by plan | Varies by plan | Varies by plan | Varies by plan |
| Bulk Send | Yes (Premium/Enterprise) | Yes | Yes | Yes | Varies by plan |
| Audit Trail | Yes | Yes | Yes | Yes | Yes |
| Envelope Cap | No cap | 100 envelopes/user/year | Varies by plan | Varies by plan | Varies by plan |
Design and permit sets issued digitally for multiple retail projects
Integration of signed drawings into ERP workflows for procurement