Project Management Plumbing Tie-Ins

This template is fully customizable. Edit the text, fill out the fields, and send it for signature. Give it a try!

Project Management Plumbing Tie-Ins

Project Identification

Date Issued:

Scope of Work

This Statement of Work sets forth the obligations of the Service Provider to perform plumbing tie-in work at the Site Address described above. The work shall include cutting, capping, tying into existing mains or laterals, pressure testing, installation of fittings and valves, restoration of penetrations, protection of adjacent systems, and final flushing and cleanup in accordance with the acceptance criteria below. The Service Provider shall furnish labor, materials, tools, equipment, certifications, and supervision necessary to complete the work unless otherwise stated.

Deliverables & Acceptance Criteria

Deliverables shall be submitted for acceptance in the sequence below. Acceptance requires written confirmation by the Client that the deliverable meets the acceptance criteria. Acceptance shall not be unreasonably withheld.

Due Date:

Due Date:

Timeline & Milestones

Project Start Date:     Project End Date:

Milestone 1 Due:

Milestone 2 Due:

Budget & Payment

Total Lump Sum for Scope:

Retainage (if applicable):

Charge Basis:

If Time & Materials: Hourly Labor Rate:

Permits, Inspections & Safety

The Service Provider is responsible for obtaining all permits, arranging inspections as required by authorities having jurisdiction, and complying with applicable safety regulations. The Service Provider shall coordinate with the Client regarding scheduled shutdowns necessary for tie-ins and shall provide advance notice of at least: days prior to any planned shutdown affecting operations.

Insurance, Indemnity & Warranty

The Service Provider shall maintain commercial general liability, workers' compensation, and automobile liability insurance with limits sufficient for the scope of work and shall provide certificates of insurance upon request. The Service Provider shall indemnify and hold the Client harmless from claims arising out of Service Provider's performance, except to the extent such claims are caused by the Client's negligence.

Acceptance Testing & Final Acceptance

Acceptance testing will include, at a minimum: visual inspection, pressure testing to the levels specified in the acceptance criteria, verification of fittings and valve operation, and delivery of as-built drawings and test reports. Final acceptance occurs upon written confirmation by the Client that all acceptance criteria have been satisfied.

Termination, Remedies & Force Majeure

Either party may terminate this Statement of Work for material breach if the breaching party fails to cure within days after written notice. Neither party shall be liable for failure or delay caused by force majeure events beyond reasonable control, provided prompt notice is given and efforts to mitigate are undertaken.

Confidentiality

Each party shall maintain the confidentiality of the other's confidential information and shall not disclose such information except as necessary to perform obligations under this Statement of Work or as required by law. Confidential information does not include information that is or becomes public through no wrongful act of the receiving party.

Governing Law

This Statement of Work shall be governed by and construed in accordance with the laws of: without regard to conflict of laws principles.

Notices

Client:

By:

Date:

Service Provider:

By:

Date:

Enter text✕

What the Project Management Plumbing Tie-Ins document is

The Project Management Plumbing Tie-Ins document is a construction project template that records the plan, schedule, responsible parties, permits, safety checks, and inspection requirements for tying new plumbing systems into existing utilities. It centralizes location details, connection methods, shut-down windows, approved materials, and required municipal approvals so stakeholders have a single authoritative record for field crews, engineers, inspectors, and owners during execution and closeout.

Why a clear tie-in package matters for projects

A professional tie-in package reduces coordination delays, clarifies responsibilities, and documents compliance with permits and codes. It helps avoid rework, speeds inspections, and preserves an audit trail of approvals and signatures for liability, warranty, and payment processes.

Why a clear tie-in package matters for projects

Typical parties who complete and use this form

The document is used across the project team to coordinate field work, approvals, and final sign-off.

  • Project managers and general contractors responsible for scheduling tie-in windows and coordinating trades.
  • Plumbing contractors and forepersons who perform the physical connection and document materials and tests.
  • Municipal inspectors and utility representatives who verify permit compliance and approve final connection.

Use it to assign tasks, schedule inspections, and create a signed record for acceptance and invoicing.

Who signs and approves plumbing tie-in records

Project Manager

The Project Manager reviews scope, schedules inspections, confirms permit approvals, and signs to accept responsibility for coordination. Their signature confirms the tie-in was scheduled and communicated to affected stakeholders.

Plumbing Contractor

A licensed Plumbing Contractor or authorized superintendent signs to confirm work performed, materials used, pressure/leak tests passed, and adherence to code and permit conditions.

Step-by-step: completing a plumbing tie-in record

Follow these sequential steps to prepare, approve, and file the tie-in record so inspection and invoicing proceed without interruption.

  • 01
    Prepare scope: Document location, materials, shut-down plan, and risk controls.
  • 02
    Secure permits: Attach permit numbers and any utility authorizations before work begins.
  • 03
    Perform tie-in: Execute work, run pressure/leak tests, and record results.
  • 04
    Sign and file: Collect required signatures and submit to owner and inspector.

How to configure the digital workflow for tie-in approvals

Configure the workflow so documents route automatically to stakeholders, require the right authentication, and produce a retention-ready audit trail.

