Cover Sheet
Lists project name, address, owner, sheet index, revision log, permit numbers and the effective approved date for the package.
Clear, complete Project Approved Plans reduce rework, support inspections, and help avoid permit revocation. When retained in an auditable system they also satisfy record-retention rules and support electronic signatures executed under ESIGN (15 U.S.C. §7001) or UETA where applicable.
Several roles interact with approved plans during permitting and construction.
Each stakeholder needs access to the same, version-controlled approved set to prevent conflicts and comply with jurisdictional conditions.
The project manager coordinates submissions and ensures the approved plan set is distributed to contractors, inspectors, and the owner; they do not replace professional stamps but often sign administrative transmittals and change notices.
A licensed architect or engineer provides the professional stamp or seal, signs certification pages, and attests to code compliance; jurisdictions may require that this signature be original, notarized, or meet RON requirements.
Lists project name, address, owner, sheet index, revision log, permit numbers and the effective approved date for the package.
Show property lines, setbacks, utilities, grading, drainage, and building footprint with dimensions and notes tied to permit conditions.
Architectural, structural, mechanical, electrical and plumbing drawings with sufficient detail for bidding, permitting, and construction.
Material and performance requirements, product standards, and workmanship expectations that clarify items shown on drawings.
Stamps, signatures, review comments, and conditions issued by the authority having jurisdiction, including any required corrections.
A dated log of changes, who approved them, and version identifiers to ensure teams work from the correct set.
| Field | Configuration |
|---|---|
| Upload Format | Use PDF/A for archival compatibility |
| Signer Order | Set licensed professional first, then owner |
| Authentication | Use email plus SMS or KBA for key signers |
| Audit Trail | Enable full timestamps and IP logging |
Choose a platform that supports signed PDFs, version control, and secure distribution to permitting authorities.
Varies by jurisdiction; typically 10–30 business days
Submit corrected plans per reviewer deadline
Book inspections once approved sheets are on-site
Issued after final inspections and approvals
Record required documents per local rules
All required sheets and payment submitted to plan reviewer.
Authority issues comments or conditional approval.
Design team returns corrected pages for recheck.
Stamped approved set issued and recorded as needed.
Tim Martin finalized plan sets online for a multi-unit renovation to avoid in-person signings and streamline permits.
Optica Ventures standardized its approved-plan package to include indexed revisions and approval pages for each project.
| signNow | DocuSign | Adobe Sign | PandaDoc | HelloSign | |
|---|---|---|---|---|---|
| Starting Price | $8/user/mo | $15/user/mo | $14/user/mo | $19/user/mo | $15/user/mo |
| Free Trial | 7-day trial | No | No | Yes, limited | Yes, limited |
| Bulk Send | Yes | Yes | Yes | Yes | No |
| Audit Trail | Yes | Yes | Yes | Yes | Yes |
| HIPAA Compliant | Yes | Yes | Yes | No | No |