Site Plan
Scaled drawing showing walkways, fixture locations, pole heights, mounting details, and proximity to utilities.
A concise, standardized document reduces misunderstandings about fixture placement, electrical loads, and code compliance, shortens procurement cycles, and creates a single authoritative record for installers, owners, and regulators.
The document centralizes responsibilities so each party knows what to deliver and what conditions must be met before final acceptance.
| Field | Configuration |
|---|---|
| Signature Order | Sequential or parallel per project needs |
| Authentication | Email link or SMS code for contractor and owner |
| Attachments | Include fixture datasheets and load calculations |
| Retention | Save signed PDF and audit trail to project folder |
Where electronic signatures are used, include a complete audit trail and retain both the signed file and metadata to support warranty and compliance claims.
Scaled drawing showing walkways, fixture locations, pole heights, mounting details, and proximity to utilities.
Model numbers, photometrics, lumen outputs, color temperature, IP rating, and manufacturer cut sheets.
Conduit runs, circuit IDs, transformer locations, voltage drop calculations, and protective device specifications.
Measured lux foot-candle targets, alignment tolerances, and paint/finish acceptance standards.
References to NEC requirements, local ordinances, and any additional grounding or GFCI needs.
Authorized signers, printed names, titles, and effective date for warranties and start of work.
Include signed plans, fixture cut sheets, and electrical calculations as a single PDF for permit submission.
Export fixture lists and pricing to CSV or Excel for procurement and inventory reconciliation.
Provide the signed contract and completion checklist as a PDF with audit trail for records.
Deliver final as-built drawings in PDF and DWG where required for facilities management.
| signNow | DocuSign | Adobe Sign | PandaDoc | HelloSign | |
|---|---|---|---|---|---|
| Starting Price | $8/user/mo | $15/user/mo | $14/user/mo | $19/user/mo | $15/user/mo |
| Free Trial | 7-day free trial, no card | Varies by vendor | Varies by vendor | Varies by vendor | Varies by vendor |
| Bulk Send | Available (Business Premium) | Varies by plan | Varies by plan | Varies by plan | Varies by plan |
| Audit Trail | Yes | Yes | Yes | Yes | Yes |
| Envelope Cap | No cap | 100 envelopes/user/year | Varies by plan | Varies by plan | Varies by plan |
A municipal parks department prepared a fixture schedule and acceptance lux levels to secure grants.
An HOA required nighttime photometrics and dark-sky compliant fixtures to meet local ordinance.
Submit permit package at least 2–6 weeks before planned start.
Order fixtures 4–12 weeks in advance depending on model availability.
Schedule work for 1–3 weeks for typical walkway runs, subject to site complexity.
Request inspection immediately after installation completion for municipal sign-off.
Warranty typically begins on the signed acceptance date.
Owner signs off on layout and fixture schedule prior to ordering.
Obtain required permits and address any plan review comments.
Place orders and confirm delivery dates with suppliers.
Install fixtures, perform photometric testing, and document results.