Establishing secure connection…Loading editor…Preparing document…

Move-in Inspection Checklist

This template is fully customizable. Edit the text, fill out the fields, and send it for signature. Give it a try!

MOVE-IN INSPECTION CHECKLIST

This Move-in Inspection Checklist documents the condition of the premises at the time Tenant takes possession. Tenant and Landlord/Agent must complete and sign this form. Items noted here will be the baseline for determining responsibility for damage and security deposit deductions. Photographs or supporting evidence attached to this form are incorporated by reference.

PROPERTY IDENTIFICATION

PARTIES & INSPECTION DETAILS

Inspection Date:    Time:    Move-in Date:

KEYS, ACCESS, & METERS

ROOM-BY-ROOM CONDITION

Instructions: For each room, check items that describe condition at move-in. Use Comments to describe stains, cracks, missing parts, or other defects. If an item is not present, check N/A.

LIVING ROOM

Floors:

Walls/Ceiling:

Doors/Windows:

Electrical / Lighting / Outlets:

KITCHEN

Floors:

Cabinets/Countertops:

Appliances:

BATHROOM(S)

Fixtures (sink, toilet, tub/shower):

Floors / Tiles / Grout:

BEDROOM 1

Floors / Walls / Closets:

BEDROOM 2 / ADDITIONAL ROOMS

Condition summary:

EXTERIOR / GARAGE / BALCONY

Exterior surfaces / Garage:

SAFETY & APPLIANCE CHECKS

Smoke detectors present and operational:

Carbon monoxide detector present and operational:

DISCLOSURES / SPECIAL NOTES

Lead-based paint known to be present:

Mold, moisture, or prior water intrusion observed:

TENANT / LANDLORD ACKNOWLEDGEMENTS

Tenant acknowledges that the items and conditions noted above accurately reflect the condition of the premises at move-in except as specifically noted. Tenant must report any additional defects discovered within 5 calendar days of move-in. Landlord will be responsible for repairs as required by the lease and applicable law; items flagged as Tenant damage may be deducted from the security deposit in accordance with the lease.

This checklist is part of and incorporated into the Lease Agreement between the parties and constitutes the complete written record of the premises' condition at move-in.

Landlord / Agent (Print Name):

By:

Date:

Tenant (Print Name):

By:

Date:

Enter text✕

What the Move-in Inspection Checklist Is and when to use it

A Move-in Inspection Checklist is a written record used by landlords, property managers and tenants to document the condition of a rental unit at the start of occupancy. It lists rooms, fixtures and appliances, notes existing damage or wear, and records meter readings and keys provided. Completed and signed by both parties, the checklist creates a baseline that supports security-deposit accounting, repair responsibility, and dispute resolution. Use the checklist at lease start and attach photographs or timestamps to improve evidentiary value and reduce later disagreements.

Why documenting condition at move-in matters

A clear, signed move-in checklist reduces disputes by establishing a mutual condition baseline, clarifies repair responsibilities, and supports lawful deductions from security deposits under state landlord–tenant laws. It also preserves evidence for mediation or court if disagreements arise.

Why documenting condition at move-in matters

Who typically completes a Move-in Inspection Checklist

Property managers, landlords, leasing agents, and tenants use this checklist to record unit condition and inventory at lease commencement.

  • Tenants: Complete or review the checklist with the landlord to confirm existing damage and request photos for their records.
  • Landlords / Managers: Use the checklist to document condition, record appliance function, and collect signatures to support deposit accounting.
  • Inspectors / Leasing Agents: Conduct walk-throughs, note safety issues, and forward signed copies to all parties and the property file.

Keep signed copies with the lease and provide tenant and owner copies; retain the original per record-retention policies.

Core components of a professional Move-in Inspection Checklist

A complete checklist combines location and administrative details with room-by-room condition entries, measurements or meter readings, signatures, and supporting media. Standardizing these elements increases accuracy and legal defensibility.

Property Header

Unit address, lease start date, landlord and tenant names, and contact details for record linking and legal notices.

Room Inventory

Individual room sections listing walls, floors, ceilings, windows, doors, fixtures, and appliances with condition checkboxes and comment fields.

Meter & Key Log

Recorded utility meter readings, number and type of keys provided, and smoke/CO alarm check status.

Damage Notes

Specific descriptions of existing scratches, stains, dents or mechanical issues, with space for photo references and timestamps.

Signatures

Signature blocks for tenant and landlord with printed names and dates to confirm mutual review and acceptance.

Attachment List

Photo index, video file names, repair requests, and copies of any pre-existing vendor estimates included as exhibits.

Required information to include on the checklist

Unit Address: Street, unit, city, state, ZIP
Lease Start Date: MM/DD/YYYY
Tenant Name: Full legal name
Landlord Name: Legal owner or management company
Signature Lines: Printed name, signature, date
Photo References: File names or timestamps

How to complete the Move-in Inspection Checklist step by step

Follow a consistent walk-through order, capture evidence, and collect signatures from all parties immediately to lock the condition record.

