Project Summary
Concise project description, location, building use and occupancy, area square footage, and scope boundaries so reviewers understand the design context and limits.
A well-prepared heat load design reduces sizing errors, avoids overspecified equipment, shortens approval cycles, and provides a single source of truth for contractors and owners. It supports accurate procurement, minimizes change orders, and documents compliance with applicable mechanical and energy codes.
Typical users include mechanical engineers, HVAC designers, general contractors, building owners, and project managers who coordinate procurement and installation.
Concise project description, location, building use and occupancy, area square footage, and scope boundaries so reviewers understand the design context and limits.
Detailed room-by-room sensible and latent loads, peak design conditions, diversity factors, and calculation method (e.g., ASHRAE or Manual J) so equipment is sized accurately.
Climate data, internal gains, occupancy schedules, thermostat setpoints, and envelope R-values documented to justify the inputs and enable later verification.
Recommended equipment type and capacity, redundancy strategy, part-load performance data, and control recommendations tied to the calculated loads.
Ventilation rates, outdoor-air economizer strategy, filtration levels, and control sequence summaries required for commissioning and compliance.
Code citations, permitting checklist, reviewer sign-off blocks, and spaces for engineer stamp, dates, and any required notarization or attestations.
| Field | Configuration |
|---|---|
| File Format | Use PDF/A for signed deliverables and DWG or IFC for source drawings. |
| Reviewer Roles | Assign primary reviewer, mechanical reviewer, and owner approver in that order. |
| Authentication | Choose email link or two-factor authentication for external reviewers. |
| Archive Policy | Store versioned PDFs with audit trails and retain originals for the retention period. |
Deliverables typically include searchable PDFs, native CAD files for coordination, and a signed calculation report suitable for permit submission.
Typically 2–6 weeks from brief depending on project complexity.
Submit once final drawings and signed calculations are complete.
Local building departments often take 2–8 weeks to review.
Allow 8–16 weeks for long-lead HVAC items.
Schedule during system turnover; typically 1–4 weeks.
Collect drawings, utility data, and occupancy schedules.
Produce first-run load tables and sizing recommendations.
Incorporate architectural and structural input.
Issue stamped reports and signed PDFs for permitting.
| signNow | DocuSign | Adobe Sign | PandaDoc | HelloSign | |
|---|---|---|---|---|---|
| Starting Price | $8/user/mo | $15/user/mo | $14/user/mo | $19/user/mo | $15/user/mo |
| Free Trial | Yes, 7-day trial | No | No | Yes, limited | Yes, limited |
| Bulk Send | Yes | Yes | Yes | Yes | No |
| Audit Trail | Yes | Yes | Yes | Yes | Yes |
| HIPAA Compliant | Yes | Yes | Yes | No | No |
| Envelope Cap | No envelope cap | 100 envelopes/user/year | Varies by plan | Varies by plan | Varies by plan |