Project Summary
Concise project description, proposed land uses, and an overview of anticipated impacts and mitigation measures in a single-page executive summary.
A complete, accurate draft reduces review cycles, minimizes delays in scheduling public hearings, and helps the board identify design or compliance issues early. Clear submissions improve interagency coordination and reduce the likelihood of formal resubmission or conditional approvals.
Local governments, applicants, and project teams each play distinct roles in preparing and processing planning board drafts.
Effective collaboration among these parties shortens review timelines and clarifies required revisions prior to public hearings and final approvals.
Concise project description, proposed land uses, and an overview of anticipated impacts and mitigation measures in a single-page executive summary.
Scaled drawings showing lot lines, building footprints, parking, circulation, setbacks, grading, and stormwater controls with a legend and north arrow.
Current boundary survey certified by a licensed surveyor showing easements, rights-of-way, and floodplain limits where applicable.
Engineering, traffic, environmental, and stormwater reports that address county or municipal checklist items and applicable design standards.
Vicinity map, zoning map extract, aerial photograph, and utility service diagrams sized for reviewer legibility.
Owner authorization, applicant contact information, and design professional contact details including license numbers and addresses.
| Field | Configuration |
|---|---|
| Authentication Method | Email link or SMS code for signer verification |
| Field Types | Signature, date, initials, file attachment fields |
| Routing Order | Sequential reviewer order or parallel distribution |
| Notifications | Automated email reminders and status updates |
Ensure files and signing methods meet county and vendor technical standards before upload.
Confirm county-specific upload size limits and naming conventions, and retain original source files for records.
| signNow | DocuSign | Adobe Sign | PandaDoc | HelloSign | |
|---|---|---|---|---|---|
| Starting Price | $8/user/mo | $15/user/mo | $14/user/mo | $19/user/mo | $15/user/mo |
| Free Trial | 7-day trial | Varies | Varies | Varies | Varies |
| Bulk Send | Yes | Yes | Yes | Yes | No |
| Audit Trail | Yes | Yes | Yes | Yes | Yes |
| HIPAA Compliant | Yes | Yes | Yes | No | No |
Submit 7–30 days before meeting per county schedule
Allow statutory notice period before public hearing
Allow 2–6 weeks for interagency comments
Respond to comments within the timeframe set by staff
Occurs after public notice and technical clearance
Confirm required documents and fees are prepared before filing
County performs completeness check and assigns reviewers
Publish notice and distribute to affected parties
Board issues approval, conditional approval, or denial
Martin Properties submitted a site draft online to accelerate review
Optica Ventures used a standardized packet to coordinate engineers and surveyors
The municipal or county planning director often certifies receipt, assigns reviewers, and signs intake forms. They act in an administrative capacity to confirm completeness and may set submission deadlines.
The property owner or a person authorized in writing may sign application forms and authorization statements. Agents should attach an owner authorization letter or power of attorney if signing on behalf of the owner.
| Criteria | Planning Board Draft | Site Plan Application |
|---|---|---|
| Public Notice Required | no (draft stage) | yes (formal site plan) |
| Notarization | usually no | sometimes required |
| Environmental Review | preliminary screening | full review possible |
| Typical Attachments | concept plans | final engineered drawings |