Project Management Design Phase Approval

This template is fully customizable. Edit the text, fill out the fields, and send it for signature. Give it a try!

PROJECT MANAGEMENT DESIGN PHASE APPROVAL

Project Identification

Approval Request Date:

Purpose and Recitals

This Project Management Design Phase Approval (the "Approval") documents the Client's formal acceptance of the design phase deliverables prepared by the Service Provider and sets the basis for progressing to subsequent phases. The parties acknowledge that the Provider has prepared design materials as described below and that the Client's approval will authorize commencement of implementation activities per the Project Plan.

Scope of Work — Design Phase

Deliverables and Acceptance Criteria

List each design deliverable, the target delivery date, and the acceptance criteria that the Client will use to approve the deliverable.

Target Delivery Date:

Target Delivery Date:

Target Delivery Date:

Timeline and Milestones

Phase Start Date: Phase End Date:

Milestone 1 - Title

Target Date: Responsible Party:

Milestone 2 - Title

Target Date: Responsible Party:

Milestone 3 - Title

Target Date: Responsible Party:

Budget and Payment

Total Design Phase Budget: $

Change Order Process

Any modification to the scope, schedule, or budget of the Design Phase must be documented in a written change order signed by authorized representatives of both parties. The change order shall specify the scope of the change, impact on schedule, and additional fees, if any. Primary contacts for change order requests:

Confidentiality

All design documents, drawings, specifications, and related communications shared between the parties during the Design Phase are Confidential Information. Each party will hold Confidential Information in strict confidence, use it solely for performance under this Approval, and not disclose it to third parties except as permitted in writing. This obligation survives termination of the Agreement and this Approval for a period of three (3) years, or longer if required by separate confidentiality agreement between the parties.

By checking this box the signatory confirms that the Confidentiality clause is acknowledged and will be observed.

Governing Law

This Approval shall be governed by and construed in accordance with the laws of the jurisdiction specified below, excluding conflict of law rules. The parties agree that disputes arising under this Approval will be resolved in the courts or dispute resolution forum specified.

Approval Certification

The undersigned, having authority to bind the respective party, certify that they have reviewed the design phase deliverables and related terms set forth in this Approval. By signing, the Client either: (a) approves the listed design deliverables and authorizes the Service Provider to proceed to the next project phase in accordance with the stated schedule and budget; or (b) identifies exceptions in writing requiring remedial action prior to approval.

Design Phase Approval Status: Design Phase Approved Approved with Exceptions (attach exception list)

By signing below the authorized representatives certify acceptance of the design deliverables and agree to the terms set forth herein.

Client

Printed Name:

By:

Date:

Service Provider

Printed Name:

By:

Date:

Enter text✕

What the Project Management Design Phase Approval Is

A Project Management Design Phase Approval is a written authorization that confirms the completion and acceptance of design deliverables before work advances to the next contract stage. It documents scope, deliverables, budget impacts, and acceptance criteria, and records which parties authorize moving from design into procurement, permitting, or construction. This approval functions as a control point in project governance: it limits scope change drift, triggers budget and schedule updates, and creates a clear audit trail for both internal stakeholders and external regulators or funders.

Why a Formal Design Phase Approval Matters

A formal approval reduces ambiguity about what was delivered and agreed, supports contract compliance, and protects parties against later disputes. It creates a dated, signed record that ties design outputs to acceptance criteria and budget authorization, which simplifies downstream change control and invoicing.

Why a Formal Design Phase Approval Matters

Who typically completes the Design Phase Approval

Use this form whenever design deliverables require formal sign-off to unlock subsequent procurement, permitting, or construction activities.

  • Project managers and program directors who verify deliverables against scope and schedule.
  • Client or owner representatives who confirm acceptance and authorize next-phase funds or permits.
  • Design leads and engineers who certify that technical drawings and specifications meet contract requirements.

Step-by-step: Completing and routing the approval

Follow these sequential steps to fill out the form, validate deliverables, obtain signatures, and archive the completed approval.

  • 01
    Prepare: Attach design deliverables and list revision numbers.
  • 02
    Validate: Design lead confirms technical compliance with contract.
  • 03
    Authorize: Owner/client signs to accept scope and budget impacts.
  • 04
    Archive: Store signed approval in project records and update trackers.

Recommended online workflow settings for e-submission

Configure the digital workflow to enforce signer order, require fields, and capture an audit trail so approvals are traceable and admissible.

Field Configuration
Signer Order Sequential (Design lead → PM → Owner)
Required Fields Scope, Effective Date, Signatures required
Authentication Email + SMS code or stronger when needed
Retention Set immutable archive with exportable audit trail

Where to send the form and how it progresses

A clear routing path prevents review bottlenecks and ensures the approval is actionable once signed.

  • Prepare Document: Upload signed PDFs or final CAD/plan attachments for reviewer access.
  • Assign Signers: Add emails in the configured order and set required fields.
  • Route for Approval: System notifies each signer and enforces sequential signing.
  • Archive Signed Copy: Export final PDF and save to project repository with audit log.

Technical requirements for eSubmission and storage

Ensure exportable audit trails and accessible archives for compliance, procurement audits, and claims prevention.

  • File formats: PDF, DOCX, and common image attachments
  • Integrations: Salesforce, NetSuite, Procore, Microsoft 365 supported
  • Security layers: TLS in transit; AES-256 at rest

Core components every professional approval should include

A comprehensive approval form ties technical deliverables to acceptance criteria, documents budget effects, and records authorized signatories.

Project ID

Unique identifier linking the approval to the master contract and all project tracking systems to prevent misfiling.

Scope Description

Concise description of included deliverables, referenced drawings, and excluded items so acceptance boundaries are explicit.