Field Configuration
Signature Order Sequential routing: Contractor → PM → Inspector
Authentication Level Email + SMS code or ID verification for inspectors
Auto-Reminders Daily until signed, with escalation copies
File Formats PDF final; DOCX working copy retained

Typical submission and routing flow for the tie-in form

A clear routing flow ensures each party reviews and signs in order, and that a certified copy is stored for records and invoicing.

  • Upload: Sender uploads completed form and attachments.
  • Place fields: Add signature, date, and checkbox fields for tests and permits.
  • Route to signers: Send to contractor, PM, then inspector in that order.
  • Store final: Save signed PDF with audit log to project folder.

Integrations and file requirements for electronic tie-in workflows

Use integrations and supported formats to embed the tie-in process in your project systems.

  • Document formats: PDF, DOCX, XLSX supported
  • Project integrations: Procore, NetSuite, Box integration available
  • Authentication methods: Email, SMS, KBA, SSO options

Essential components of a professional tie-in package

A complete package bundles scope, test results, schedules, approvals, and signatures so it serves as both execution guidance and a permanent record.

Scope of Work

Concise description of tasks, affected systems, and required shut-down procedures so field crews and owners share the same plan and risk controls.

Location Diagram

A simple annotated drawing or photo showing the exact tie-in point, valve IDs, and adjacent systems to avoid mistaken connections or collateral damage.

Schedule

Clear work window with start/end dates, crew assignments, and contingency time to coordinate utilities and inspections without disrupting operations.

Safety Checks

Pre-work lockout/tagout steps, PPE requirements, confined-space notes, and post-work verification to document hazard controls and compliance.

Permits & Tests

Permit numbers, inspection requests, and results from pressure and leak tests recorded with timestamps for inspector review and acceptance.

Signatures

Authorized signer names, signatures, and dates from contractor, project manager, and inspector to finalize acceptance and enable invoicing.

Required data elements to capture on the form

Project ID: Unique project identifier
Permit No.: Issuing agency number
Contractor Name: Licensed business name
Test Results: Pressure/leak pass/fail
Signatures: Signer name and date
Attachments: Diagrams and photos

Common eSignature vendor pricing and feature snapshot

Signatures for tie-in records are commonly handled by enterprise eSignature platforms; the table below summarizes starting prices and a few feature differences among vendors.

signNow DocuSign Adobe Sign PandaDoc HelloSign
Starting Price $8/user/mo $15/user/mo $14/user/mo $19/user/mo $15/user/mo
Free Trial 7-day free trial Varies Varies Varies Varies
Bulk Send Yes (Business Premium) Varies Varies Varies Varies
Audit Trail Yes Yes Yes Yes Yes
HIPAA Compliant Yes Yes Yes No No

Key milestones for tie-in execution and approvals

Track these milestones in sequence from planning to final acceptance so approvals and invoicing are aligned with completed work.

01

Planning Complete

Scope, permits, and shut-down plan finalized before mobilization.

02

Permit Issued

Permit approval received and scheduled inspection window defined.

03

Work Performed

Tie-in executed and tests completed within the authorized window.

04

Inspection Accepted

Inspector signs off and final acceptance documented for invoicing.

Typical timing expectations and scheduling notes

Allow adequate lead time for permits, utility coordination, and inspector availability to avoid costly rescheduling.

Permit lead time:

Allow 7–30 business days depending on jurisdiction and permit backlog.

Inspection scheduling:

Schedule inspections at least 3–5 business days ahead to secure a slot.

Work window:

Confirm start and end times to avoid after-hours fees or utility shutdown conflicts.

Record submission:

Submit signed tie-in records within 48–72 hours of inspection acceptance for closeout.

Retention start:

Retention period begins on the signature/acceptance date for most records.

Common preparation mistakes to avoid

  • Incomplete location descriptions that lead to crews working at the wrong connection point and causing rework or utility interruptions.
  • Missing permit numbers or expired permits that result in stop-work orders and delayed inspections.
  • Unclear responsibility for shut-down and restart sequences, causing safety risks and coordination failures with utilities.
  • Failing to attach test evidence (photos/logs) which forces inspectors to request repeat tests and increases project costs.

Potential consequences of incorrect or incomplete tie-in records

Permit Violation: Fines or stop-work orders
Inspection Failure: Re-tests and added labor costs
Liability Claim: Exposure for property damage
Payment Delay: Invoices held until signed acceptance
Warranty Issues: Disputed coverage on defective work
Compliance Risk: Regulatory penalties or remediation

Illustrative examples of tie-in documentation use

These two scenarios show how a complete tie-in package reduces delays and produces a clean acceptance record.

Commercial Retrofit Example

A mid-size office retrofit required overnight shut-downs to tie new risers.

  • The contractor scheduled three nights to avoid tenant impact.
  • The signed tie-in record, photos, and test logs proved compliance and enabled prompt final payment without dispute.

Municipal Water Main Tap

A municipality required utility liaison and a recorded permit before any tap.

  • Coordinated scheduling prevented service interruptions.
  • The completed package satisfied the inspector, closed the permit, and was retained in the public project file for audit.

Frequently asked questions and troubleshooting

Answers to common questions about legality, notarization, signatures, and practical issues when using tie-in documents electronically.


Need help? Contact support

be ready to get more
Join over 28 million airSlate SignNow users