  • 01
    Prepare: Open the checklist, confirm lease start date, and bring a camera or phone for photos.
  • 02
    Walk the Unit: Inspect each room systematically and mark condition checkboxes and notes.
  • 03
    Record Evidence: Take timestamped photos or short videos of any defects and name files to match checklist entries.
  • 04
    Sign and Distribute: Have tenant and landlord sign and exchange signed copies right away.

Configuring an online inspection workflow

Set up fields, required signers, and attachments so inspections are consistent and auditable when completed electronically.

Field Configuration
Required Signers Tenant and landlord or authorized agent
Photo Attachments Make photos required for any 'damaged' checkbox
Signature Type Electronic signature with audit trail
Retention Auto-save completed form to property file storage

Digital signing and delivery considerations

Choose a signing platform that supports attachments, audit trails, and secure storage to preserve evidentiary value.

  • File Formats: PDF or PDF/A recommended
  • Authentication: Email link plus optional SMS code
  • Integrations: Property management software and cloud storage

Ensure the chosen workflow records signer attribution, timestamps, and preserves original photo files alongside the signed checklist for compliance and dispute support.

Where to send and store completed checklists

Decide routing and storage locations before the inspection so signed copies reach all required parties automatically.

  • Tenant Copy: Email the tenant a signed PDF immediately after completion
  • Owner / File: Save a copy to the property owner's records or management portal
  • Insurance: Send copies to insurer when pre-existing damage affects coverage
  • Maintenance: Create work orders for identified repairs and link to checklist items

Timing to complete and file the checklist

Complete the move-in checklist on or before the lease start date and deliver signed copies promptly to preserve rights under state statutes.

Completion Deadline:

On or before lease start date

Tenant Return:

Provide tenant copy within 24–72 hours of signing

Repair Notices:

Submit repair requests to maintenance within 3 business days

Deposit Accounting:

Use checklist when calculating allowable deductions at move-out

Retention Requirement:

Retain signed checklist per your record-retention policy

Common mistakes to avoid when preparing the checklist

  • Vague descriptions: Using subjective words like 'fair' or 'old' instead of precise descriptions or measurements invites disputes later.
  • Missing photos: Failing to attach timestamped photos removes strong evidence of pre-existing damage, weakening deposit defense.
  • Incomplete signatures: Allowing one party to sign without the other or omitting dates undermines mutual acceptance and may be challenged.
  • Improper storage: Keeping only paper copies or unsecured files can result in lost records when evidence is needed for claims.

Risks of an incomplete or incorrect checklist

Disputed Deductions: Tenant may contest deposit deductions
Legal Fees: Possible attorney costs to resolve disputes
Regulatory Penalties: State damages or fee awards in bad-faith cases
Insurance Gaps: Unrecorded damage may not be covered
Operational Delays: Repairs delayed due to unclear responsibility
Evidence Loss: Absent photos weakens landlord's case

Common eSignature vendor comparison for signing Move-in Inspection Checklists

The table compares starting price, trial availability, bulk send, audit trail, HIPAA compliance, and envelope caps across common eSignature providers; signNow is listed first per vendor ordering rules.

signNow DocuSign Adobe Sign PandaDoc HelloSign
Starting Price $8/user/mo $15/user/mo $14/user/mo $19/user/mo $15/user/mo
Free Trial 7-day free trial Varies by plan Varies by plan Varies by plan Varies by plan
Bulk Send Yes Varies by plan Varies by plan Varies by plan Varies by plan
Audit Trail Yes Yes Yes Yes Yes
HIPAA Compliant Yes Yes Yes No No
Envelope Cap No cap 100 envelopes/user/year Varies by plan Varies by plan Varies by plan

Real-world examples of move-in inspection use

Two concise scenarios show common workflows and outcomes when checklists are used consistently.

Property Manager Example

A mid-size management company conducts digital inspections for new tenants

  • Uses timestamped photos for every defect
  • As a result, deposit disputes dropped 60% and maintenance scheduling became automatic through integrated ticketing.

Independent Landlord

A sole-owner landlord performs walk-throughs with tenants at lease start

  • Collects signatures via an e-sign platform with photo attachments
  • The signed packet supported a successful defense against an unfounded damage claim in small-claims court.

Practical tips for accurate and efficient completion

Adopt consistent procedures and use evidence to strengthen checklist reliability and reduce disputes.

Standardized Walk-throughs
Follow the same room order for every inspection to ensure items aren’t missed and to simplify training for staff.
Timestamped Evidence
Attach photos or short videos with file names that reference unit and date to strengthen proof of pre-existing conditions.
Require Signatures
Make both tenant and landlord signatures required for acceptance; keep electronic audit trails showing IP, timestamp, and signer email.
Sync with Maintenance
Create repair tickets from checklist items immediately to reduce response time and document remediation responsibility.

Frequently asked questions about Move-in Inspection Checklists

Answers address common points of confusion about signing, evidence, storage, and legal effect for landlords and tenants.


Need help? Contact support

be ready to get more
Join over 28 million airSlate SignNow users