Deliverables List

Enumerate deliverable types and revision numbers (plans, specifications, studies) to avoid later disputes about versions.

Acceptance Criteria

Define measurable criteria for technical, regulatory, and constructability acceptance so reviewers apply consistent standards.

Budget & Costs

Record approved budget adjustments, contingency usage, and whether a change order is required to proceed to the next phase.

Signatures & Dates

Capture printed names, roles, signatures, and dates for each approver; include electronic signature metadata for auditability.

Supporting items to attach with the approval

Include core attachments that reviewers rely on to confirm compliance, completeness, and cost impacts before authorizing the next phase.

Final Drawings

Include PDFs or DWG files with revision numbers and a cover sheet listing included files and versions.

Specification Sheets

Attach technical specs and referenced industry standards cited in the acceptance criteria.

Cost Estimate

Provide a current cost estimate and a comparison against budget lines, highlighting any variances or contingency usage.

Compliance Permits

Attach applicable permit applications, regulatory approvals, or outstanding permit conditions affecting next-phase work.

Security and compliance checklist for stored approvals

Encryption: AES-256 at rest
Transport: TLS 1.2/1.3
Audit Trail: Detailed event timestamps
Access Control: Role-based permissions
Compliance: SOC 2 Type II, ISO 27001
HIPAA BAA: Available when required

Key risks of incomplete or incorrect approvals

Schedule Delay: Project hold-ups
Cost Overrun: Change-order expenses
Contract Breach: Legal exposure
Payment Withhold: Invoices may be refused
Regulatory Risk: Permit denials
Record Loss: Claims vulnerability

Common mistakes when preparing the approval

  • Failing to reference revision numbers for drawings leads to acceptance of incorrect versions and later rework or disputes.
  • Leaving budget impacts unspecified creates ambiguity about funding for changes and can delay procurement or construction mobilization.
  • Not enforcing required signer order permits unauthorized approvals and weakens contractual defenses in later claims.
  • Using inconsistent project identifiers across documents causes misfiling and increases administrative time to reconcile records.

Typical eSignature pricing and capability comparison

Basic pricing and feature availability across common eSignature providers. signNow is listed first per comparison conventions; confirm vendor terms before purchasing.

signNow DocuSign Adobe Sign PandaDoc HelloSign
Starting Price $8/user/mo $15/user/mo $14/user/mo $19/user/mo $15/user/mo
Free Trial 7-day free trial Varies Varies Varies Varies
Bulk Send Yes Yes Yes Yes No
Audit Trail Yes Yes Yes Yes Yes
HIPAA Compliant Yes Yes Yes No No

Typical timelines and expected response windows

Define deadlines clearly on the form so reviewers know response expectations and escalation rules for overdue approvals.

Submission Deadline:

Submit final design package 10 business days before planned review

Review Period:

Standard 5–10 business days for technical review

Approval Decision:

Owner decision within agreed review window

Appeal Window:

5 business days to dispute or request clarification

Mobilization Start:

Construction may begin after permit and approval conditions are met

Key milestones from submission to archival

Track approvals through numbered stages so stakeholders can monitor progress and dependencies at each milestone.

01

Draft Submission

Design team submits final deliverables and supporting documents for review.

02

Technical Review

Design lead and PM validate compliance with contract and standards.

03

Client Authorization

Owner signs acceptance confirming budget and scope for next phase.

04

Archive & Update

Store signed approval in the project repository and update project controls.

Practical tips for accurate and efficient approvals

Adopt repeatable practices to reduce errors, accelerate approvals, and preserve defensible records for audits or disputes.

Use standardized templates
Standard templates reduce interpretation errors and ensure every approval consistently captures scope, deliverables, budget impact, and signatory authority.
Enforce signer order
Require sequential signatures where technical validation occurs before managerial or owner authorization to prevent premature approvals.
Include revision control
Reference revision numbers and attach a cover sheet listing included files to ensure reviewers act on the correct versions.
Preserve an audit trail
Capture timestamps, IP addresses, and authentication events for each signature to strengthen evidentiary value in disputes or audits.

How a Design Phase Approval compares with concept or milestone approvals

Compare common approval types to select the correct formality level based on legal effect, required signers, and typical retention.

Criteria Design Phase Approval Concept Approval
Required Signatures pm, owner pm only
Formality high low
Typical Timing end of detailed design early feasibility
Legal Effect triggers budget/contract changes informational only

Real-world examples of using a Design Phase Approval

Two practical scenarios illustrate how the approval reduces risk and clarifies who can authorize next-phase actions.

Architect Firm Example

A mid-size architecture firm finalizes drawings and issues the approval to the owner for procurement authorization.

  • Signers: design lead, PM, client rep.
  • The documented approval prevented a scope dispute during procurement and provided the owner a dated acceptance to release long-lead equipment orders.

Contractor Project Example

A general contractor requires signed design approval before mobilizing to site to avoid scope creep.

  • Signers: contractor PM and owner.
  • The approval clarified required changes, authorized a contingency draw, and allowed safe mobilization without later stop-work claims.

Typical signatory roles and responsibilities

Project Manager

The Project Manager consolidates design deliverables, verifies acceptance criteria, and coordinates routing. They ensure required documents are attached and that the approval is entered into project controls for traceability.

Owner Representative

The Owner Representative reviews technical acceptance, confirms budget or funding authorization, and provides the final signature to enable procurement or construction activities; their signature typically triggers payment milestones.

FAQs and troubleshooting for common approval issues

Answers to frequent questions about validity, digital signatures, signatory authority, and correcting signed approvals.


Need help? Contact support

be ready to get more
Join over 28 million airSlate SignNow users