Material Identification
Exact material name, manufacturer part number, grade or ASTM/ISO designation, and proprietary identifiers to avoid ambiguity during procurement and inspection.
A well completed Product Material Selection Form reduces rework, prevents specification mismatches, and documents regulatory or safety obligations. It improves procurement accuracy, shortens supplier onboarding, and supports warranty and traceability obligations.
The form is used across product, procurement, quality, and regulatory teams before materials are ordered or approved.
Multiple parties often sign: requesters, approvers, QA inspectors, and supplier representatives to verify acceptance of the listed materials and terms.
Exact material name, manufacturer part number, grade or ASTM/ISO designation, and proprietary identifiers to avoid ambiguity during procurement and inspection.
Required mechanical, thermal, electrical, or chemical properties with test method references (for example ASTM or ISO methods) and acceptable tolerance bands.
Surface finish requirements, coatings, dimensional tolerances, and inspection sampling plans to guide manufacturing and incoming inspection.
Applicable regulatory classifications, hazard statements, RoHS/REACH status, flammability ratings, and any required certification or testing evidence.
Approved vendor name, supplier part number, lead time, lot traceability requirements, and contact information for quality or logistics escalations.
Signed approval blocks for engineering, procurement, and quality with effective date, revision number, and change request reference for future amendments.
| Field | Configuration |
|---|---|
| Signature Type | Electronic signature or drawn signature field |
| Authentication | Email verification or SMS code for approvers |
| Conditional Logic | Show supplier fields only if custom vendor selected |
| Auto-reminders | Set reminders at 3 and 7 days for pending approvals |
Ensure your platform supports required authentication, file formats, and integrations before going live.
Confirm storage encryption, audit trail retention, and role-based access controls align with internal policies before accepting electronic signatures.
Complete form at least 30 days before planned purchase order issuance.
Confirm lead times within 5 business days of submission to procurement.
Schedule incoming inspection within 10 business days of delivery.
Allow 7–14 days for engineering change approvals depending on impact.
Archive signed form to records system within 14 days of final approval.
| signNow | DocuSign | Adobe Sign | PandaDoc | HelloSign | |
|---|---|---|---|---|---|
| Starting Price | $8/user/mo | $15/user/mo | $14/user/mo | $19/user/mo | $15/user/mo |
| Free Trial | 7-day free trial | Varies by vendor | Varies by vendor | Varies by vendor | Varies by vendor |
| Bulk Send | Yes | Yes | Yes | Yes | No |
| Audit Trail | Yes | Yes | Yes | Yes | Yes |
| HIPAA Compliant | Yes | Yes | Yes | No | No |
| Envelope Cap | No cap | 100 envelopes/user/year | Varies by plan | Varies by plan | Varies by plan |