Project ID
Project name, job number, contract reference, and location to ensure the checklist is tied to the correct construction contract and files.
A structured checklist reduces disputes, accelerates permitting and coordination, clarifies safety and access responsibilities, and documents preconstruction conditions that affect cost and schedule.
Typical participants in the preconstruction walkthrough and recipients of the completed checklist.
The checklist creates a single agreed record that all parties reference during early project execution.
The GC or designated superintendent typically completes most inspection items, notes existing site conditions, and signs to confirm mobilization readiness and safety plan alignment with contract requirements.
The owner or owner’s rep reviews the checklist to confirm delivered scope, access and staging plans, and to record any preexisting damage or utility discrepancies before construction commences.
Project name, job number, contract reference, and location to ensure the checklist is tied to the correct construction contract and files.
Gates, laydown areas, staging, traffic control, and key contact information so crews know where and when to mobilize safely and legally.
Permit numbers, inspection status, utility disconnects or live services, and required approvals to prevent work stoppages after mobilization.
Photographs and notes documenting preexisting damage, vegetation, grading, and structures that may affect scope or lead to claims.
Site-specific hazards, required PPE, containment measures, and erosion controls that must be in place before work begins.
Signature lines, dates, and links or attachments for photos, permits, and vendor records to create an auditable project record.
| Field | Configuration |
|---|---|
| Authentication | Email or SMS code for signer verification |
| Template | Save as reusable project template |
| Integrations | Map to Procore, Box, or Google Drive |
| Storage | Auto-save signed PDF to project folder |
Choose a platform that supports common file types and your project management integrations for efficient routing.
Conduct 7–14 days before scheduled mobilization
Complete after required permits are issued
Share findings at least 5 business days before work starts
Issue corrective items within 3 business days
Obtain within project mobilization period
Arrange attendee list and set date well before mobilization.
Document conditions, take photos, and note required remedies.
Distribute required actions and responsible parties.
Verify completed items and collect final signatures.
A GC documents preexisting pavement cracks and utility markings on-site
An owner and architect verify tenant fit‑out clearances and MEP shutoffs during walkthrough
| signNow | DocuSign | Adobe Sign | PandaDoc | HelloSign | |
|---|---|---|---|---|---|
| Starting Price | $8/user/mo | $15/user/mo | $14/user/mo | $19/user/mo | $15/user/mo |
| Free Trial | 7-day free trial | Varies by plan | Varies by plan | Varies by plan | Varies by plan |
| Bulk Send | Yes | Yes | Yes | Yes | No |
| Audit Trail | Yes | Yes | Yes | Yes | Yes |
| Envelope Cap | No cap | 100 envelopes/user/year | Varies by plan | Varies by plan | Varies by plan |