Establishing secure connection…Loading editor…Preparing document…

Project Lighting Report

This template is fully customizable. Edit the text, fill out the fields, and send it for signature. Give it a try!

PROJECT LIGHTING REPORT AND SERVICES AGREEMENT

This Project Lighting Report and Services Agreement ("Agreement") is entered into by and between Client Name: and Contractor Name: .

WHEREAS

WHEREAS, Contractor conducts lighting surveys, measurements, design and installation services and prepares technical reports documenting existing conditions, measured photometric data, and recommended corrective actions; and

WHEREAS, Client desires Contractor to perform a lighting survey and provide a written report, recommendations and, if accepted, to perform related lighting services at the project identified below in accordance with the terms of this Agreement; and

WHEREAS, the parties intend that this Report shall document factual measurements, professional findings, and provide a binding scope and terms governing any subsequent services performed pursuant to those findings.

PROJECT IDENTIFICATION

SCOPE OF WORK

Contractor shall perform a lighting survey and provide the deliverables described below. The Scope of Work includes field measurements, fixture inventory, photometric analysis, written report with recommended corrective actions, and a cost estimate for recommended retrofit or replacement work as described herein.

SURVEY FINDINGS

Provide an inventory summary, measured levels, and immediate safety concerns. Use the fields below to summarize the most critical findings.

RECOMMENDATIONS & ESTIMATE

PAYMENT TERMS

Client shall pay Contractor the fees specified below in consideration for survey services and any subsequently authorized installation work. All amounts are in lawful currency and exclude applicable taxes unless otherwise stated.

TERM AND TERMINATION

This Agreement commences on Start Date and continues through End Date unless earlier terminated in accordance with this section.

Either party may terminate this Agreement for material breach if the breaching party fails to cure within the stated notice period. Upon termination, Client shall pay Contractor for all services performed and documented expenses incurred through the effective date of termination.

CONFIDENTIALITY

Each party agrees to hold all non-public information disclosed by the other party in strict confidence and to use such information solely for performing obligations under this Agreement. Confidential information does not include information that is or becomes publicly available through no fault of the receiving party, is rightfully received from a third party without restrictions, or is independently developed.

By checking, the party acknowledges the confidentiality obligations described above.

GOVERNING LAW

This Agreement shall be governed by and construed in accordance with the laws of the State of without regard to its conflict of law provisions.

ENTIRE AGREEMENT

This Agreement, including all attachments and referenced exhibits, constitutes the entire agreement between the parties with respect to the subject matter hereof and supersedes all prior and contemporaneous agreements, understandings, and communications, whether written or oral. Any modification to this Agreement must be in writing and signed by authorized representatives of both parties.

ATTACHMENTS & DELIVERABLES

The following items are delivered or will be delivered with this Report (check all that apply):

Drawings / As-built fixture locations    Photograph log    Photometric calculations    Product specification sheets

CERTIFICATION

Contractor certifies that the measurements, observations and recommendations documented in this Report are accurate to the best of Contractor's knowledge based on the site conditions observed on the Inspection Date. Contractor's professional opinions are provided in good faith and based upon industry standards and accepted engineering practice.

Client acknowledges that Client retains responsibility for final design decisions, permitting, and compliance with applicable codes and regulations. Contractor's scope is limited to the services expressly set forth in this Agreement.

Client Name:

By:

Date:

Contractor Name:

By:

Date:

Enter text✕

What a Project Lighting Report Is and When It’s Used

A Project Lighting Report documents the lighting design for a building or site, combining plans, fixture schedules, photometric calculations, energy use estimates, control strategies, and code references. It demonstrates compliance with local energy and building codes, supports permit applications, and provides a technical record for contractors, owners, and inspectors. Typical contents include layout drawings, luminaire specifications, lighting level calculations (lux/footcandles), daylighting analysis, emergency/egress lighting plans, and a summary of assumptions and methods used to derive energy and performance figures.

Why a Clear Lighting Report Matters

A well-structured Project Lighting Report reduces permit review time, lowers the risk of rework, and documents compliance with applicable codes and standards. It creates a single authoritative reference for design intent, contractor execution, and future facility management.

Why a Clear Lighting Report Matters

Who Typically Prepares and Reviews These Reports

The report is prepared and used by multiple professionals during design, permitting, and construction.

  • Lighting designers and electrical engineers responsible for calculations, controls, and fixture selection.
  • General contractors and subcontractors who need installation details and as-built verification.
  • Building owners, facilities managers, and permitting authorities who accept the report during review.

Clear role assignment in the report reduces confusion and ensures each party has the information needed for inspections and operations.

Authorized Signers and Their Roles

Project Manager

A technical lead or project manager signs to confirm the report represents the completed design and coordination; signature confirms responsibility for accuracy and compliance during construction.

Licensed Professional

A licensed engineer or architect signs when required by local code; their stamp and signature validate calculations and certify compliance with state licensing rules.

Core Sections to Include in a Professional Report

Organize the Project Lighting Report into clear sections so reviewers and contractors can find calculations, drawings, and compliance evidence quickly.

Cover & Summary

Project name, address, client, scope summary, and a concise compliance statement summarizing code references and high-level energy metrics.

Drawings

Scaled layout drawings showing fixture locations, ceiling plans, switchgear, control zones, and labeled reference callouts linked to the fixture schedule.

Fixture Schedule

Complete list of luminaires with manufacturer, model, lumen output, color temperature, mounting type, wattage, and photometric file references.

Photometric Calculations

Illuminance and uniformity calculations (lux/footcandles), assumptions, calculation grid spacing and method, and results tables for key zones.

