Establishing secure connection…Loading editor…Preparing document…

Project Management Field Change Order

This template is fully customizable. Edit the text, fill out the fields, and send it for signature. Give it a try!

PROJECT FIELD CHANGE ORDER

Project Identification

Client Name:

Service Provider:

Project Manager (Client):    Project Manager (Provider):

Original Contract Date: / /

Change Order Number:    Change Order Date: / /

Reason for Change

Scope of Work (Field Change)

Description of Change (work to be added, modified, or deleted):

Deliverables and Acceptance Criteria

Deliverable 1 Description:

Acceptance Criteria:

Deliverable 2 Description:

Acceptance Criteria:

Schedule and Milestones

Proposed Change Start Date: / /

Proposed Change Completion Date: / /

Target Date: / /

Target Date: / /

Cost / Price Impact

Summary of Cost Impact (Net change to contract price): $

Pricing Basis:

Fixed price for scope as defined

Time and materials with not-to-exceed amount of $

Change Order Process and Conditions

This Change Order constitutes a modification to the Contract Documents identified above. Work described herein shall not commence until this Change Order is signed by authorized representatives of both parties. Unless otherwise expressly stated, all terms and conditions of the original contract remain in full force and effect. Any conflict between this Change Order and the Contract shall be governed by the Contract's written change order provisions.

Time impact: The Service Provider shall provide written substantiation of any required time extension. Any extension to the contract completion date resulting from this Change Order shall be granted only by written amendment signed by both parties. The Client may require acceleration or mitigation measures, with any additional costs to be addressed through further agreement.

Changes to downstream work, testing, commissioning or third-party approvals that arise from this Change Order are the responsibility of the Service Provider unless otherwise agreed in writing. The Service Provider shall obtain and pay for any permits or notices required specifically for the changed work unless the parties agree otherwise in writing.

Confidentiality

All information provided or developed in connection with this Change Order shall be treated as confidential to the extent it is designated confidential or is reasonably understood to be confidential. Neither party shall disclose confidential information to third parties except as necessary to perform obligations under this Change Order or as required by law, provided the disclosing party gives the other party prompt notice of any compelled disclosure.

Indemnity and Liens

The Service Provider shall indemnify, defend and hold harmless the Client from claims, losses, damages, and expenses arising from the performance of this Change Order to the extent caused by the Service Provider's negligent acts, omissions or willful misconduct. The Service Provider warrants it will pay for labor and materials furnished and shall promptly discharge any liens or claims filed by subcontractors or suppliers arising from the changed work.

Governing Law

This Change Order shall be governed by and construed in accordance with the laws of the jurisdiction specified in the original contract. Venue for any dispute arising from this Change Order shall be in the courts identified in the Contract, unless otherwise agreed in writing by the parties.

Approvals and Notices

Certifications and Acknowledgements

By signing below the parties certify that: (a) they are authorized to execute this Change Order on behalf of their respective organizations; (b) the facts and costs stated herein are accurate to the best of their knowledge; (c) this Change Order, when executed by both parties, amends the Contract only as to the items expressly set forth herein; and (d) no other modifications to the Contract are made except by separate written agreement.

Client Name:

By:

Date:

Service Provider:

By:

Date:

Enter text✕

What a Project Management Field Change Order Is

A Project Management Field Change Order is a written record that documents an on-site change to project scope, cost, schedule, or materials after work has begun. It captures the original request, a clear description of the changed work, estimated cost impact, revised schedule, and required approvals so parties can proceed with a shared, auditable instruction. When signed by authorized parties it creates a contractual amendment enforceable under the agreement terms and applicable electronic-signature law (ESIGN Act, 15 U.S.C. ch. 96, and UETA where adopted). Use it to reduce disputes and track downstream effects.

Why Field Change Orders Matter to Project Outcomes

A clear change order protects budget, schedule, and quality by creating an auditable record of what was changed, why, and who approved it. It reduces ambiguity, accelerates approvals, and supports accurate invoicing and claims.

Why Field Change Orders Matter to Project Outcomes

Who Typically Prepares and Signs Change Orders

Field Change Orders are used by multiple project stakeholders to capture and authorize revisions made on site.

  • Project managers and construction superintendents who document scope changes and submit official requests for approval.
  • Contractors and subcontractors who propose costs, schedule impacts, and implementation details for the changed work.
  • Owners and client representatives who review, approve, or reject change proposals and authorize budget adjustments.

Properly completed and signed change orders help align expectations, enable timely payment, and reduce later claims or litigation.

Essential Parts of a Professional Field Change Order

A thorough change order combines narrative, technical details, and formal approvals so each party understands the change and its consequences.

Change Summary

Concise statement of what is changing, including reference to the original contract section or drawing affected and a short reason for the change.

Scope Details

Detailed description of added, deleted, or modified work with sufficient technical detail so field crews and inspectors can act without ambiguity.

Cost Impact

Line-item or lump-sum cost estimate showing labor, materials, equipment, markup, and whether the price is provisional or firm.

Schedule Impact

Estimated change to milestones or completion dates, including any acceleration or delay measures and critical-path implications.

Approvals

Designated signature blocks for contractor, owner, and project manager with dates and role titles to establish authorization and responsibility.

Supporting Docs

Attachments such as drawings, photos, measurements, material submittals, and labor estimates that justify the change and support audits.

Stepwise Process to Create and Approve a Field Change Order

Follow these sequential steps from identification to implementation to ensure traceability and minimize disruption.

