Scope
Defines work boundaries, excluded items, deliverables, and any subcontracted processes so responsibility is unambiguous and change orders are limited.
A well-structured fabrication order reduces miscommunication, prevents rework, and aligns technical and commercial expectations between client and fabricator.
Typical participants include project managers, procurement leads, fabrication shops, QA inspectors, and the client’s technical representative.
Successful completion requires clear signatory authority, version control for drawings, and a confirmed delivery and inspection plan.
Defines work boundaries, excluded items, deliverables, and any subcontracted processes so responsibility is unambiguous and change orders are limited.
Engineering drawings or CAD files with revision numbers, dimensions, tolerances, and finish notes; reference which file formats are contractually controlling.
Material grade, certifications, heat treatment, coating and supplier approvals required to meet mechanical and corrosion performance targets.
Inspection criteria, sampling plans, test methods, and acceptance thresholds; include required reports such as first-article inspection and nondestructive testing.
Milestones for design approval, material procurement, production start, inspection, and final delivery with explicit lead times and float allowances.
Pricing, payment milestones, warranty, liability limits, and dispute resolution clauses tied to deliverable acceptance.
| Field | Configuration |
|---|---|
| Upload Specification Files | Accept PDF, DWG, or STEP; lock files after upload. |
| Approver Order | Route: Engineering → Procurement → Client Technical Rep. |
| Signer Authentication | Use email link or SMS code for signer verification. |
| Retention Policy | Store signed PDF/A copies with audit trail. |
Choose a platform that supports PDF, DOCX, DWG attachments and preserves an audit trail.
Client sign-off required before material ordering.
Orders placed after this date may extend lead time.
Date when fabrication activities may begin.
Inspection window prior to shipment.
Contractual delivery date for acceptance.
Client approves drawings and revisions; triggers material order.
Supplier lead times fulfilled and materials received.
Plate manufacturing, welding, and finishing per specs.
Final QA, nondestructive testing, and acceptance sign-off.
Optica issued a consolidated fabrication order with locked drawings and milestone payments to reduce approvals.
Martin Properties used electronic orders for facade plates across multiple sites.
| signNow | DocuSign | Adobe Sign | PandaDoc | HelloSign | |
|---|---|---|---|---|---|
| Starting Price | $8/user/mo | $15/user/mo | $14/user/mo | $19/user/mo | $15/user/mo |
| Free Trial | 7-day free trial, no credit card | Varies by vendor | Varies by vendor | Varies by vendor | Varies by vendor |
| Bulk Send | Yes (Business Premium) | Varies by plan | Varies by plan | Varies by plan | Varies by plan |
| Audit Trail | Yes | Yes | Yes | Yes | Yes |
| HIPAA Compliant | Yes (BAA available) | Varies by plan | Varies by plan | Varies by plan | Varies by plan |
| Envelope Cap | No envelope cap | 100 envelopes/user/year limit | Varies by plan | Varies by plan | Varies by plan |