PERMIT REVIEW CHECKLIST

Permit No.:    Application Received:

Applicant Name:

Project Address:

Parcel / Tax ID:    Permit Type:

Reviewer:    Review Date:

RECITALS

WHEREAS, the Applicant submitted documents and plans for the project described above for review under applicable municipal codes, ordinances, and regulations; and

WHEREAS, this Permit Review Checklist documents the administrative and technical review of the submitted materials and records the determinations, deficiencies, and conditions necessary for subsequent permit issuance and inspections.

SCOPE OF REVIEW

DOCUMENTS & PLANS RECEIVED

Site Plan:    Floor Plans:    Structural Calculations:

Mechanical Plans:    Electrical Plans:    Plumbing Plans:

Fire Protection Plans:    Energy Compliance Docs:    Other:

REVIEW CHECKLIST

Zoning Compliance — Use, Setbacks, Lot Coverage:    Compliant    Deficient    N/A

Building Code — Occupancy, Egress, Fire Rating:    Compliant    Deficient    N/A

Structural Review:    Compliant    Deficient    N/A

Mechanical / HVAC:    Compliant    Deficient    N/A

Electrical:    Compliant    Deficient    N/A

Plumbing:    Compliant    Deficient    N/A

Fire Protection / Life Safety:    Compliant    Deficient    N/A

Accessibility (ADA):    Compliant    Deficient    N/A

REQUIRED CORRECTIONS

Due by:

Due by:

FEES, BONDS & ADMINISTRATION

Plan Review Fee Paid:    Amount:    Bond Required:    Bond Amount:

DETERMINATION

Approved    Approved with Conditions    Denied

CERTIFICATION

I hereby certify that this review reflects the assessment of the submitted documents and that any approval indicated herein is conditioned upon compliance with the listed corrections, receipt of required fees and bonds, and satisfactory on-site inspections. This checklist is not a permit and does not authorize work until a permit has been issued in accordance with all applicable codes and ordinances.

Reviewer (Print Name):

Signature:

Date:

Enter text✕

What the Permit Review Checklist Is and When It’s Used

A Permit Review Checklist is a structured verification tool used by applicants, consultants, and municipal reviewers to confirm that a permit submission includes all required documentation, calculations, and approvals before formal processing or inspection. It typically lists plan sheets, supporting reports, fee receipts, contact information, zoning references, code citations, and items requiring clarification or resubmission. The checklist standardizes completeness checks across departments, reduces back-and-forth requests, and creates a traceable record of deficiencies and corrective steps. It is used for building, electrical, plumbing, environmental, and other regulatory permit types.

Why a Permit Review Checklist Matters for Project Delivery

A clear checklist minimizes submission errors, shortens review cycles, and documents reviewer decisions for appeals or audits. It centralizes requirements so applicants know what to include and municipal staff can apply consistent standards across similar permits.

Why a Permit Review Checklist Matters for Project Delivery

Primary Users and Reviewers of the Checklist

The Permit Review Checklist is used by both external applicants and internal municipal teams to confirm completeness and compliance before advancing an application.

  • Project Managers and Contractors — Prepare submissions, coordinate documents, and track open items during plan review.
  • Architects and Engineers — Verify that stamped drawings, calculations, and code compliance documents are attached and coordinated.
  • Municipal Plan Examiners — Apply a consistent review standard, record deficiencies, and assign next steps for approval or resubmission.

Using the checklist consistently improves transparency between applicants and reviewers and supports defensible permitting decisions.

Step-by-Step: Completing a Permit Review Checklist

Follow these steps to complete a checklist from submission through final decision.

  • 01
    Assemble Submission: Collect drawings, reports, and fee payment before creating the checklist.
  • 02
    Populate Checklist: Enter applicant details, permit type, and attach supporting documents.
  • 03
    Initial Review: Reviewer confirms required items and notes deficiencies with references.
  • 04
    Final Determination: Record approval, conditional approval, or denial and next steps.

Configuring an Online Permit Review Workflow

Map checklist fields to workflow actions so submissions route automatically and reviewers receive the correct context.

Field Action / Configuration
Permit Type Route to appropriate review team
Submission Date Trigger SLA timer for review
Supporting Documents Require file upload before submission
Reviewer Assignment Auto-assign based on queue rules

How Checklist-Based Reviews Flow Through Departments

A typical electronic checklist workflow automates routing, records each action, and returns clear instructions to applicants when revisions are needed.

  • Upload: Applicant uploads plans and completes checklist fields.
  • Route: System forwards submission to assigned reviewers based on permit type.
  • Review: Reviewer completes checklist, marking items OK or needing correction.
  • Resolve: Applicant addresses deficiencies and resubmits with updated attachments.

Technical Requirements for eSubmission and Review

Choose a platform that supports PDF/DOCX uploads, audit trails, role-based routing, and integration with your permitting system.

  • File Formats: PDF, DOCX, and image formats supported for plan and form uploads.
  • Integrations: Connectors for Microsoft 365, Google Workspace, Procore, or ERP systems.
  • Authentication: Email, SMS code, or stronger multi-factor options for signer identity.

Security and Compliance Checklist Items

Transport Encryption: TLS 1.2/1.3
At-Rest Encryption: AES-256
Regulatory Standards: ESIGN, UETA compliance
Healthcare Controls: HIPAA BAA available
Audit Trail: Timestamped action history
Access Controls: Role-based permissions

Common Pitfalls to Avoid During Permit Review

  • Incomplete plan sets or mismatched revisions that force multiple resubmissions and lengthen approval timelines.
  • Missing or inconsistent signatures and stamped documents that invalidate a submission and require re-execution.
  • Incorrect fee payments or wrong fee category selected, causing administrative returns and processing delays.
  • Vague reviewer comments without code references, which create ambiguity for applicants and increase back-and-forth.

Consequences of an Incorrect or Incomplete Checklist

Permit Delays: Extended review cycles
Project Fines: Civil penalties possible
Stop Work: Work suspension risk
Rework Costs: Additional contractor expense
Bond Forfeiture: Surety exposure
Legal Liability: Increased dispute risk

Typical Timelines and Processing Expectations

Municipal review timelines vary by jurisdiction and permit complexity; track statutory review windows and internal SLAs on the checklist.

Submission Receipt:

Date stamp when materials and fees are received

Initial Completeness Review:

Often completed within 10–30 business days depending on workload

Corrective Response Window:

Applicant typically given a set period to respond, e.g., 30 days

Inspection Scheduling:

Inspections scheduled after approvals or conditional approvals

Final Approval:

Issued after all checklist items are cleared

Key Milestones in a Permit Review Sequence

Follow these numbered stages to monitor progress from application to approval.

01

1. Application Filed

Submission accepted and assigned a tracking number.

02

2. Completeness Check

Reviewer confirms required documents and fees are present.

03

3. Technical Review

Discipline reviewers evaluate code compliance and calculations.

04

4. Final Resolution

Approval, conditional approval, or denial recorded on the checklist.

eSignature Vendor Comparison for Permit Review Checklists

Compare starting price and key features relevant to secure eSubmission and signature collection for permit documentation.

signNow DocuSign Adobe Sign PandaDoc HelloSign
Starting Price $8/user/mo $15/user/mo $14/user/mo $19/user/mo $15/user/mo
Free Trial Yes, 7-day trial No No Yes, limited Yes, limited
Bulk Send Yes Yes Yes Yes No
HIPAA Compliant Yes Yes Yes No No

Frequently Asked Questions About Using the Permit Review Checklist

Answers to common issues encountered when preparing, submitting, and revising permit checklists in an electronic workflow.