Site Details
Precise address, GPS coordinates, contact, and site access instructions to eliminate ambiguity during transport and reinstallation.
A consistent relocation form reduces ambiguity between owners, contractors, and utilities, speeds approvals by centralizing required data, and clarifies compliance and safety obligations for each milestone in the transfer of microgrid components.
Project teams and agencies use the form to align technical, commercial, and regulatory responsibilities before and during relocation.
The completed form serves as a coordination record for operations, permitting authorities, and financial approvers.
Project Manager — Signs to confirm technical completeness and schedule acceptance. Typically responsible for coordinating contractors, confirming equipment lists, and certifying that safety and permitting preconditions are met before physical moves commence.
Asset Owner — Signs for financial and legal authority to relocate. The owner approves budget changes, authorizes disconnection/reconnection, and confirms insurance and liability arrangements for the relocation activity.
Precise address, GPS coordinates, contact, and site access instructions to eliminate ambiguity during transport and reinstallation.
Make, model, serial number, weights, and handling notes for every asset moved, including batteries, inverters, and switchgear.
Planned disconnect, transport, staging, and reconnection windows with contingency dates and estimated crew hours per phase.
List of required permits, application numbers, issuing authority, and current approval status to demonstrate regulatory compliance.
Site-specific hazard analysis, PPE requirements, lockout/tagout procedures, and emergency contact information for field teams.
Signatures for financial approval, estimated relocation costs, and any pre-approved change order thresholds.
| Field | Configuration |
|---|---|
| Site Information | Required; read-only for utility reviewers |
| Equipment List | Repeating section; validates serial formats |
| Schedule Fields | Date pickers with MM/DD/YYYY format |
| Approval Blocks | Sequential routing to signers |
Ensure chosen systems encrypt data in transit and at rest, capture signer attribution, and retain an auditable certificate of completion for compliance.
File at least 30–90 days before planned relocation start
Submit per utility window, commonly 14–30 days prior
Confirm transport and staging dates 7–14 days before move
Book final inspection 3–7 days before reconnection
Deliver reconciliation and as-built documentation within 30 days
Document review and sign-off that authorizes procurement and contractor engagement.
Receipt of required local and utility permits enabling field work.
On-site disconnection, transport, and reinstallation of microgrid components.
Final inspections, interconnection tests, and delivery of as-built records.
| Criteria | Microgrid Relocation Form | Generic Project Form |
|---|---|---|
| Equipment detail | extensive asset data | high-level list |
| Utility coordination | mandatory utility sign-off | optional |
| Permitting focus | permit numbers tracked | general permit note |
| Safety plan | site-specific loto and testing | standard safety checklist |
| signNow | DocuSign | Adobe Sign | PandaDoc | HelloSign | |
|---|---|---|---|---|---|
| Starting Price | $8/user/mo | $15/user/mo | $14/user/mo | $19/user/mo | $15/user/mo |
| Free Trial | Yes, 7-day trial | Vendor-specific | Vendor-specific | Vendor-specific | Vendor-specific |
| Bulk Send | Yes | Yes | Yes | Yes | No |
| Audit Trail | Yes | Yes | Yes | Yes | Yes |
| HIPAA Compliant | Yes | Yes | Yes | No | No |
A city used the form to synchronize utility windows and vendor lift schedules.
A campus operations team recorded battery serials and transport specs in the form.