Title Sheet
Provides project name, owner, drawing index, revision log, and responsible authors to establish chain of custody and context for the set.
A well-prepared Project Management Drawing Package reduces ambiguity, speeds permitting and bidding, and centralizes revisions for auditability. It clarifies scope for contractors, aligns stakeholders on deliverables, and preserves an auditable record of decisions and approvals throughout the project lifecycle.
Project managers, design engineers, architects, contractors, and permit coordinators commonly assemble or consume drawing packages during planning and execution.
The package supports multiple handoffs—internal approvals, permitting authorities, and downstream contractors—so each role should understand expected contents and version control conventions.
Provides project name, owner, drawing index, revision log, and responsible authors to establish chain of custody and context for the set.
Contains contractual and drawing interpretation notes, applicable codes and standards, and project-specific assumptions that affect construction or permitting.
Discipline-specific layout drawings (architectural, structural, MEP) with consistent scale, gridlines, and referencing to details and sections.
Expanded drawings for critical assemblies, showing materials, fasteners, tolerances, and coordination points between trades.
Chronological record of changes with dates, authors, and approval stamps to support traceability and dispute resolution.
Metadata for file names, version numbers, distribution list, and signing/approval records used for recordkeeping and quality control.
| Field | Configuration |
|---|---|
| Signer Order | Sequential or parallel routing depending on dependencies |
| Authentication | Email link with optional SMS code or KBA for stronger identity |
| Required Fields | Signature, initials, date, and approval checkbox |
| Retention Settings | Automatic archive of signed PDF and audit record |
Choose distribution methods that preserve metadata, maintain security, and support audit trails for approvals.
Confirm receivers can open the chosen file format (PDF/A preferred) and that the delivery method records the transaction for compliance and disputes.
3–10 business days depending on scope and number of disciplines
Typically 5–15 business days; document dependencies can extend this
Varies by jurisdiction; commonly 10–60 business days
Issue package with a defined walk-through and Q&A period
Publish final-for-construction set after approvals and archiving
Discipline leads submit initial sheets for coordination and clash review.
Interdisciplinary clash detection and issue resolution occur.
No further edits allowed without formal revision control.
Publish signed final-for-construction set and notify recipients.
Project team compiled a consolidated package for permitting
Small firm used an indexed drawing set to coordinate trades
| signNow | DocuSign | Adobe Sign | PandaDoc | HelloSign | |
|---|---|---|---|---|---|
| Starting Price | $8/user/mo | $15/user/mo | $14/user/mo | $19/user/mo | $15/user/mo |
| Free Trial | Yes, 7-day trial | No | No | Yes, limited | Yes, limited |
| Bulk Send | Yes | Yes | Yes | Yes | No |
| Audit Trail | Yes | Yes | Yes | Yes | Yes |
| HIPAA Compliant | Yes | Yes | Yes | No | No |