Scope of Work
Detailed tasks, deliverables, exclusions, and acceptance criteria including charger models, quantities, and site layout drawings.
A single, consistent document reduces coordination errors, supports permit review, establishes contractual responsibilities, and creates an auditable trail for payments and regulatory compliance. It also streamlines vendor onboarding and enables faster approvals when signed and shared electronically under ESIGN/UETA frameworks.
This package is used by both public and private stakeholders during planning, permitting, and construction of EV charging sites.
Each stakeholder group uses the document for different purposes: permitting evidence, contract enforcement, technical acceptance, or audit trail for incentives and utility interconnection.
Detailed tasks, deliverables, exclusions, and acceptance criteria including charger models, quantities, and site layout drawings.
Milestones for procurement, permitting, electrical upgrades, installation, testing, and commissioning with responsible parties and durations.
Itemized cost estimates, payment schedule, retainage, change order process, and invoicing requirements tied to milestones.
List of required local permits, interconnection forms, utility approvals, inspection steps, and expected lead times.
Electrical load calculations, meter and distribution details, grounding, signage, ADA access, and environmental constraints.
Commissioning procedures, acceptance tests, documentation to deliver, training sessions, and warranty start dates.
| Field | Configuration |
|---|---|
| Signer Order | Sequential or parallel routing based on approvals. |
| Authentication | Email link plus SMS code or KBA for higher assurance. |
| Conditional Fields | Show permit-specific fields when permit type selected. |
| Integrations | Map attachments to PM/ERP or cloud storage systems. |
Choose tools that produce a clear audit trail, support required file formats, and integrate with your project management systems.
Submit 2–8 weeks before planned installation depending on jurisdiction.
Allow 4–12 weeks for study and approvals.
Charger and transformer delivery commonly 6–16 weeks.
Typical install for a small lot: 1–3 weeks of onsite work.
Schedule 1–3 days per site for acceptance tests.
Confirm load capacity and site constraints early.
Obtain local building and electrical permits.
Execute civil and electrical work on schedule.
Complete testing and provide signed acceptance documents.
As a small developer, the team needed simple, reliable signing for partners and tenants.
A real estate operator used centralized signed packages to handle multiple property rollouts.
| signNow | DocuSign | Adobe Sign | PandaDoc | HelloSign | |
|---|---|---|---|---|---|
| Starting Price | $8/user/mo | $15/user/mo | $14/user/mo | $19/user/mo | $15/user/mo |
| Free Trial | Yes — 7-day free trial | Varies by vendor | Varies by vendor | Varies by vendor | Varies by vendor |
| Bulk Send | Yes (Premium plan) | Yes | Yes | Yes | Yes |
| Audit Trail | Yes | Yes | Yes | Yes | Yes |
| HIPAA Compliant | Yes | Yes | Yes | No | No |
| Envelope Cap | No cap | 100 envelopes/user/year | Varies | Varies | Varies |