Dimensions
Clear interior pan dimensions, curb heights, and tolerance margins with room for field notes and measured deviations from plan.
A consistent template reduces misunderstandings, documents compliance steps, and preserves the installation record for permits and claims. Clear specifications help prevent water intrusion, reduce rework, and provide a defensible paper trail for inspections and warranty claims.
This template is used across the construction lifecycle by parties who design, install, inspect, or approve shower pans.
Parties keep a signed copy in the job file and share completed templates with permitting authorities, owners, and insurers as needed.
Clear interior pan dimensions, curb heights, and tolerance margins with room for field notes and measured deviations from plan.
Specified slope (e.g., 1/4 in per foot) and measurement points to ensure positive drainage and reduce standing water risk.
Exact drain type and centerline offsets shown on plan with elevation and hardware specifications to coordinate trades.
List of acceptable membranes, mortar mixes, trays, fasteners, and substrate prep requirements tied to manufacturer instructions.
Membrane application method, seam detailing, flashing requirements, and inspector checkpoints for continuous barrier verification.
Wet or pneumatic test protocol, duration, acceptance criteria, and signature block for installer, inspector, and owner.
| Field | Configuration |
|---|---|
| Document Type | PDF form with fillable fields and image placeholders |
| Authentication | Email plus optional SMS code for signer verification |
| Routing | Role-based sequence: installer → inspector → owner |
| Export Format | PDF/A for long-term archival |
Store and share the template as a searchable PDF and use an eSignature platform that supports mobile signing and audit trails.
Choose systems that export tamper-evident signed PDFs and preserve audit trails so inspection records remain verifiable over the document lifecycle.
Expect several days to weeks depending on local plan review workload.
Schedule after substrate prep; inspector availability dictates timing.
Run wet test for minimum duration as specified by local code or manufacturer.
Occurs after tile set and grout cured; inspector verifies template items.
Warranty typically begins at final acceptance or owner sign-off.
Finalize pan layout and materials before demolition.
Complete framing and substrate before waterproofing.
Apply membrane and flashings per manufacturer instructions.
Perform test, collect signatures, and file paperwork.
A remodel team standardized their specs across jobs to reduce tile rework by documenting slope and drain details pre-installation.
An owner submitted a completed template to an insurer after a leak claim to show prior test results and installer acceptance.
| signNow | DocuSign | Adobe Sign | PandaDoc | HelloSign | |
|---|---|---|---|---|---|
| Starting Price | $8/user/mo | $15/user/mo | $14/user/mo | $19/user/mo | $15/user/mo |
| Free Trial | 7-day free trial | Varies by vendor | Varies by vendor | Varies by vendor | Varies by vendor |
| Bulk Send | Yes | Yes | Yes | Yes | No |
| Audit Trail | Yes | Yes | Yes | Yes | Yes |
| HIPAA Compliant | Yes | Yes | Yes | No | No |