Cover & Summary
Project name, address, client, scope summary, and a concise compliance statement summarizing code references and high-level energy metrics.
A well-structured Project Lighting Report reduces permit review time, lowers the risk of rework, and documents compliance with applicable codes and standards. It creates a single authoritative reference for design intent, contractor execution, and future facility management.
The report is prepared and used by multiple professionals during design, permitting, and construction.
Clear role assignment in the report reduces confusion and ensures each party has the information needed for inspections and operations.
A technical lead or project manager signs to confirm the report represents the completed design and coordination; signature confirms responsibility for accuracy and compliance during construction.
A licensed engineer or architect signs when required by local code; their stamp and signature validate calculations and certify compliance with state licensing rules.
Project name, address, client, scope summary, and a concise compliance statement summarizing code references and high-level energy metrics.
Scaled layout drawings showing fixture locations, ceiling plans, switchgear, control zones, and labeled reference callouts linked to the fixture schedule.
Complete list of luminaires with manufacturer, model, lumen output, color temperature, mounting type, wattage, and photometric file references.
Illuminance and uniformity calculations (lux/footcandles), assumptions, calculation grid spacing and method, and results tables for key zones.
Control strategies, occupancy sensor zones, daylight dimming, scheduled setbacks, and estimated energy use or savings compared with baseline.
Referenced code sections, test reports, cut sheets, IES files, and any special permit forms or variance documentation included as exhibits.
| Field | Configuration |
|---|---|
| Signer Authentication | Use email with optional SMS code or stronger verification for licensed signers |
| Conditional Fields | Show license and stamp fields only when 'Licensed Professional' is selected |
| File Format | Submit consolidated PDF with bookmarked sections for easy reviewer navigation |
| Storage Connector | Enable cloud archive to approved repository such as Box or Google Drive |
Use file formats and integrations that your plan reviewer accepts to avoid resubmission.
Ensuring format compatibility and direct storage links streamlines reviewer access and long-term recordkeeping.
Submit before construction begins; local departments often require complete filings.
Expect 2–6 weeks for initial review depending on jurisdiction workload.
Respond to reviewer comments promptly; many authorities allow 30 days to reply.
Schedule electrical inspections after installation and before final occupancy clearance.
Incomplete or incorrect reports commonly lead to resubmission and extended approval timelines.
Finalize layouts and calculations before submitting for permit review.
Receive permit approval prior to beginning physical installation.
Complete wiring, mounting, and control integration per the approved report.
Document changes and produce signed as-built report for the owner and archive.
| Criteria | Manual PDF | Digital template |
|---|---|---|
| Ease of reuse | low | high |
| Error rate | higher | lower |
| Turnaround | slower | faster |
| Audit trail | limited | comprehensive |
| signNow | DocuSign | Adobe Sign | PandaDoc | HelloSign | |
|---|---|---|---|---|---|
| Starting Price | $8/user/mo | $15/user/mo | $14/user/mo | $19/user/mo | $15/user/mo |
| Free Trial | 7-day free trial | Varies | Varies | Varies | Varies |
| Bulk Send | Yes | Yes | Yes | Yes | Varies |
| Audit Trail | Yes | Yes | Yes | Yes | Yes |
| HIPAA Compliant | Yes | Yes | Yes | No | No |
A mid-size office retrofit was packaged with full photometrics and fixture cut sheets
A property manager used the report to verify energy savings for a tenant fit-out