  • 01
    Identify Change: Record who found the issue and why the change is necessary.
  • 02
    Assess Impact: Estimate cost, schedule, and subcontractor effects.
  • 03
    Draft Order: Complete the change order form with attachments and calculations.
  • 04
    Obtain Approvals: Secure signatures from authorized parties before work proceeds.

How Digital Change Orders Move Through a Project Workflow

Digital workflows speed routing, preserve history, and reduce lost or unsigned paperwork when configured correctly.

  • Upload Document: Add the completed form and supporting files to the system.
  • Place Fields: Map signature, date, and calculation fields on the page.
  • Send for Review: Route to signers in the required order with notifications.
  • Archive: Store executed orders with audit trail for future reference.

Recommended Digital Workflow Settings for Change Orders

Configure a few core settings to balance signer convenience with secure evidence of approval.

Field Configuration
Authentication Method Email link with optional SMS code for higher assurance
Conditional Fields Show cost fields only when 'Cost Impact' is yes
Routing Order Sequential: Contractor → PM → Owner
Document Format PDF/A recommended for long-term retention

Technical Requirements for eSubmission and Signatures

Choose a platform that supports required authentication, audit trails, and file formats used by your team.

  • Integrations: Works with Procore, Microsoft 365, Google Workspace, NetSuite
  • File formats: Accepts PDF, DOCX, and image files
  • Authentication: Supports email, SMS, and advanced signer verification

Verify the platform can produce an immutable audit trail, store signed PDFs, and meet any contractual or industry compliance requirements.

Key Timing Expectations for Change Order Handling

Set and communicate firm timelines to avoid disputes and expedite work.

Submission Timeframe:

Submit change requests within 5 business days of discovery

Approval Turnaround:

Target 7–14 calendar days to review and approve change orders

Emergency Work Authorization:

Document and sign emergency authorizations within 48 hours

Invoice Submission:

Submit associated invoices within 30 days of approval

Dispute Window:

Raise disputes within contract-specified period, typically 30–60 days

Milestone Timeline for a Typical Change-Order Life Cycle

A concise milestone view helps stakeholders track progress from request to implementation.

01

Issue Identified

Field team documents the problem and requests a change order.

02

Cost & Schedule Assessment

Contractor calculates impacts and prepares backup documentation.

03

Approval Decision

Owner or authorized rep accepts or rejects the proposed change.

04

Implementation

Approved changes are executed and records updated.

Common Pitfalls When Preparing Field Change Orders

  • Vague descriptions that leave scope open to interpretation, increasing risk of rework and disputes.
  • Missing supporting evidence such as photos, measurements, or referenced drawings that justify costs.
  • Failing to obtain required signatures before work begins, which can create payment or warranty disputes.
  • Not updating project schedules or notifying downstream subcontractors, causing coordination and sequencing failures.

Risks and Consequences of Incorrect or Unsigned Change Orders

Cost Overruns: Owner may deny additional payment
Schedule Delays: Work may be paused pending approval
Contract Breach: Claim exposure and potential litigation
Liens Risk: Subcontractors may file liens for unpaid work
Withheld Payment: Payments potentially withheld until resolution
Audit Exposure: Poor records increase audit findings

Security and Compliance Considerations for Electronic Change Orders

Transport Encryption: TLS 1.2/1.3
Data at Rest: AES-256 encryption
Audit Trail: Timestamps, IP, and action history
Regulatory Compliance: ESIGN and UETA adherence
Healthcare: HIPAA requires BAA where PHI present
Certifications: SOC 2 Type II and ISO 27001

Selected eSignature Vendor Comparison for Change-Order Workflows

Comparison of common vendor attributes relevant to executing and tracking change orders; signNow is shown first per platform ordering rules.

signNow DocuSign Adobe Sign PandaDoc HelloSign
Starting Price $8/user/mo $15/user/mo $14/user/mo $19/user/mo $15/user/mo
Free Trial 7-day free trial Yes Yes Yes Yes
Bulk Send Yes Yes Yes Yes No
Audit Trail Yes Yes Yes Yes Yes
HIPAA Compliant Yes Yes Yes No No

Real-World Examples of Documented Change Orders

Two brief examples show how timely, well-documented change orders prevented disputes and kept projects on track.

Martin Properties

On a tight renovation project, the team required rapid approvals for scope modifications.

  • "I can process and execute all of these documents online with 100% compliance and built-in security."
  • The quick, auditable approvals reduced downtime and allowed crews to resume work the same day, avoiding a projected three-day delay.

BIS

A services firm needed consistent signature capture across mobile crews to bill time and materials accurately.

  • "We felt most comfortable with airSlate SignNow given their SOC 2 certification..."
  • Standardized change orders with photo evidence and signature timestamps improved invoicing accuracy and reduced client disputes over scope.

Practical Tips to Improve Change-Order Accuracy and Speed

Adopt these practices to reduce rework and accelerate approvals while maintaining a defensible record.

Use a Standard Template
Standardized forms reduce omissions, make review faster, and ensure all required evidence and signers are captured in every change order.
Attach Visual Proof
Include photos, marked-up drawings, and measurements to substantiate cost and scope claims and expedite reviewer understanding.
Define Approval Authorities
Specify who can approve which cost thresholds to prevent improper sign-offs and accelerate routine decisions.
Keep an Audit Trail
Preserve timestamps, IP addresses, and version history to support billing, claims, and compliance reviews.

Frequently Asked Questions About Field Change Orders

Answers to common questions about validity, signatures, attachments, and corrections when handling field change orders.


Need help? Contact support

be ready to get more
Join over 28 million airSlate SignNow users