Final Drawings
Scaled plans updated to show all field changes, clearly annotated and dated so future users can locate equipment and routed systems quickly.
A complete as-built reduces disputes, speeds closeout, and preserves warranty and maintenance rights by recording actual installed conditions and approved changes. It also supports permit closure, facility turnover, and accurate asset inventories for operations teams.
Multiple project stakeholders prepare or rely on as-built records during closeout and handover.
Properly completed as-built records reduce operational risk and serve as the single source of truth for future work.
Scaled plans updated to show all field changes, clearly annotated and dated so future users can locate equipment and routed systems quickly.
Signed change order copies that explain deviations from original scope and establish approved substitutions or omissions.
Manufacturer names, model and serial numbers, installation dates, and commissioning statuses to support warranties and replacements.
Commissioning and QA test results demonstrating system performance and acceptance criteria were met at turnover.
High-resolution photos showing installed conditions, critical junctions, and inaccessible components for future troubleshooting.
Signatures from responsible parties, including inspectors and engineers, documenting acceptance and compliance.
| Field | Configuration |
|---|---|
| Signer Order | Contractor → Engineer → Owner sequential |
| Authentication | Email + optional SMS code |
| Required Fields | Measurements, dates, and cert blocks enforced |
| Attachments | Allow photos and PDF exhibits |
Choose delivery and storage methods that preserve file fidelity, audit trails, and access controls before sending.
Ensure your chosen platform supports the integrations and export formats required by owners and regulatory reviewers.
Often required at contract closeout, commonly within 30–90 days.
Effective date often tied to final acceptance or certificate of occupancy.
Submit concurrently with as-built for systems under warranty.
Local authorities may require as-built for final permit closeout.
Owner maintains records per contract and legal retention rules.
Document as-installed conditions and collect measurements.
Share preliminary as-built for design review and corrections.
Obtain engineer and owner sign-offs on final package.
Archive signed as-built and distribute final copies.
| signNow | DocuSign | Adobe Sign | PandaDoc | HelloSign | |
|---|---|---|---|---|---|
| Starting Price | $8/user/mo | $15/user/mo | $14/user/mo | $19/user/mo | $15/user/mo |
| Free Trial | 7-day free trial | Varies by plan | Varies by plan | Varies by plan | Varies by plan |
| Bulk Send | Yes | Yes | Yes | Yes | No |
| Audit Trail | Yes | Yes | Yes | Yes | Yes |
| HIPAA Compliant | Yes | Yes | Yes | No | No |
A municipal renovation documented field piping reroutes with annotated drawings and serial numbers.
A commercial fit-out recorded final electrical panel changes and labeling for equipment.