Door Schedule
Enumerates door tags, sizes, swing, and quantities so ordering and installation teams use a single authoritative list tied to drawings.
Using a consistent template reduces errors, clarifies procurement and installation responsibilities, and improves inspection and warranty traceability while helping teams meet building-code and project-documentation standards.
A concise set of project roles rely on the Miscellaneous Standard Doors Template to communicate door requirements across design, procurement, and field teams.
Clear role assignment in the template prevents duplicate tasks and speeds approvals during procurement and inspections.
Enumerates door tags, sizes, swing, and quantities so ordering and installation teams use a single authoritative list tied to drawings.
Specifies face materials, core types, edge construction, and acceptable manufacturers to ensure compatibility with fire rating and finish requirements.
Lists locksets, hinges, closers, strikes, gasketing, and special items by hardware set number for clear procurement and installer reference.
Records fire-rating classification, labeled status, glazing limitations, and required signage to support code inspections and life-safety compliance.
Defines factory and field finish details including paint codes, stain tolerances, and acceptable deviations for warranty and aesthetic control.
Includes rough opening tolerances, anchorage details, threshold requirements, and inspector signoffs to reduce on-site rework and disputes.
| Field | Configuration |
|---|---|
| Signature Order | Specifier | Contractor | Owner |
| File Format | PDF | DOCX |
| Storage Location | Project folder in shared drive |
| Notifications | Email alerts to approvers |
Choose platforms and file formats that match your project toolchain and accessibility needs.
Ensure recipients can open and annotate the chosen file format and that the platform retains an audit trail of changes and approvals.
Submit door specifications with permit package per municipal schedule.
Allow 2–8 weeks depending on material and customization.
Coordinate deliveries to match staging and installation dates.
Set after rough-in and finished trades clearance.
Schedule after installation and punch-list completion.
Designer approves final door schedule and hardware sets.
Supplier receives signed order and releases production.
Doors arrive staged for installation.
Installer corrects issues and owner signs acceptance.
An architect finalizes a door schedule tied to permit drawings to avoid rework at installation
The facilities manager requires specific infection-control finishes and access-control hardware on every patient-room door
| signNow | DocuSign | Adobe Sign | PandaDoc | HelloSign | |
|---|---|---|---|---|---|
| Starting Price | $8/user/mo | $15/user/mo | $14/user/mo | $19/user/mo | $15/user/mo |
| Free Trial | 7-day free trial | Varies | Varies | Varies | Varies |
| Bulk Send | Yes | Yes | Yes | Yes | Varies |
| Audit Trail | Yes | Yes | Yes | Yes | Yes |
| Envelope Cap | No envelope cap | 100 envelopes/user/year | Varies | Varies | Varies |