Controls & Energy

Control strategies, occupancy sensor zones, daylight dimming, scheduled setbacks, and estimated energy use or savings compared with baseline.

Compliance Appendix

Referenced code sections, test reports, cut sheets, IES files, and any special permit forms or variance documentation included as exhibits.

Step-by-Step: Preparing and Submitting a Lighting Report

Follow these sequential steps to prepare, review, and submit a compliant report for permitting and construction.

  • 01
    Collect project data: Gather drawings, room usage, mounting heights, and control requirements.
  • 02
    Produce drawings: Create scaled lighting plans and label fixture locations and control zones.
  • 03
    Run calculations: Perform photometric and energy calculations, document assumptions and grid results.
  • 04
    Review and sign: Technical lead and licensed professional review, sign, and attach supporting cut sheets.

Typical Submission Workflow for Review and Approval

A consistent workflow helps coordinate permit intake, reviewer comments, and inspections.

  • Prepare Package: Assemble report, drawings, cut sheets, and calculations into a single file set.
  • Submit to Authority: File with the local building department or plan review portal per jurisdiction rules.
  • Respond to Comments: Revise calculations or drawings and resubmit with a response letter.
  • Record Retention: Archive the signed as-built report for operations and future audits.

Digital Workflow Settings for eSubmission and Review

Configure your digital workflow to streamline signing, authentication, and storage for the report package.

Field Configuration
Signer Authentication Use email with optional SMS code or stronger verification for licensed signers
Conditional Fields Show license and stamp fields only when 'Licensed Professional' is selected
File Format Submit consolidated PDF with bookmarked sections for easy reviewer navigation
Storage Connector Enable cloud archive to approved repository such as Box or Google Drive

Technical Formats and Integrations to Consider

Use file formats and integrations that your plan reviewer accepts to avoid resubmission.

  • Supported Formats: PDF, DOCX, and XLSX for calculations
  • Integrations: Salesforce, NetSuite, Microsoft 365 compatibility
  • Storage: Connectors for Box, Google Drive, and Egnyte

Ensuring format compatibility and direct storage links streamlines reviewer access and long-term recordkeeping.

Typical Timelines and Review Expectations

Timing varies by jurisdiction and project scope; anticipate permit review cycles and plan for revisions.

Permit Submission:

Submit before construction begins; local departments often require complete filings.

Plan Review Time:

Expect 2–6 weeks for initial review depending on jurisdiction workload.

Response Window:

Respond to reviewer comments promptly; many authorities allow 30 days to reply.

Inspection Scheduling:

Schedule electrical inspections after installation and before final occupancy clearance.

Resubmission:

Incomplete or incorrect reports commonly lead to resubmission and extended approval timelines.

Key Project Milestones from Design to As-Built

Track these milestones to align lighting documentation with permitting, installation, and commissioning.

01

Design Completion

Finalize layouts and calculations before submitting for permit review.

02

Permit Approval

Receive permit approval prior to beginning physical installation.

03

Installation

Complete wiring, mounting, and control integration per the approved report.

04

Final As-Built

Document changes and produce signed as-built report for the owner and archive.

Common Preparation Errors to Avoid

  • Omitting control strategy details leads to unclear energy compliance and failed inspections.
  • Using inconsistent project names or addresses causes permit files to be misapplied or delayed.
  • Failing to attach photometric files or luminaire cut sheets forces reviewers to request missing documents.
  • Relying on handwritten or scanned signature images without a verifiable audit trail increases review friction.

Risks and Consequences of an Incomplete Report

Permit Delay: Extended project schedule and possible added costs
Code Violation: Correction orders or required rework
Safety Hazards: Noncompliant lighting affecting egress or task visibility
Increased Cost: Change orders and retrofit expenses
Inspection Failure: Repeat inspections and administrative fines
Liability Exposure: Contractual or warranty disputes with installers

Comparing Manual PDFs and Digital Report Templates

Choose the option that best balances repeatability, accuracy, and reviewer requirements for your projects.

Criteria Manual PDF Digital template
Ease of reuse low high
Error rate higher lower
Turnaround slower faster
Audit trail limited comprehensive

eSignature Pricing and Feature Comparison for Report Signing

The table compares starting price, trial availability, bulk send, audit trail presence, and HIPAA support across common eSignature vendors; signNow is listed first in the comparison.

signNow DocuSign Adobe Sign PandaDoc HelloSign
Starting Price $8/user/mo $15/user/mo $14/user/mo $19/user/mo $15/user/mo
Free Trial 7-day free trial Varies Varies Varies Varies
Bulk Send Yes Yes Yes Yes Varies
Audit Trail Yes Yes Yes Yes Yes
HIPAA Compliant Yes Yes Yes No No

Practical Examples of How Lighting Reports Are Used

These scenarios show typical uses and outcomes when a clear lighting report is provided to reviewers and contractors.

Municipal Permit Review

A mid-size office retrofit was packaged with full photometrics and fixture cut sheets

  • Reviewer requested one clarifying drawing
  • The revised report resolved comments and the permit issued without further delay, avoiding schedule impact.

Commercial Retrofit

A property manager used the report to verify energy savings for a tenant fit-out

  • Calculations supported incentive applications
  • The documented savings enabled utility rebate approval and faster tenant occupancy.

Frequently Asked Questions and Troubleshooting

Practical answers to common questions about preparing, signing, and submitting Project Lighting Reports electronically.


Need help? Contact support

be ready to get more
Join over 28 million airSlate SignNow users